In order to overcome the low precision and weak applicability problems of the current municipal water network state simulation model, the water network structure is studied. Since the telemetry system has been applied...In order to overcome the low precision and weak applicability problems of the current municipal water network state simulation model, the water network structure is studied. Since the telemetry system has been applied increasingly in the water network, and in order to reflect the network operational condition more accurately, a new water network macroscopic model is developed by taking the auto-control adjusting valve opening state into consideration. Then for highly correlated or collinear independent variables in the model, the partial least squares (PLS) regression method provides a model solution which can distinguish between the system information and the noisy data. Finally, a hypothetical water network is introduced for validating the model. The simulation results show that the relative error is less than 5.2%, indicating that the model is efficient and feasible, and has better generalization performance.展开更多
A systems approach is used to describe the generation and variation of wastewater in an urban area. This is a multivariable system and its combined response at the outlet of this system, which is usually the entrance ...A systems approach is used to describe the generation and variation of wastewater in an urban area. This is a multivariable system and its combined response at the outlet of this system, which is usually the entrance ofa wastewater treatment plant, depends on a number of environmental (precipitation and temperature) as well as social (size of the urban area, population changes, water consumption per capita) variables. There is a large number of available models and tools for describing the urban water system, however, the interactions between the individual components are rarely considered within the same modelling framework. In this paper a parsimonious methodology is proposed in order to understand and estimate the wastewater generation and its characteristics in an urban area using any information provided by the available data. The model incorporates both the flows of stormwater discharge and wastewater production that arrive to the wastewater treatment plant. A state dependent variable is introduced to simulate the consumptive uses in the urban area. Data availability and system's complexity affect the ability to achieve enhanced model performance, however, in the presented case study, preliminary results from the application of the presented model in the Greater Athens Area illustrate the potential of the conceptual modelling approach.展开更多
基金Supported by Tianjin Natural Science Foundation( No. 003611611).
文摘In order to overcome the low precision and weak applicability problems of the current municipal water network state simulation model, the water network structure is studied. Since the telemetry system has been applied increasingly in the water network, and in order to reflect the network operational condition more accurately, a new water network macroscopic model is developed by taking the auto-control adjusting valve opening state into consideration. Then for highly correlated or collinear independent variables in the model, the partial least squares (PLS) regression method provides a model solution which can distinguish between the system information and the noisy data. Finally, a hypothetical water network is introduced for validating the model. The simulation results show that the relative error is less than 5.2%, indicating that the model is efficient and feasible, and has better generalization performance.
文摘A systems approach is used to describe the generation and variation of wastewater in an urban area. This is a multivariable system and its combined response at the outlet of this system, which is usually the entrance ofa wastewater treatment plant, depends on a number of environmental (precipitation and temperature) as well as social (size of the urban area, population changes, water consumption per capita) variables. There is a large number of available models and tools for describing the urban water system, however, the interactions between the individual components are rarely considered within the same modelling framework. In this paper a parsimonious methodology is proposed in order to understand and estimate the wastewater generation and its characteristics in an urban area using any information provided by the available data. The model incorporates both the flows of stormwater discharge and wastewater production that arrive to the wastewater treatment plant. A state dependent variable is introduced to simulate the consumptive uses in the urban area. Data availability and system's complexity affect the ability to achieve enhanced model performance, however, in the presented case study, preliminary results from the application of the presented model in the Greater Athens Area illustrate the potential of the conceptual modelling approach.