期刊文献+
共找到14篇文章
< 1 >
每页显示 20 50 100
An efficient method for train-track-substructure dynamic interaction analysis by implicit-explicit integration and multi-time-step solution 被引量:3
1
作者 Lei Xu Wanming Zhai +1 位作者 Shengyang Zhu Weizheng Liu 《Railway Engineering Science》 2023年第1期20-36,共17页
In this work,a method is put forward to obtain the dynamic solution efficiently and accurately for a large-scale train-track-substructure(TTS)system.It is called implicit-explicit integration and multi-time-step solut... In this work,a method is put forward to obtain the dynamic solution efficiently and accurately for a large-scale train-track-substructure(TTS)system.It is called implicit-explicit integration and multi-time-step solution method(abbreviated as mI-nE-MTS method).The TTS system is divided into train-track subsystem and substruc-ture subsystem.Considering that the root cause of low effi-ciency of obtaining TTS solution lies in solving the alge-braic equation of the substructures,the high-efficient Zhai method,an explicit integration scheme,can be introduced to avoid matrix inversion process.The train-track system is solved by implicitly Park method.Moreover,it is known that the requirement of time step size differs for different sub-systems,integration methods and structural frequency response characteristics.A multi-time-step solution is pro-posed,in which time step size for the train-track subsystem and the substructure subsystem can be arbitrarily chosen once satisfying stability and precision demand,namely the time spent for m implicit integral steps is equal to n explicit integral steps,i.e.,mI=nE as mentioned above.The numeri-cal examples show the accuracy,efficiency,and engineering practicality of the proposed method. 展开更多
关键词 Train-track dynamic interaction Substructure system Implicit integration Explicit integration Multi-time-step solution railway engineering
下载PDF
System integration and innovation of operating 20 kt combined heavy-haul train on Datong-Qinhuangdao line 被引量:2
2
作者 Geng Zhixiu 《Engineering Sciences》 EI 2008年第3期12-26,共15页
Datong-Qinhuangdao line, as the first electrified double-track heavy-haul line dedicated to coal transport in China, extends from Datong in the west, and reaches Qinhuangdao in the east, opened to traffic in December,... Datong-Qinhuangdao line, as the first electrified double-track heavy-haul line dedicated to coal transport in China, extends from Datong in the west, and reaches Qinhuangdao in the east, opened to traffic in December, 1992, totaling 653 km with the designed annual traffic volume of 1×108 t. In order to meet the demands of national economic development, the transport capacity of the line must be enhanced greatly. Depending on independent innovation, MOR, for the first time in the world,realizes the integration between GSM-R and Locotrol, the integration between 800 MHz digital radio and Locotrol, and the integration between a single set of Locotrol and SS4 locomotive. Meanwhile, CR develops equipment portfolio for heavy-haul through combining 2 high power locomotives of HXD series (means harmony) with controllable EOT. Relying on integration and innovation, it succeeds in operating 20 kt-level combined heavy-haul train on Datong-Qinhuangdao line, which tripled the annual traffic volume of the line from 1×108 t in 2002 to 3×108 t in 2007. 展开更多
关键词 China railways Datong-Qinhuangdao line 20 kt-level combined heavy-haul train integration and innovation
下载PDF
Traction power systems for electrified railways:evolution,state of the art,and future trends 被引量:1
3
作者 Haitao Hu Yunjiang Liu +4 位作者 Yong Li Zhengyou He Shibin Gao Xiaojuan Zhu Haidong Tao 《Railway Engineering Science》 EI 2024年第1期1-19,共19页
Traction power systems(TPSs)play a vital role in the operation of electrified railways.The transformation of conventional railway TPSs to novel structures is not only a trend to promote the development of electrified ... Traction power systems(TPSs)play a vital role in the operation of electrified railways.The transformation of conventional railway TPSs to novel structures is not only a trend to promote the development of electrified railways toward high-efficiency and resilience but also an inevitable requirement to achieve carbon neutrality target.On the basis of sorting out the power supply structures of conventional AC and DC modes,this paper first reviews the characteristics of the existing TPSs,such as weak power supply flexibility and low-energy efficiency.Furthermore,the power supply structures of various TPSs for future electrified railways are described in detail,which satisfy longer distance,low-carbon,high-efficiency,high-reliability and high-quality power supply requirements.Meanwhile,the application prospects of different traction modes are discussed from both technical and economic aspects.Eventually,this paper introduces the research progress of mixed-system electrified railways and traction power supply technologies without catenary system,speculates on the future development trends and challenges of TPSs and predicts that TPSs will be based on the continuous power supply mode,employing power electronic equipment and intelligent information technology to construct a railway comprehensive energy system with renewable energy. 展开更多
