期刊文献+
共找到164篇文章
< 1 2 9 >
每页显示 20 50 100
$80m credit pact to a Pakistan thermal power project signed
1
《Electricity》 1996年第3期39-39,共1页
Two agreements to provide guarantees and insurance for an $80-million export buyers’ credit to a Pakistani thermal power project were signed on August in Beijing. The agreements were reached between the People’s Ins... Two agreements to provide guarantees and insurance for an $80-million export buyers’ credit to a Pakistani thermal power project were signed on August in Beijing. The agreements were reached between the People’s Insurance (Property) Co Ltd (PICC Property), Bank of China and the Harbin Power Engineering Co Ltd. The UCH power project of Pakistan, which will cost $630 million and have a 586 MW capacity, is one of Pakistan’s first batch of non-governmental power projects. It will be built in Pakistan by the General Electric International Operations Co Inc of the United States and the Harbin Power Engineering Co Ltd. The US firm 展开更多
关键词 PICC BANK credit pact to a Pakistan thermal power project signed
下载PDF
The Project Cost Control of China Thermal Power Project
2
作者 Lei Xueqin(Techno-economic Department, CPECC) 《Electricity》 1999年第2期41-43,共3页
关键词 The project Cost Control of China thermal power project
下载PDF
FGD Franchising Pilot Project of Thermal Power Plants
3
作者 Wang Zhixuan,Pan Li and Zhang Jingyi China Electricity Council Wang Ying 《Electricity》 2009年第4期41-47,共7页
According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plan... According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At the end,it puts forward some suggestions and countermeasures with regard to laws,regulations,taxation policy and electricity pricing policy. 展开更多
关键词 FGD Franchising Pilot project of thermal power Plants project
下载PDF
The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
4
《Electricity》 2000年第3期45-45,共1页
关键词 The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan thermal power Plant went into commercial operation
下载PDF
江苏省电力市场下火电项目经济效益影响分析研究
5
作者 张延伍 史纯子 +1 位作者 黄其昱 吴梦成 《电力勘测设计》 2024年第6期66-70,76,共6页
