In this study,we introduce a novel multi-objective optimization model tailored for modern manufacturing,aiming to mitigate the cost impacts of operational disruptions through optimized corrective maintenance.Central t...In this study,we introduce a novel multi-objective optimization model tailored for modern manufacturing,aiming to mitigate the cost impacts of operational disruptions through optimized corrective maintenance.Central to our approach is the strategic placement of maintenance stations and the efficient allocation of personnel,addressing a crucial gap in the integration of maintenance personnel dispatching and station selection.Our model uniquely combines the spatial distribution of machinery with the expertise of operators to achieve a harmonious balance between maintenance efficiency and cost-effectiveness.The core of our methodology is the NSGA Ⅲ+Dispatch,an advanced adaptation of the Non-Dominated Sorting Genetic Algorithm Ⅲ(NSGA-Ⅲ),meticulously designed for the selection of maintenance stations and effective operator dispatching.This method integrates a comprehensive coding process,crossover operator,and mutation operator to efficiently manage multiple objectives.Rigorous empirical testing,including a detailed analysis from a taiwan region electronic equipment manufacturer,validated the effectiveness of our approach across various scenarios of machine failure frequencies and operator configurations.The findings reveal that the proposed model significantly outperforms current practices by reducing response times by up to 23%in low-frequency and 28.23%in high-frequency machine failure scenarios,leading to notable improvements in efficiency and cost reduction.Additionally,it demonstrates significant improvements in oper-ational efficiency,particularly in selective high-frequency failure contexts,while ensuring substantial manpower cost savings without compromising on operational effectiveness.This research significantly advances maintenance strategies in production environments,providing the manufacturing industry with practical,optimized solutions for diverse machine malfunction situations.Furthermore,the methodologies and principles developed in this study have potential applications in various other sectors,including healthcare,transportation,and energy,where maintenance efficiency and resource optimization are equally critical.展开更多
In the process of designing a municipal rainwater and sewage pumping station,it is necessary to accurately grasp the design points,reasonably determine the scale of the rainwater and sewage pumping station,scientifica...In the process of designing a municipal rainwater and sewage pumping station,it is necessary to accurately grasp the design points,reasonably determine the scale of the rainwater and sewage pumping station,scientifically select the location and layout,and select materials reasonably.After completing the process design of the municipal rainwater and sewage pumping station and putting it into operation,in order to ensure the normal and stable operation of the pumping station,it is necessary to focus on strengthening the operation and management of diving equipment,cleaning equipment,and electromechanical equipment.The author analyzes the key points and specific design path of the process design of municipal rainwater and sewage pumping stations,and puts forward effective strategies for operation management,hoping to contribute to the scientific design and stable operation of municipal rainwater and sewage pumping stations.展开更多
Through investigation and analysis on typical system of pumped-storage stations built in China, this paper approaches the investment andfinancing policies, electricity pricing policies and management modes for suchsta...Through investigation and analysis on typical system of pumped-storage stations built in China, this paper approaches the investment andfinancing policies, electricity pricing policies and management modes for suchstations. In order to find out the actual operation situations, eight pumped-storage stations in five provinces (municipality) were investigated, and analysesand calculations were carried out on their investments, benefits, capabilities ofloan-repaying etc. During the investigation and study, the types and the installedcapacities of the stations were paid close attention to, so they were made morerepresentative to reflect the present situation of pumped-storage stations inrespect of construction and operation.展开更多
In China,operational in-situ marine monitoring is the primary means of directly obtaining hydrological,meteorological,and oceanographic environmental parameters across sea areas,and it is essential for applications su...In China,operational in-situ marine monitoring is the primary means of directly obtaining hydrological,meteorological,and oceanographic environmental parameters across sea areas,and it is essential for applications such as forecast of marine environment,prevention and mitigation of disaster,exploitation of marine resources,marine environmental protection,and management of transportation safety.In this paper,we summarise the composition,development courses,and present operational status of three systems of operational in-situ marine monitoring,namely coastal marine automated network station,ocean data buoy and voluntary observing ship measuring and reporting system.Additionally,we discuss the technical development in these in-situ systems and achievements in the key generic technologies along with future development trends.展开更多
Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjus...Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge.展开更多
The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode...The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.展开更多
[Objective] The aim was to study the development and application of operation in comprehensive platform of professional meteorological station.[Method] Taking the operation platform of professional meteorological stat...[Objective] The aim was to study the development and application of operation in comprehensive platform of professional meteorological station.[Method] Taking the operation platform of professional meteorological station in Yantai City as an example,and by dint of VB language and Mysql database technology,the ideas of comprehensive platform development of operation in professional meteorological station,main contents of the platform and its main functions were introduced.[Result] The platform mainly used VB language and Mysql database technology.Gathering together the forecast making,forecast inventory and check,surveillance of data uploading and machine operation and records of shifts,the interface was simple,visual and easy to handle.It reduced reporters’ workload,improved their work efficiency and was the favorite of majority reporters.[Conclusion] The study provided reference for the improvement of work efficiency of each professional meteorological station.展开更多
The networking of microgrids has received significant attention in the form of a smart grid.In this paper,a set of smart railway stations,which is assumed as microgrids,is connected together.It has been tried to manag...The networking of microgrids has received significant attention in the form of a smart grid.In this paper,a set of smart railway stations,which is assumed as microgrids,is connected together.It has been tried to manage the energy exchanged between the networked microgrids to reduce received energy from the utility grid.Also,the operational costs of stations under various conditions decrease by applying the proposed method.The smart railway stations are studied in the presence of photovoltaic(PV)units,energy storage systems(ESSs),and regenerative braking strategies.Studying regenerative braking is one of the essential contributions.Moreover,the stochastic behaviors of the ESS’s initial state of energy and the uncertainty of PV power generation are taken into account through a scenario-based method.The networked microgrid scheme of railway stations(based on coordinated operation and scheduling)and independent operation of railway stations are studied.The proposed method is applied to realistic case studies,including three stations of Line 3 of Tehran Urban and Suburban Railway Operation Company(TUSROC).The rolling stock is simulated in the MATLAB environment.Thus,the coordinated operation of networked microgrids and independent operation of railway stations are optimized in the GAMS environment utilizing mixed-integer linear programming(MILP).展开更多
On March 31, in accordance with the typical design requirements of the State Grid, the f irst large electric vehicle (EV) charging station, built by the North China Grid,
An operation strategy of the electric vehicle (EV) battery charging and swapping station is proposed in the paper. The strategy is established based on comprehensively consideration of the EV charging behaviors and ...An operation strategy of the electric vehicle (EV) battery charging and swapping station is proposed in the paper. The strategy is established based on comprehensively consideration of the EV charging behaviors and the possible mutual actions between battery charging and swapping. Three energy management strategies can be used in the station: charging period shifting, energy exchange between EVs, and energy supporting from surplus swapping batteries. Then an optimization model which minimizes the total energy management costs of the station is built. The Monte Carlo simulation is applied to analyze the characteristics of the EV battery charging load, and a heuristic algorithm is used to solve the strategy providing the relevant information of EVs and the battery charging and swapping station. The operation strategy can efficiently reduce battery charging during the high electricity price periods and make more reasonable use of the resources. Simulations prove the feasibility and rationality of the strategy.展开更多
In the paper,an operational program of electric bus charging station is proposed,which is special for "The Construction Project for Expo 2010 Temporary Electric Bus Charging Station".Based on the quick-chang...In the paper,an operational program of electric bus charging station is proposed,which is special for "The Construction Project for Expo 2010 Temporary Electric Bus Charging Station".Based on the quick-change mode,a vehicle operating schedule model has been established to meet the capacity of transport.Then,according to the quantity of passengers and utilization of batteries,a calculative method of parameters,such as the number of spare batteries and bus departure rules,has been provided.Furthermore,optimal simulation software designed for operating process of the charging station has been identified incorporating actual running data from electric buses and monitoring system of the charging station,and the rationality of the design is verified in the preliminary commissioning and the official operation.展开更多
