期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Speed up the Retrofit of Thermal Power Generating Units, Raise the Effectiveness of Power Plant Comprehensively
1
作者 Jiang Zhesheng 《Electricity》 2000年第1期13-16,共4页
关键词 Speed up the Retrofit of thermal Power Generating Units Raise the Effectiveness of Power Plant Comprehensively
下载PDF
The import contract on the generating equipment of Hanfeng Thermal Power Plant signed in Beijing
2
《Electricity》 1996年第4期50-50,共1页
On November 8, 1996. the import contract signing ceremony on the two 660 MW coal-fired generating units of Hanfeng Thermal Power Plant 1st phase was held in the Great Hall of People, Beijing.
关键词 The import contract on the generating equipment of Hanfeng thermal Power Plant signed in Beijing
下载PDF
The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
3
《Electricity》 2000年第3期45-45,共1页
关键词 The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan thermal Power Plant went into commercial operation
下载PDF
Research and Demonstration of Direct Air-Cooling System for 600-MW Fossil-Fired Power Plants
4
作者 Zhang Xiaolu 1 , Wang Jianping 2 , Hu Zhenling 3 1. China Power Investment Corporation 2. China Power Engineering Consulting Group Corporation 3. Harbin Air Conditioning Co., Ltd., 《Electricity》 2011年第4期46-51,共6页
Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant t... Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China. 展开更多
关键词 thermal power generating unit air-cooling direct air-cooling project demonstration
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部