在梳理江苏省电力市场现状的基础上,分析电力市场发展对火电项目经济效益的影响因素。为深入研究中长期市场收益、现货市场收益和辅助服务市场收益三部分收益对火电项目的影响,选取两台660MW机组火电项目作为算例,在给定项目成本参数的... 在梳理江苏省电力市场现状的基础上,分析电力市场发展对火电项目经济效益的影响因素。为深入研究中长期市场收益、现货市场收益和辅助服务市场收益三部分收益对火电项目的影响,选取两台660MW机组火电项目作为算例,在给定项目成本参数的基础上,运用实证分析方法评估中长期交易比例、电价、辅助服务以及煤耗等因素对项目收益的影响程度。分析结果表明,目前的现货市场收益占比不大,对项目收益的敏感性相对较低;现货价格的波动性表明各火电机组间的利润分配大小。在未来的电力市场发展中,火电企业需要密切关注市场变化,灵活调整经营策略,以实现稳定收益。 展开更多
关键词 火电项目 电力市场 经济性分析 中长期交易 电价
下载PDF
火电工程工程量清单招标中不平衡报价与对策分析
6
作者 马继烨 《建筑与装饰》 2024年第17期43-45,共3页
工程造价管理是火力发电厂建设中的重点内容,与工程施工成本息息相关,可以有效地节省项目开支。为进一步提升火电工程造价水平,必须牢牢抓住工程量清单计价模式,做好项目招标管理工作,减少不平衡报价手段所带来的财务风险和隐患问题。... 工程造价管理是火力发电厂建设中的重点内容,与工程施工成本息息相关,可以有效地节省项目开支。为进一步提升火电工程造价水平,必须牢牢抓住工程量清单计价模式,做好项目招标管理工作,减少不平衡报价手段所带来的财务风险和隐患问题。基于此,本文简要阐述了这种模式下不平衡报价类型,并对不平衡报价现象的形成原因加以深入分析,提出了科学可行的应对策略,旨在提升工程量清单招标中不平衡报价的管控效果,以期提供参考。 展开更多
关键词 火电工程 工程量清单 招标阶段 不平衡报价 应对策略
下载PDF
面向可持续发展的光热发电项目管理和运维
7
作者 李星 《能源与节能》 2024年第6期16-18,21,共4页
光热发电具有将太阳能高效转换为电能的能力,对于推动能源结构转型起到了关键作用。该技术为实现清洁、可持续的能源供应和环境保护提供了新的途径,但其发展和应用过程中也遇到了一系列挑战,包括技术优化、成本控制和提高环境适应性等... 光热发电具有将太阳能高效转换为电能的能力,对于推动能源结构转型起到了关键作用。该技术为实现清洁、可持续的能源供应和环境保护提供了新的途径,但其发展和应用过程中也遇到了一系列挑战,包括技术优化、成本控制和提高环境适应性等问题。深入探讨了光热发电项目在面对这些挑战时的管理和运维策略,突出了持续创新和策略调整对提高光热发电效率和经济性的重要性。 展开更多
关键词 光热发电 可持续发展 项目管理 运维策略 效率优化
下载PDF
火电厂工程建设EPC总承包项目管理措施思考
8
作者 张彬 《中国科技纵横》 2024年第1期114-116,共3页
现阶段,电力需求不断提升,火电站建设行业迅速发展。火电站规模较大,现有的火电厂工程建设一般通过EPC总承包的方式开展作业。该模式下,火电厂的建设作业一般承包给专业单位,使建设过程具备更强的专业性以及科学性,在保障建设质量的基... 现阶段,电力需求不断提升,火电站建设行业迅速发展。火电站规模较大,现有的火电厂工程建设一般通过EPC总承包的方式开展作业。该模式下,火电厂的建设作业一般承包给专业单位,使建设过程具备更强的专业性以及科学性,在保障建设质量的基础上加快作业效率,显著提升施工水平。然而,实际作业环节具有较强的技术性,而且流程较多,总承包模式的落实存在一些技术难点,一定程度上制约了总承包功能的发挥。基于此,对火电厂工程建设EPC总承包项目管理措施进行研究,以期保障总承包项目的顺利落实。 展开更多
关键词 火电厂 EPC总承包 项目管理
下载PDF
Research and Demonstration of Direct Air-Cooling System for 600-MW Fossil-Fired Power Plants
9
作者 Zhang Xiaolu 1 , Wang Jianping 2 , Hu Zhenling 3 1. China Power Investment Corporation 2. China Power Engineering Consulting Group Corporation 3. Harbin Air Conditioning Co., Ltd., 《Electricity》 2011年第4期46-51,共6页
Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant t... Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China. 展开更多
关键词 thermal power generating unit air-cooling direct air-cooling project demonstration
下载PDF
火力发电厂建设施工项目管理策略研究