The paper outlines the Yangtze Three Gorges water conservancy complex. It describes the power transmission and distribution equipment in the Three Gorges LeftBank Hydropower Station, especially large high-voltage dist...The paper outlines the Yangtze Three Gorges water conservancy complex. It describes the power transmission and distribution equipment in the Three Gorges LeftBank Hydropower Station, especially large high-voltage distribution devices. It elaborates the measures for suppressing GIS over-voltage and the tests on VFTO, besides technical measures to ensure safety and stability of power system in the station. It also makes some analyses and summaries about the problems encountered in operation of the equipment.展开更多
Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade ope...Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade operation, and proposes a monthly operation function algorithm for the actual operation of cascade hydropower stations through the identification, processing, and screening of available information during long-term optimal operation. Applying the operation function to the cascade hydropower stations on the Jinshajiang-Yangtze River system, the modeled long-term electric generation is shown to have high precision and provide benefits. Through comparison with optimal operation, the simulation results show that the operation function proposed retains the characteristics of optimal operation. Also, the inadequacies and attribution of the algorithm are discussed based on case study, providing decision support and reference information for research on large-scale cascade operation work.展开更多
Real-time kinematic GPS precise positioning has been playing an increasing role in both surveying and navigation. Based on the city’s fibre LAN network, Shenzhen Continuous Operating Reference Stations (SZCORS) syste...Real-time kinematic GPS precise positioning has been playing an increasing role in both surveying and navigation. Based on the city’s fibre LAN network, Shenzhen Continuous Operating Reference Stations (SZCORS) system has been established and consists of GPS reference stations, system control center, user’s data center, and real-time datacom network. The SZCORS system provides users the real-time centimeter positioning or post-processing millimeter positioning. This paper makes discussion on the structure of SZCORS system. Some experiments have been made to test the usablity, and then the data has been analyzed.展开更多
Traditional optimal operation of hydropower station usually has two problems. One is that the optimal algorithm hasn’t high efficiency, and the other is that the optimal operation model pays little attention to ecolo...Traditional optimal operation of hydropower station usually has two problems. One is that the optimal algorithm hasn’t high efficiency, and the other is that the optimal operation model pays little attention to ecology. And with the development of electric power market, the generated benefit is concerned instead of generated energy. Based on the analysis of time-varying electricity price policy, an optimal operation model of hydropower station reservoir with ecology consideration is established. The model takes the maximum annual power generation benefit, the maximum output of the minimal output stage in the year and the minimum shortage of eco-environment demand as the objectives, and reservoir water quantity balance, reservoir storage capacity, reservoir discharge flow and hydropower station output and nonnegative variable as the constraints. To solve the optimal model, a chaotic optimization genetic algorithm which combines the ergodicity of chaos and the inversion property of genetic algorithm is exploited. An example is given, which shows that the proposed model and algorithm are scientific and feasible to deal with the optimal operation of hydropower station.展开更多
During the COVID-19 outbreak,the use of single-use medical supplies increased significantly.It is essential to select suitable sites for establishing medical waste treatment stations.It is a big challenge to solve the...During the COVID-19 outbreak,the use of single-use medical supplies increased significantly.It is essential to select suitable sites for establishing medical waste treatment stations.It is a big challenge to solve the medical waste treatment station selection problem due to some conflicting factors.This paper proposes a multi-attribute decision-making(MADM)method based on the partitioned Maclaurin symmetric mean(PMSM)operator.For the medical waste treatment station selection problem,the factors or attributes(these two terms can be interchanged.)in the same clusters are closely related,and the attributes in different clusters have no relationships.The partitioned Maclaurin symmetric