The Nesterov accelerated dynamical approach serves as an essential tool for addressing convex optimization problems with accelerated convergence rates.Most previous studies in this field have primarily concentrated on...The Nesterov accelerated dynamical approach serves as an essential tool for addressing convex optimization problems with accelerated convergence rates.Most previous studies in this field have primarily concentrated on unconstrained smooth con-vex optimization problems.In this paper,on the basis of primal-dual dynamical approach,Nesterov accelerated dynamical approach,projection operator and directional gradient,we present two accelerated primal-dual projection neurodynamic approaches with time scaling to address convex optimization problems with smooth and nonsmooth objective functions subject to linear and set constraints,which consist of a second-order ODE(ordinary differential equation)or differential conclusion system for the primal variables and a first-order ODE for the dual vari-ables.By satisfying specific conditions for time scaling,we demonstrate that the proposed approaches have a faster conver-gence rate.This only requires assuming convexity of the objective function.We validate the effectiveness of our proposed two accel-erated primal-dual projection neurodynamic approaches through numerical experiments.展开更多
In this paper we study the perturbation bound of the projection ( W A ) ( W A )+,where both the matrices A and W are given with W positive diagonal and severely stiff.When the perturbed matrix (A)= A + δA satisfy sev...In this paper we study the perturbation bound of the projection ( W A ) ( W A )+,where both the matrices A and W are given with W positive diagonal and severely stiff.When the perturbed matrix (A)= A + δA satisfy several row rank preserving conditions,we derive a new perturbation bound of the projection.展开更多
Safety risks are essential to the success or failure of the large⁃scale complex projects.In order to assess and evaluate the safety risks of the large⁃scale complex projects scientifically,a risk assessment method of ...Safety risks are essential to the success or failure of the large⁃scale complex projects.In order to assess and evaluate the safety risks of the large⁃scale complex projects scientifically,a risk assessment method of work breakdown structure and risk breakdown structure(WBS⁃RBS)is proposed to identify the project risks.In this paper,interval numbers are used to evaluate the risk levels,weights are assigned automatically based on the complexity and risk degree of WBS to distinguish three types of nodes in WBS,and a risk assessment algorithm is designed to assess safety risk at all layers of the project.A case study is conducted to demonstrate how to apply the method.The results show the practicality,robustness and efficiency of our new method,which can be applied to different kinds of large⁃scale complex projects in reality.展开更多
By applying man-machine-environment system engineering theory, safety risks on large scale field operation project have been evaluated in this article. The factors concerning with the man, machine and environment in s...By applying man-machine-environment system engineering theory, safety risks on large scale field operation project have been evaluated in this article. The factors concerning with the man, machine and environment in system were proposed separately. The value for lowest indexs was determined by decision-making of expert group. The weights were calculated based on AHP, and then safety risk assessment in different layers was made. The results show that the assessment method is reasonable, and it is significant for large scale field operation project safety managerment.展开更多
The key aspect to the successful implementation of BOT concept is the raising of finance by project sponsor,so financial engineering techniques and capital structuring skills are required to find the proper mix of deb...The key aspect to the successful implementation of BOT concept is the raising of finance by project sponsor,so financial engineering techniques and capital structuring skills are required to find the proper mix of debt and equity.The capital structure and present a model to determine the equity level from the aspects of financing scale,construction time and return on investment are analyzed.The resulting model can help the sponsor to avoid the capital risk,and offer the government a criterion to evaluate management ability of the sponsor.To show the application and availability of this model,a case study is conducted.Thus,this paper is concern with the determination of financing scale,construction time,and return on investment which would assist the sponsor to ensure that the equity level for optimal capital structure is available prior to the implementation stage in BOT project operation.展开更多
A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial n...A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.展开更多
基金supported by the National Natural Science Foundation of China(62176218,62176027)the Fundamental Research Funds for the Central Universities(XDJK2020TY003)the Funds for Chongqing Talent Plan(cstc2024ycjh-bgzxm0082)。
文摘The Nesterov accelerated dynamical approach serves as an essential tool for addressing convex optimization problems with accelerated convergence rates.Most previous studies in this field have primarily concentrated on unconstrained smooth con-vex optimization problems.In this paper,on the basis of primal-dual dynamical approach,Nesterov accelerated dynamical approach,projection operator and directional gradient,we present two accelerated primal-dual projection neurodynamic approaches with time scaling to address convex optimization problems with smooth and nonsmooth objective functions subject to linear and set constraints,which consist of a second-order ODE(ordinary differential equation)or differential conclusion system for the primal variables and a first-order ODE for the dual vari-ables.By satisfying specific conditions for time scaling,we demonstrate that the proposed approaches have a faster conver-gence rate.This only requires assuming convexity of the objective function.We validate the effectiveness of our proposed two accel-erated primal-dual projection neurodynamic approaches through numerical experiments.
文摘In this paper we study the perturbation bound of the projection ( W A ) ( W A )+,where both the matrices A and W are given with W positive diagonal and severely stiff.When the perturbed matrix (A)= A + δA satisfy several row rank preserving conditions,we derive a new perturbation bound of the projection.
基金This paper was supported by National Social Science Foundation of China(2019⁃SKJJ⁃035)。
文摘Safety risks are essential to the success or failure of the large⁃scale complex projects.In order to assess and evaluate the safety risks of the large⁃scale complex projects scientifically,a risk assessment method of work breakdown structure and risk breakdown structure(WBS⁃RBS)is proposed to identify the project risks.In this paper,interval numbers are used to evaluate the risk levels,weights are assigned automatically based on the complexity and risk degree of WBS to distinguish three types of nodes in WBS,and a risk assessment algorithm is designed to assess safety risk at all layers of the project.A case study is conducted to demonstrate how to apply the method.The results show the practicality,robustness and efficiency of our new method,which can be applied to different kinds of large⁃scale complex projects in reality.
基金supported by the National Natural Science Foundation of China(71172124,71201124)Projects of the National Social Science Foundation of China(15GJ003-245)Science Foundation for The Youth Scholars of Xi'an Institute of High Technology and Science(2015QNJJ011)
文摘By applying man-machine-environment system engineering theory, safety risks on large scale field operation project have been evaluated in this article. The factors concerning with the man, machine and environment in system were proposed separately. The value for lowest indexs was determined by decision-making of expert group. The weights were calculated based on AHP, and then safety risk assessment in different layers was made. The results show that the assessment method is reasonable, and it is significant for large scale field operation project safety managerment.
文摘The key aspect to the successful implementation of BOT concept is the raising of finance by project sponsor,so financial engineering techniques and capital structuring skills are required to find the proper mix of debt and equity.The capital structure and present a model to determine the equity level from the aspects of financing scale,construction time and return on investment are analyzed.The resulting model can help the sponsor to avoid the capital risk,and offer the government a criterion to evaluate management ability of the sponsor.To show the application and availability of this model,a case study is conducted.Thus,this paper is concern with the determination of financing scale,construction time,and return on investment which would assist the sponsor to ensure that the equity level for optimal capital structure is available prior to the implementation stage in BOT project operation.
基金Supported bythe National 973 Programof China(No.2003CB716705) International Cooperative Fund of European Union(No.EVGI-CT-2002-00061) .
文摘A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.