10
作者 霍兵 张晓峰 《工程建设与设计》 2023年第14期234-236,共3页
介绍了火力发电厂建设施工项目管理的重要性,并从施工成本管理、进度管理和风险管理3个方面进行了研究,总结了火力发电厂施工成本管理中人工费用支出过高、材料采购不规范等现状,并提出了相应的管理策略,强调企业及项目承包方要加强施... 介绍了火力发电厂建设施工项目管理的重要性,并从施工成本管理、进度管理和风险管理3个方面进行了研究,总结了火力发电厂施工成本管理中人工费用支出过高、材料采购不规范等现状,并提出了相应的管理策略,强调企业及项目承包方要加强施工人工费用和材料费用的控制,完善项目进度计划管理制度,提高项目管理水平。 展开更多
关键词 火力发电厂 项目管理 策略
下载PDF
浅析EPC项目中甲方的设备管理职责
11
作者 蔡汝林 《科技创新与生产力》 2023年第10期75-77,共3页
针对目前火力发电工程项目建设已普遍采用的设计采购施工(EPC)工程总承包模式,本文主要分析了在EPC项目的各个阶段中甲方应承担的设备管理方面的职责,讨论了甲方实现对设备有效管理的方式,既不改变EPC模式的本质,又不失去对设备管理的... 针对目前火力发电工程项目建设已普遍采用的设计采购施工(EPC)工程总承包模式,本文主要分析了在EPC项目的各个阶段中甲方应承担的设备管理方面的职责,讨论了甲方实现对设备有效管理的方式,既不改变EPC模式的本质,又不失去对设备管理的主导权。 展开更多
关键词 火力发电工程 EPC 甲方 项目管理 设备管理
下载PDF
提高火力发电工程项目质量管理水平的策略研究
12
作者 张德磊 《自动化应用》 2023年第S01期148-150,共3页
火力发电工程项目质量管理水平的提升是确保工程项目按照规定的质量标准和要求进行设计、建设和运营的关键因素。高水平的质量管理能够有效降低工程项目的风险,提高项目的质量和可靠性,保障项目的顺利进行和最终优质成果的交付。本文总... 火力发电工程项目质量管理水平的提升是确保工程项目按照规定的质量标准和要求进行设计、建设和运营的关键因素。高水平的质量管理能够有效降低工程项目的风险,提高项目的质量和可靠性,保障项目的顺利进行和最终优质成果的交付。本文总结了提升火力发电工程项目质量管理水平的策略,并强调了其在实践中的积极效果。 展开更多
关键词 火力发电工程 项目质量管理 提升策略
下载PDF
基于农用地分等的基本农田补划案例分析 被引量:34
13
作者 王红梅 廖丽君 +3 位作者 杜国明 李宏 史春香 张春女 《农业工程学报》 EI CAS CSCD 北大核心 2008年第10期52-55,共4页
耕地特别是基本农田的占补平衡,直接关系着粮食安全,基本农田数量和质量的占补平衡意义重大。该文将农用地分等成果应用于基本农田补划,借助于GIS空间分析技术,研究补划过程中被占基本农田区位的确定与综合数量和质量的测算,同时提出了... 耕地特别是基本农田的占补平衡,直接关系着粮食安全,基本农田数量和质量的占补平衡意义重大。该文将农用地分等成果应用于基本农田补划,借助于GIS空间分析技术,研究补划过程中被占基本农田区位的确定与综合数量和质量的测算,同时提出了补划为基本农田的一般农田的选择依据,主要包括一般农田的质量等级、与交通沿线及城镇农村居民点距离以及保持补划后基本农田的集中连片程度等,在此基础上,利用GIS确定补划为基本农田的一般农田的区位和地块。 展开更多
关键词 农用地分等 土地利用 基本农田补划 国电哈尔滨平南热电厂项目
下载PDF
“西电东送”火电规划对北京空气质量的影响 被引量:16
14
作者 陈义珍 柴发合 +3 位作者 段宁 薛志钢 李今丹 刘思湄 《环境科学研究》 EI CAS CSCD 北大核心 2003年第6期46-52,共7页
采用ATMOS长距离传输模型,预测了"西电东送"北通道火电规划空气污染物排放对北京市空气质量的影响。预测结果表明:"十五"期间,电厂源对北京市SO2年均质量浓度的贡献将减少0 26μg m3,细颗粒物年均质量浓度将增加1 4... 采用ATMOS长距离传输模型,预测了"西电东送"北通道火电规划空气污染物排放对北京市空气质量的影响。预测结果表明:"十五"期间,电厂源对北京市SO2年均质量浓度的贡献将减少0 26μg m3,细颗粒物年均质量浓度将增加1 45μg m3;"十一五"期间,SO2年均质量浓度将增加0 47μg m3,细颗粒物年均质量浓度将增加0 94μg m3;细颗粒物的影响以次生粒子为主。 展开更多
关键词 西电东送 火电规划 模型 SO2和细颗粒物
下载PDF
火电工程建设项目水土保持植物措施初探 被引量:6
15
作者 孙顺蒂 余新晓 +2 位作者 姜德文 赵永军 冯兴平 《水土保持通报》 CSCD 北大核心 2007年第2期141-145,共5页