mean function(PMSMF)can handle these complex attribute relationships.Hence,we extend the PMSM operator to process the linguistic q-rung orthopair fuzzy numbers(Lq-ROFNs)and propose the linguistic q-rung orthopair fuzzy partitioned Maclaurin symmetric mean(Lq-ROFPMSM)operator and its weighted form(Lq-ROFWPMSM).To reduce the negative impact of unreasonable data on the final output results,we propose the linguistic q-rung orthopair fuzzy partitioned dual Maclaurin symmetric mean(Lq-ROFPDMSM)operator and its weighted form(Lq-ROFWPDMSM).We also discuss the characteristics and typical examples of the above operators.A novel MADM method uses the Lq-ROFWPMSM operator and the Lq-ROFWPDMSM operator to solve the medical waste treatment station selection problem.Finally,the usability and superiority of the proposed method are verified by comparing it with previous methods.展开更多
This paper is devoted to development and study of models for operator training systems of heating power station processes management. It proposed a mathematical model describing the management processes of heating pow...This paper is devoted to development and study of models for operator training systems of heating power station processes management. It proposed a mathematical model describing the management processes of heating power units of the technological complex considering the relationship of technological variables in deviations effective in real time. A software complex is developed for the system of training of operators controlling processes in heating station units. Obtained results may be used in the course of development of computer training systems for operators of heating power stations with cross-linkage.展开更多
China is rich in hydropower resources,and mountain rivers have abundant water resources and huge development potential,which have a profound impact on the pattern of water resources allocation in China.As the main way...China is rich in hydropower resources,and mountain rivers have abundant water resources and huge development potential,which have a profound impact on the pattern of water resources allocation in China.As the main way of water resources and hydropower development,the construction of cascade hydropower stations,while meeting the requirements of water resources utilization for social development,has also brought adverse effects on river ecosystems.Therefore,the impact of the construction of cascade hydropower stations on mountainous river ecosystems,where the minimum ecological flow of rivers must be ensured and reviewed.In addition,this paper proposed the deficiencies and outlooks for cascade hydropower stations based on previous research results.展开更多
基金support from the National Science and Technology Council of Taiwan(Contract Nos.112-2221-E-011-115 and 111-2622-E-011019)the support from Intelligent Manufacturing Innovation Center(IMIC),National Taiwan University of Science and Technology(NTUST),Taipei 10607,Taiwan,which is a Featured Areas Research Center in Higher Education Sprout Project of Ministry of Education(MOE),Taiwan(since 2023)was appreciated.
文摘In this study,we introduce a novel multi-objective optimization model tailored for modern manufacturing,aiming to mitigate the cost impacts of operational disruptions through optimized corrective maintenance.Central to our approach is the strategic placement of maintenance stations and the efficient allocation of personnel,addressing a crucial gap in the integration of maintenance personnel dispatching and station selection.Our model uniquely combines the spatial distribution of machinery with the expertise of operators to achieve a harmonious balance between maintenance efficiency and cost-effectiveness.The core of our methodology is the NSGA Ⅲ+Dispatch,an advanced adaptation of the Non-Dominated Sorting Genetic Algorithm Ⅲ(NSGA-Ⅲ),meticulously designed for the selection of maintenance stations and effective operator dispatching.This method integrates a comprehensive coding process,crossover operator,and mutation operator to efficiently manage multiple objectives.Rigorous empirical testing,including a detailed analysis from a taiwan region electronic equipment manufacturer,validated the effectiveness of our approach across various scenarios of machine failure frequencies and operator configurations.The findings reveal that the proposed model significantly outperforms current practices by reducing response times by up to 23%in low-frequency and 28.23%in high-frequency machine failure scenarios,leading to notable improvements in efficiency and cost reduction.Additionally,it demonstrates significant improvements in oper-ational efficiency,particularly in selective high-frequency failure contexts,while ensuring substantial manpower cost savings without compromising on operational effectiveness.This research significantly advances maintenance strategies in production environments,providing the manufacturing industry with practical,optimized solutions for diverse machine malfunction situations.Furthermore,the methodologies and principles developed in this study have potential applications in various other sectors,including healthcare,transportation,and energy,where maintenance efficiency and resource optimization are equally critical.
