期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
500 MW Unit Simulator for Panshan Thermal Power Plant Passed Acceptance
1
《Electricity》 1996年第4期36-36,共1页
After a thorough demonstration in Panshan Thermal Power Plant, the 500 MW super critical pressure unit simulator developed by the Simulation & Control Institute under the North China University of Electric Power w... After a thorough demonstration in Panshan Thermal Power Plant, the 500 MW super critical pressure unit simulator developed by the Simulation & Control Institute under the North China University of Electric Power was accepted by experts from the North China Electric Power Group Company on 3rd August 1996. 展开更多
关键词 MW Unit Simulator for Panshan thermal power plant Passed Acceptance IP
下载PDF
The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
2
《Electricity》 2000年第3期45-45,共1页
关键词 The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan thermal power plant went into commercial operation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部