A review is conducted about the application of the evaporative cooling technology in thermal power plants.Different case studies are considered,namely,evaporative air conditioners,evaporative cooling in direct air-coo...A review is conducted about the application of the evaporative cooling technology in thermal power plants.Different case studies are considered,namely,evaporative air conditioners,evaporative cooling in direct air-cooled systems,gas turbine inlet cooling,wet cooling towers,and hybrid cooling towers with a crosswind effect.Some effort is provided to describe the advantages related to direct evaporative cooling when it is applied in thermal power plants and illustrate the research gaps,which have not been filled yet.In particular,typical case studies are intentionally used to compare the cooling performances when direct evaporative cooling is implemented in different types of cooling towers,including the natural draft wet cooling tower(NDWCT)and the pre-cooled natural draft dry cooling tower(NDDCT).It is shown that the NDWCT provides the best cooling performance in terms of power station cooling,followed by the pre-cooled NDDCT,and the NDDCT;moreover,the evaporative pre-cooling is able to enhance the cooling performance of NDDCT.Besides,on a yearly basis,better NDDCT cooling performances can be obtained by means of a spray-based pre-cooling approach with respect to wet media pre-cooling.Therefore,the use of nozzle spray is suggested for improvement in the performance of indirect/direct air-cooling systems with controlled water consumption.展开更多
Through analyzing the proportion of SO2 emission from thermal power plants in the nationwide SO2 emis- sion in USA, Japan etc. developed countries, and the developmental course of thermal power installed capacity and ...Through analyzing the proportion of SO2 emission from thermal power plants in the nationwide SO2 emis- sion in USA, Japan etc. developed countries, and the developmental course of thermal power installed capacity and the FGD capacity in USA, the FGD capacity of thermal power plants in China is forecasted from two angles. One is to predict FGD capacity in accordance with the policy in force in China. The other is to predict FGD capacity based upon the emission right trading policy. As compared, it is held that FGD equipment should be mainly installed on the large size units burning high sulfur coal according to the emission right trading policy. Such a method of work not only can economize large amount of investments and operation costs, but also can realize the same environmental effect.展开更多
According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plan...According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At the end,it puts forward some suggestions and countermeasures with regard to laws,regulations,taxation policy and electricity pricing policy.展开更多
As coal is the most important primary energy in China, SO2 , the main pollutant of coal-fired power plantsseriously pollutes the environment in the course of energy utilization and conversion. Flue gas desulphurizatio...As coal is the most important primary energy in China, SO2 , the main pollutant of coal-fired power plantsseriously pollutes the environment in the course of energy utilization and conversion. Flue gas desulphurization is inevitable in China, however, it is rather difficult to reach the stipulated standards without any compulsory administrative measures of the government. What are the exact difficulties and solutions for the desulphurization in power plants?展开更多
基金supported by the Shandong Natural Science Foundation(Grant No.ZR2022ME008)the Shandong Provincial Science and Technology SMEs Innovation Capacity Improvement Project(2022TSGC2018)+3 种基金the Shenzhen Science and Technology Program(KCXFZ20201221173409026)The financial supports from the“Young Scholars Program of Shandong University”(YSPSDU,No.2018WLJH73)the Open Project of State Key Laboratory of Clean Energy Utilization,Zhejiang University(Program Number ZJUCEU2020011)the Shandong Natural Science Foundation(Grant No.ZR2021ME118)are gratefully acknowledged。
文摘A review is conducted about the application of the evaporative cooling technology in thermal power plants.Different case studies are considered,namely,evaporative air conditioners,evaporative cooling in direct air-cooled systems,gas turbine inlet cooling,wet cooling towers,and hybrid cooling towers with a crosswind effect.Some effort is provided to describe the advantages related to direct evaporative cooling when it is applied in thermal power plants and illustrate the research gaps,which have not been filled yet.In particular,typical case studies are intentionally used to compare the cooling performances when direct evaporative cooling is implemented in different types of cooling towers,including the natural draft wet cooling tower(NDWCT)and the pre-cooled natural draft dry cooling tower(NDDCT).It is shown that the NDWCT provides the best cooling performance in terms of power station cooling,followed by the pre-cooled NDDCT,and the NDDCT;moreover,the evaporative pre-cooling is able to enhance the cooling performance of NDDCT.Besides,on a yearly basis,better NDDCT cooling performances can be obtained by means of a spray-based pre-cooling approach with respect to wet media pre-cooling.Therefore,the use of nozzle spray is suggested for improvement in the performance of indirect/direct air-cooling systems with controlled water consumption.
文摘Through analyzing the proportion of SO2 emission from thermal power plants in the nationwide SO2 emis- sion in USA, Japan etc. developed countries, and the developmental course of thermal power installed capacity and the FGD capacity in USA, the FGD capacity of thermal power plants in China is forecasted from two angles. One is to predict FGD capacity in accordance with the policy in force in China. The other is to predict FGD capacity based upon the emission right trading policy. As compared, it is held that FGD equipment should be mainly installed on the large size units burning high sulfur coal according to the emission right trading policy. Such a method of work not only can economize large amount of investments and operation costs, but also can realize the same environmental effect.
文摘According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At the end,it puts forward some suggestions and countermeasures with regard to laws,regulations,taxation policy and electricity pricing policy.
文摘As coal is the most important primary energy in China, SO2 , the main pollutant of coal-fired power plantsseriously pollutes the environment in the course of energy utilization and conversion. Flue gas desulphurization is inevitable in China, however, it is rather difficult to reach the stipulated standards without any compulsory administrative measures of the government. What are the exact difficulties and solutions for the desulphurization in power plants?