文摘In the process of designing a municipal rainwater and sewage pumping station,it is necessary to accurately grasp the design points,reasonably determine the scale of the rainwater and sewage pumping station,scientifically select the location and layout,and select materials reasonably.After completing the process design of the municipal rainwater and sewage pumping station and putting it into operation,in order to ensure the normal and stable operation of the pumping station,it is necessary to focus on strengthening the operation and management of diving equipment,cleaning equipment,and electromechanical equipment.The author analyzes the key points and specific design path of the process design of municipal rainwater and sewage pumping stations,and puts forward effective strategies for operation management,hoping to contribute to the scientific design and stable operation of municipal rainwater and sewage pumping stations.
文摘Through investigation and analysis on typical system of pumped-storage stations built in China, this paper approaches the investment andfinancing policies, electricity pricing policies and management modes for suchstations. In order to find out the actual operation situations, eight pumped-storage stations in five provinces (municipality) were investigated, and analysesand calculations were carried out on their investments, benefits, capabilities ofloan-repaying etc. During the investigation and study, the types and the installedcapacities of the stations were paid close attention to, so they were made morerepresentative to reflect the present situation of pumped-storage stations inrespect of construction and operation.
基金The National Key Research and Development Program of China under contract No.2022YFC3104200the Key R&D Program of Shandong Province,China under contract No.2023ZLYS01+3 种基金the Consulting and Research Project of the Chinese Academy of Engineering under contract Nos 2022-XY-21,2022-DFZD-35,2023-XBZD-09 and 2021-XBZD-13the Major Innovation Special Project of Qilu University of Technology(Shandong Academy of Sciences),Science Education Industry Integration Pilot Project under contract No.2023HYZX01Special Funds for“Mount Taishan Scholars”Construction Projectthe Special Funds of Laoshan Laboratory.
文摘In China,operational in-situ marine monitoring is the primary means of directly obtaining hydrological,meteorological,and oceanographic environmental parameters across sea areas,and it is essential for applications such as forecast of marine environment,prevention and mitigation of disaster,exploitation of marine resources,marine environmental protection,and management of transportation safety.In this paper,we summarise the composition,development courses,and present operational status of three systems of operational in-situ marine monitoring,namely coastal marine automated network station,ocean data buoy and voluntary observing ship measuring and reporting system.Additionally,we discuss the technical development in these in-situ systems and achievements in the key generic technologies along with future development trends.
基金supported by Author Special Foundation of National Excellent Doctoral Dissertation of China (Grant No. 2007B41)Jiangsu Provincial Foundation of "333 Talents Engineering" of ChinaJiangsu Provincial Academic Header Foundation of Qinglan Engineering of China
文摘Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge.
基金funded by the Project “Resource Characteristics of Main Watersheds and Key Issues in Development and Utilization of Hydroelectricity in South America and Africa”the National Science Foundation of China (U1766201)
文摘The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.
文摘[Objective] The aim was to study the development and application of operation in comprehensive platform of professional meteorological station.[Method] Taking the operation platform of professional meteorological station in Yantai City as an example,and by dint of VB language and Mysql database technology,the ideas of comprehensive platform development of operation in professional meteorological station,main contents of the platform and its main functions were introduced.[Result] The platform mainly used VB language and Mysql database technology.Gathering together the forecast making,forecast inventory and check,surveillance of data uploading and machine operation and records of shifts,the interface was simple,visual and easy to handle.It reduced reporters’ workload,improved their work efficiency and was the favorite of majority reporters.[Conclusion] The study provided reference for the improvement of work efficiency of each professional meteorological station.
