A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to...A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.展开更多
A 28 V-half-regulated power bus topology and an integrated PCDU (Power Conditioning and Distribution Unit) were adopted to meet the energy demand for the Chang'e 4 relay satellite.This paper first introduces the m...A 28 V-half-regulated power bus topology and an integrated PCDU (Power Conditioning and Distribution Unit) were adopted to meet the energy demand for the Chang'e 4 relay satellite.This paper first introduces the mission features and composition of the PSDS (Power Supply and Distribution System) for the Chang'e 4 relay satellite.Due to this satellite's unusual orbit,operational mode and project restrictions,special analysis and design was conducted on the PSDS from the perspective of weight-reduction,power management,and reliability and so on.Extreme low temperature storage of SA (Solar Array) was considered and how the antenna affects the SA was analyzed.A new kind of high-specific-energy 45 Ah (Ampere-hour) battery cell was used for the first time.To make sure that the satellite would successfully pass the long shadow zones,a 100% DOD (Depth of Discharge) experiment was carried out on the battery.Since the sunlight is almost always available and there are very few times for the battery to charge or discharge,battery care to extend its lifetime is also discussed.PCDU is a device that integrates power conditioning and power distribution in one unit.The PCDU on Chang'e 4 relay satellite can output more power with less weight because of the adoption of a 28 V-half-regulated power bus topology which was also used for the first time and used lighter material for its mechanical framework.Experiment under low temperature on PCDU was conducted as well and a hot backup equalizing charge technique which is beneficial to keep performance of the battery is illustrated.The power distribution module,which is a module of PCDU,enhances the power utilization security by utilizing a static impedance measurement and build-in-test to avoid possible short circuits.As for EED (Electrical Explosive Device) module,a protection plug was specially designed and three switches with different functions were connected in series to prevent the EED from exploding by error.In addition,the allowable minimum EED bus voltage for each EED was evaluated in case of low battery voltage caused by the possible postponement of the launching time.Complete verification experiments on the ground were conducted to confirm the correctness of the design and on-orbit test data conformed to the expected results and theoretical calculation.The power supply and distribution system has been working normally since the day the Chang'e 4 relay satellite was launched into space.展开更多
The Bayesian networks (BNs) provide a robust probabilistic method of reasoning under uncertainty and have been successfully applied to a variety of real-world tasks. Aiming to explore the capabilities of the BN formal...The Bayesian networks (BNs) provide a robust probabilistic method of reasoning under uncertainty and have been successfully applied to a variety of real-world tasks. Aiming to explore the capabilities of the BN formalism in reliability analysis of monotone coherent multi-state systems, the BNs are compared with a popular tool for reliability analysis of monotone coherent multi-state systems, namely the multi-state fault trees (MFTs). It is shown that any MFT can be directly mapped into BN and the basic inference techniques on the latter may be used to obtain classical parameters computed from the former (i.e. probability distribution of top variable, minimal upper vectors and maximum lower vectors for any performance level, importance measures of components). Furthermore, some additional information can be obtained by using BN, both at the modeling and analysis level. At the modeling level, several restrictive assumptions implicit in the MFT methodology can be removed and various kinds of dependencies among components can be accommodated. At the analysis level, a general diagnostic analysis can be performed. The comparison of these methods is illustrated by an example of the water supply system. ? 2016 Beijing Institute of Aerospace Information.展开更多
Conventional maintenance mode for the traction power supply system(TPSS)is to perform scheduled regular maintenance activities for power supply equipment,while such maintenance mode may result in undue maintenance tas...Conventional maintenance mode for the traction power supply system(TPSS)is to perform scheduled regular maintenance activities for power supply equipment,while such maintenance mode may result in undue maintenance tasks and low efficiency due to different degradation processes of different sorts of equipment.To address this problem,this paper introduces a preventive opportunistic maintenance(POM)method for TPSS based on equipment reliability.Firstly,a POM model is established by considering the equipment reliability degradation process based on Weibull distribution.Then,by considering the total power outage time in the planned operation cycle of TPSS as the optimization objective,the optimal maintenance scheme of TPSS is formulated by iterative method of maintenance strategies.The proposed method is verified by introducing practical maintenance strategies and fault record data of the traction transformer,circuit breaker and disconnector in an actual TPSS of a railway administration.Results show that the presented method can make full use of the existing fault data to develop a POM scheme for TPSS.It can improve maintenance efficiency and reduce power outage time,providing guidance to formulate scientific maintenance strategies for TPSS.展开更多
针对现有目标检测模型在无依托供电场景存在检测效果不稳定、小目标大量漏检的问题,基于YOLOv4-tiny提出一种改进模型AMS-YOLOv4-tiny。通过在主干网之后引入更平滑的Mish函数、设计一种浅层特征加固的特征融合网络SCFPN、反复嵌入通道...针对现有目标检测模型在无依托供电场景存在检测效果不稳定、小目标大量漏检的问题,基于YOLOv4-tiny提出一种改进模型AMS-YOLOv4-tiny。通过在主干网之后引入更平滑的Mish函数、设计一种浅层特征加固的特征融合网络SCFPN、反复嵌入通道注意力机制3种策略,大幅提升预测特征层对目标的表达能力。实验结果表明,算法在PASCAL VOC07+12数据集上的mAP(mean of average precision)达到87.19%,相比YOLOv4-tiny提高4.45%,且部署在嵌入式设备上进行可行性验证,满足多种复杂场景下人车检测任务的精度与实时性要求。展开更多
文摘A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.