火电工程建设项目在生产建设期及运营期都会产生大量的水土流失。植物措施作为开发建设项目水土流失的主要防治措施之一,对项目区植被恢复,新增水土流失控制以及水土保持设施效益的发挥有重大意义。就火电工程建设项目的特点及影响火电... 火电工程建设项目在生产建设期及运营期都会产生大量的水土流失。植物措施作为开发建设项目水土流失的主要防治措施之一,对项目区植被恢复,新增水土流失控制以及水土保持设施效益的发挥有重大意义。就火电工程建设项目的特点及影响火电工程建设植物措施配置的几大因素作了简要分析,包括项目所在地自然特点、项目防治分区及植物的生态学特性等方面。分析了内蒙古上都发电有限责任公司三期(2×600MW机组)工程植物措施情况,以期为火电类开发建设项目科学合理配置植物措施,有效发挥植物措施保持水土、改善环境效能以及充分体现“生态优先,综合利用”原则和更好地绿化美化提供参考。 展开更多
关键词 水土保持 植物措施 火电项目
下载PDF
Delphi和AHP集成的火电建设工程模糊综合评价方法 被引量:35
16
作者 陈坚红 盛德仁 +1 位作者 李蔚 孟炜 《热能动力工程》 CAS CSCD 北大核心 2003年第3期304-307,共4页
根据系统工程的原理 ,通过专家论证法和德尔菲法构建火电建设工程的多层次综合评价指标体系 ;应用层次分析法 ,建立较为完善的火电建设工程综合评价模型和方法 ,确定火电建设工程综合评价的程序和方法。实际案例计算表明 ,应用多层次指... 根据系统工程的原理 ,通过专家论证法和德尔菲法构建火电建设工程的多层次综合评价指标体系 ;应用层次分析法 ,建立较为完善的火电建设工程综合评价模型和方法 ,确定火电建设工程综合评价的程序和方法。实际案例计算表明 ,应用多层次指标体系和多目标综合后评价方法 ,可以将影响火电建设工程诸多因素定量表达出来 ,从而确保工程项目后评价的客观性和准确性。本文在火电建设工程的多层次综合评价指标体系的建立。 展开更多
关键词 火电建设工程 德尔菲法 层次分析法 AHP 指标体系 模糊综合评价方法
下载PDF
基于快速投影LANDWEBER法的电容层析成像图像重建算法研究 被引量:29
17
作者 董向元 陈琪 +4 位作者 李惊涛 蔡斌 阎润生 王海刚 刘石 《中国电机工程学报》 EI CSCD 北大核心 2005年第14期89-92,共4页
提出一种新的基于快速投影Landweber法的ECT图像重建算法。算法采用两部分迭代,初期采用预置矩阵加速迭代,该矩阵通过优化步长广义逆预迭代得到;后期采用常规投影Landweber法稳定迭代。探讨了ECT应用该算法的收敛条件,该算法易满足收敛... 提出一种新的基于快速投影Landweber法的ECT图像重建算法。算法采用两部分迭代,初期采用预置矩阵加速迭代,该矩阵通过优化步长广义逆预迭代得到;后期采用常规投影Landweber法稳定迭代。探讨了ECT应用该算法的收敛条件,该算法易满足收敛条件且预置矩阵参数选取简单。仿真和实验结果表明,与LBP、OIOR、投影Landweber算法相比,该算法兼备收敛稳定性好及收敛速度快等优点。 展开更多
关键词 热能动力工程 图像重建 投影Landweber法 电容层析成像 迭代算法 广义逆
下载PDF
基于物元可拓模型的火电厂建设项目过程后评价研究 被引量:4
18
作者 牛东晓 李建青 《华北电力大学学报(自然科学版)》 CAS 北大核心 2010年第6期49-54,共6页
火电厂建设项目过程后评价是后评价的重要组成部分,反映了是项目实施的各个阶段的完成情况,通过建立基于AHP和物元可拓模型的火电厂建设项目过程后评价模型,从前期决策、开工准备、工程实施、投资控制四个方面建立了过程后评价指标体系... 火电厂建设项目过程后评价是后评价的重要组成部分,反映了是项目实施的各个阶段的完成情况,通过建立基于AHP和物元可拓模型的火电厂建设项目过程后评价模型,从前期决策、开工准备、工程实施、投资控制四个方面建立了过程后评价指标体系,模型分析结果表明了保定热电八期扩建项目的建设符合决策要求,实施过程控制情况水平为优,指标评价体系和评价方法的建立为以后火电厂建设提供科学、有效的信息和决策依据。 展开更多
关键词 火电厂建设项目 物元可拓模型 指标体系 过程后评价
下载PDF
火电厂建设项目后评价指标体系及其内容构建 被引量:14
19
作者 黄琦 庞昊勇 《太原理工大学学报》 CAS 1998年第5期492-495,554,共5页
论述了当前火力发电厂建设项目后评价特点,根据项目后评价在项目管理中的积极的动态反馈机制和当前后评价在实际应用过程中存在的问题,构建了火力发电厂建设项目后评价的方法、指标体系及其内容。
关键词 火力发电厂 建设项目 后评价
下载PDF
基于蒙特卡洛模拟的火电建设项目投资风险估计 被引量:6
20
作者 骆珣 贾建容 《北京工商大学学报(自然科学版)》 CAS 2006年第3期66-68,共3页
通过所构建的火电建设项目投资价值模型,结合某一火电建设项目的具体实例,叙述了如何运用蒙特卡洛模拟方法、进行火电建设项目投资风险估计的思路.
关键词 火电项目投资 蒙特卡洛模拟 风险估计
下载PDF
上一页 1 2 9 下一页 到第
使用帮助 返回顶部