文摘The networking of microgrids has received significant attention in the form of a smart grid.In this paper,a set of smart railway stations,which is assumed as microgrids,is connected together.It has been tried to manage the energy exchanged between the networked microgrids to reduce received energy from the utility grid.Also,the operational costs of stations under various conditions decrease by applying the proposed method.The smart railway stations are studied in the presence of photovoltaic(PV)units,energy storage systems(ESSs),and regenerative braking strategies.Studying regenerative braking is one of the essential contributions.Moreover,the stochastic behaviors of the ESS’s initial state of energy and the uncertainty of PV power generation are taken into account through a scenario-based method.The networked microgrid scheme of railway stations(based on coordinated operation and scheduling)and independent operation of railway stations are studied.The proposed method is applied to realistic case studies,including three stations of Line 3 of Tehran Urban and Suburban Railway Operation Company(TUSROC).The rolling stock is simulated in the MATLAB environment.Thus,the coordinated operation of networked microgrids and independent operation of railway stations are optimized in the GAMS environment utilizing mixed-integer linear programming(MILP).
文摘On March 31, in accordance with the typical design requirements of the State Grid, the f irst large electric vehicle (EV) charging station, built by the North China Grid,
基金supported by the National Natural Science Foundation of China under Grant No.51007047
文摘An operation strategy of the electric vehicle (EV) battery charging and swapping station is proposed in the paper. The strategy is established based on comprehensively consideration of the EV charging behaviors and the possible mutual actions between battery charging and swapping. Three energy management strategies can be used in the station: charging period shifting, energy exchange between EVs, and energy supporting from surplus swapping batteries. Then an optimization model which minimizes the total energy management costs of the station is built. The Monte Carlo simulation is applied to analyze the characteristics of the EV battery charging load, and a heuristic algorithm is used to solve the strategy providing the relevant information of EVs and the battery charging and swapping station. The operation strategy can efficiently reduce battery charging during the high electricity price periods and make more reasonable use of the resources. Simulations prove the feasibility and rationality of the strategy.
基金Supported by the National High Technology Research and Development Programme of China(No.2011AA05A108)the National NaturalScience Foundation of China(No.71041025)
文摘In the paper,an operational program of electric bus charging station is proposed,which is special for "The Construction Project for Expo 2010 Temporary Electric Bus Charging Station".Based on the quick-change mode,a vehicle operating schedule model has been established to meet the capacity of transport.Then,according to the quantity of passengers and utilization of batteries,a calculative method of parameters,such as the number of spare batteries and bus departure rules,has been provided.Furthermore,optimal simulation software designed for operating process of the charging station has been identified incorporating actual running data from electric buses and monitoring system of the charging station,and the rationality of the design is verified in the preliminary commissioning and the official operation.
文摘The paper outlines the Yangtze Three Gorges water conservancy complex. It describes the power transmission and distribution equipment in the Three Gorges LeftBank Hydropower Station, especially large high-voltage distribution devices. It elaborates the measures for suppressing GIS over-voltage and the tests on VFTO, besides technical measures to ensure safety and stability of power system in the station. It also makes some analyses and summaries about the problems encountered in operation of the equipment.
基金supported by the National Natural Science Foundation of China (Grant No. 40971300)the Fundamental Research Funds for the Central Universities (Grant No.10QX43)
文摘Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade operation, and proposes a monthly operation function algorithm for the actual operation of cascade hydropower stations through the identification, processing, and screening of available information during long-term optimal operation. Applying the operation function to the cascade hydropower stations on the Jinshajiang-Yangtze River system, the modeled long-term electric generation is shown to have high precision and provide benefits. Through comparison with optimal operation, the simulation results show that the operation function proposed retains the characteristics of optimal operation. Also, the inadequacies and attribution of the algorithm are discussed based on case study, providing decision support and reference information for research on large-scale cascade operation work.