文摘A 28 V-half-regulated power bus topology and an integrated PCDU (Power Conditioning and Distribution Unit) were adopted to meet the energy demand for the Chang'e 4 relay satellite.This paper first introduces the mission features and composition of the PSDS (Power Supply and Distribution System) for the Chang'e 4 relay satellite.Due to this satellite's unusual orbit,operational mode and project restrictions,special analysis and design was conducted on the PSDS from the perspective of weight-reduction,power management,and reliability and so on.Extreme low temperature storage of SA (Solar Array) was considered and how the antenna affects the SA was analyzed.A new kind of high-specific-energy 45 Ah (Ampere-hour) battery cell was used for the first time.To make sure that the satellite would successfully pass the long shadow zones,a 100% DOD (Depth of Discharge) experiment was carried out on the battery.Since the sunlight is almost always available and there are very few times for the battery to charge or discharge,battery care to extend its lifetime is also discussed.PCDU is a device that integrates power conditioning and power distribution in one unit.The PCDU on Chang'e 4 relay satellite can output more power with less weight because of the adoption of a 28 V-half-regulated power bus topology which was also used for the first time and used lighter material for its mechanical framework.Experiment under low temperature on PCDU was conducted as well and a hot backup equalizing charge technique which is beneficial to keep performance of the battery is illustrated.The power distribution module,which is a module of PCDU,enhances the power utilization security by utilizing a static impedance measurement and build-in-test to avoid possible short circuits.As for EED (Electrical Explosive Device) module,a protection plug was specially designed and three switches with different functions were connected in series to prevent the EED from exploding by error.In addition,the allowable minimum EED bus voltage for each EED was evaluated in case of low battery voltage caused by the possible postponement of the launching time.Complete verification experiments on the ground were conducted to confirm the correctness of the design and on-orbit test data conformed to the expected results and theoretical calculation.The power supply and distribution system has been working normally since the day the Chang'e 4 relay satellite was launched into space.
基金supported by the National Natural Science Foundation of China(7090102471371067)the Chinese Postdoctoral Science Foundation
文摘The Bayesian networks (BNs) provide a robust probabilistic method of reasoning under uncertainty and have been successfully applied to a variety of real-world tasks. Aiming to explore the capabilities of the BN formalism in reliability analysis of monotone coherent multi-state systems, the BNs are compared with a popular tool for reliability analysis of monotone coherent multi-state systems, namely the multi-state fault trees (MFTs). It is shown that any MFT can be directly mapped into BN and the basic inference techniques on the latter may be used to obtain classical parameters computed from the former (i.e. probability distribution of top variable, minimal upper vectors and maximum lower vectors for any performance level, importance measures of components). Furthermore, some additional information can be obtained by using BN, both at the modeling and analysis level. At the modeling level, several restrictive assumptions implicit in the MFT methodology can be removed and various kinds of dependencies among components can be accommodated. At the analysis level, a general diagnostic analysis can be performed. The comparison of these methods is illustrated by an example of the water supply system. ? 2016 Beijing Institute of Aerospace Information.
基金the National Natural Science Foundation of China under Grant(51907166)the Science and Technology Project of CHINA RAILWAY under Grant(2017J001-F&N2018G023)the Sichuan Science and Technology Program under Grant(2018GZ0020).
文摘Conventional maintenance mode for the traction power supply system(TPSS)is to perform scheduled regular maintenance activities for power supply equipment,while such maintenance mode may result in undue maintenance tasks and low efficiency due to different degradation processes of different sorts of equipment.To address this problem,this paper introduces a preventive opportunistic maintenance(POM)method for TPSS based on equipment reliability.Firstly,a POM model is established by considering the equipment reliability degradation process based on Weibull distribution.Then,by considering the total power outage time in the planned operation cycle of TPSS as the optimization objective,the optimal maintenance scheme of TPSS is formulated by iterative method of maintenance strategies.The proposed method is verified by introducing practical maintenance strategies and fault record data of the traction transformer,circuit breaker and disconnector in an actual TPSS of a railway administration.Results show that the presented method can make full use of the existing fault data to develop a POM scheme for TPSS.It can improve maintenance efficiency and reduce power outage time,providing guidance to formulate scientific maintenance strategies for TPSS.
文摘针对现有目标检测模型在无依托供电场景存在检测效果不稳定、小目标大量漏检的问题,基于YOLOv4-tiny提出一种改进模型AMS-YOLOv4-tiny。通过在主干网之后引入更平滑的Mish函数、设计一种浅层特征加固的特征融合网络SCFPN、反复嵌入通道注意力机制3种策略,大幅提升预测特征层对目标的表达能力。实验结果表明,算法在PASCAL VOC07+12数据集上的mAP(mean of average precision)达到87.19%,相比YOLOv4-tiny提高4.45%,且部署在嵌入式设备上进行可行性验证,满足多种复杂场景下人车检测任务的精度与实时性要求。