文摘Real-time kinematic GPS precise positioning has been playing an increasing role in both surveying and navigation. Based on the city’s fibre LAN network, Shenzhen Continuous Operating Reference Stations (SZCORS) system has been established and consists of GPS reference stations, system control center, user’s data center, and real-time datacom network. The SZCORS system provides users the real-time centimeter positioning or post-processing millimeter positioning. This paper makes discussion on the structure of SZCORS system. Some experiments have been made to test the usablity, and then the data has been analyzed.
文摘Traditional optimal operation of hydropower station usually has two problems. One is that the optimal algorithm hasn’t high efficiency, and the other is that the optimal operation model pays little attention to ecology. And with the development of electric power market, the generated benefit is concerned instead of generated energy. Based on the analysis of time-varying electricity price policy, an optimal operation model of hydropower station reservoir with ecology consideration is established. The model takes the maximum annual power generation benefit, the maximum output of the minimal output stage in the year and the minimum shortage of eco-environment demand as the objectives, and reservoir water quantity balance, reservoir storage capacity, reservoir discharge flow and hydropower station output and nonnegative variable as the constraints. To solve the optimal model, a chaotic optimization genetic algorithm which combines the ergodicity of chaos and the inversion property of genetic algorithm is exploited. An example is given, which shows that the proposed model and algorithm are scientific and feasible to deal with the optimal operation of hydropower station.
基金This research work was supported by the National Natural Science Foundation of China under Grant No.U1805263.
文摘During the COVID-19 outbreak,the use of single-use medical supplies increased significantly.It is essential to select suitable sites for establishing medical waste treatment stations.It is a big challenge to solve the medical waste treatment station selection problem due to some conflicting factors.This paper proposes a multi-attribute decision-making(MADM)method based on the partitioned Maclaurin symmetric mean(PMSM)operator.For the medical waste treatment station selection problem,the factors or attributes(these two terms can be interchanged.)in the same clusters are closely related,and the attributes in different clusters have no relationships.The partitioned Maclaurin symmetric mean function(PMSMF)can handle these complex attribute relationships.Hence,we extend the PMSM operator to process the linguistic q-rung orthopair fuzzy numbers(Lq-ROFNs)and propose the linguistic q-rung orthopair fuzzy partitioned Maclaurin symmetric mean(Lq-ROFPMSM)operator and its weighted form(Lq-ROFWPMSM).To reduce the negative impact of unreasonable data on the final output results,we propose the linguistic q-rung orthopair fuzzy partitioned dual Maclaurin symmetric mean(Lq-ROFPDMSM)operator and its weighted form(Lq-ROFWPDMSM).We also discuss the characteristics and typical examples of the above operators.A novel MADM method uses the Lq-ROFWPMSM operator and the Lq-ROFWPDMSM operator to solve the medical waste treatment station selection problem.Finally,the usability and superiority of the proposed method are verified by comparing it with previous methods.
文摘This paper is devoted to development and study of models for operator training systems of heating power station processes management. It proposed a mathematical model describing the management processes of heating power units of the technological complex considering the relationship of technological variables in deviations effective in real time. A software complex is developed for the system of training of operators controlling processes in heating station units. Obtained results may be used in the course of development of computer training systems for operators of heating power stations with cross-linkage.
基金This research was funded by Guangxi key R&D program(Guike AB19259015)and Guangxi key R&D program(Guike AB20297017)Guangxi Key Laboratory of Water Engineering Materials and Structures fund program(GXHRI-WZMS-2020-07).
文摘China is rich in hydropower resources,and mountain rivers have abundant water resources and huge development potential,which have a profound impact on the pattern of water resources allocation in China.As the main way of water resources and hydropower development,the construction of cascade hydropower stations,while meeting the requirements of water resources utilization for social development,has also brought adverse effects on river ecosystems.Therefore,the impact of the construction of cascade hydropower stations on mountainous river ecosystems,where the minimum ecological flow of rivers must be ensured and reviewed.In addition,this paper proposed the deficiencies and outlooks for cascade hydropower stations based on previous research results.