关键词 railway traction power system Future electrified railway Flexible continuous power supply Renewable energy integrated energy system
下载PDF
Study on Urban Design of Luohu Railway Station Area from the Perspective of Integrated Urban Design
4
作者 ZHANG Xinxin ZHU Jie 《Journal of Landscape Research》 2017年第3期47-51,56,共6页
Traffic hub in modern cities has gradually evolved into a multi-functional, all-around and three-dimensional complex. Based on the integrated thinking and relevant urban design theories, this paper took Shenzhen Luohu... Traffic hub in modern cities has gradually evolved into a multi-functional, all-around and three-dimensional complex. Based on the integrated thinking and relevant urban design theories, this paper took Shenzhen Luohu Railway Station for example, evaluated the status quo of the study area from the perspectives of spatial form and public space, including traffic space, square, walking space, green space and waterfront system, and put forward corresponding suggestions. 展开更多
关键词 integration Luohu railway STATION area URBAN design
下载PDF
Grounding Impedance Measurement of High Speed Railway Integrated Grounding System
5
作者 Zhang Yi Jianguo Wang +2 位作者 Yadong Fan Mi Zhou Li Cai 《Journal of Power and Energy Engineering》 2015年第4期194-199,共6页
The high-speed railway integrated grounding system is the basic guarantee for the safe and stable operation of the railway. It is the world’s largest long-distance horizontally elongated joint grounding system, which... The high-speed railway integrated grounding system is the basic guarantee for the safe and stable operation of the railway. It is the world’s largest long-distance horizontally elongated joint grounding system, which stretches the length of hundreds to thousands of kilometers, and its structure is not only different from power station and substation grounding system, but also different from the transmission line tower, lightning rod and other small grounding devices. There is little research information on the grounding impedance of high-speed railway integrated grounding system. This paper adopted 0.618 compensation method and reverse away method respectively, measured a section of high-speed railway integrated grounding system grounding impedance by JD16 and CA6425. Measurement results are in good agreement using those two type instrument. By using 0.618 compensation method, the measurement result will be gradually converged at 0.3 Ω with the increasing of current electrode distance, which is the real grounding impedance of integrated grounding system. By using reverse away method, the maximum measurement result difference is less than 0.024 Ω with the lead of current electrode distance increasing. The measurement results will be rapidly converged 0.25 Ω. The results showed that the reverse away method is helpful to shorten the length of current electrode wiring. The measurement error will be small when the current electrode wiring is longer. 展开更多
关键词 HIGH-SPEED railway integrATED GROUNDING System GROUNDING IMPEDANCE
下载PDF
Challenges of the Performance Standards of the International Finance Corporation in Financing the African Integrated High-Speed Railway Network and the Way Forward: The Case of Standard Gauge Railway in Tanzania
6
作者 Emmanuele Elifadhili Mchome Uwezo Wilbard Nzoya 《Journal of Transportation Technologies》 2023年第4期772-788,共17页
Financing of the African Integrated High-Speed Railway Network (AIHSRN) through Standard Gauge Railway (SGR) Projects is very expensive. As a result, most of the African countries seek financial supports from the Inte... Financing of the African Integrated High-Speed Railway Network (AIHSRN) through Standard Gauge Railway (SGR) Projects is very expensive. As a result, most of the African countries seek financial supports from the International Financial Institutions (IFIs). However, conditions provided by the IFIs through the Performance Standards (PS) of the International Financial Corporation (IFC) increase cost of the projects and thus, it becomes a burden to most of the African countries. This study aimed to explore the causes of IFC-PS through the SGR Projects that escalate costs and how to address them. The Tanzania SGR Lot 1 Project that covered 205 km from Dar es Salaam to Morogoro was selected as a case study. The methods used for data collection involved literature review, focus group discussions and interviews. The results and findings show a gap between the IFC-PS and the National Laws and Regulations that escalates costs of the projects if funds from the IFIs were to be secured. To bridge the gap, it is recommended that the African countries should engage into negotiations with the IFIs to agree to waive IFC-PS conditions that escalate costs provided they are adequately covered in the national laws and regulations;engagement of locally established national and regional financial institutions;and the responsible government institutions in the African countries should sit together for assessment and review of the IFC-PS against the national laws and regulations. 展开更多
关键词 African integrated High-Speed railway Network International Financial Institutions Standard Gauge railway Performance Standards
下载PDF
Scheme of Railway 5G Integrated Innovation Test Platform
7
作者 CHAI Jinchuan ZHENG Mingda 《Chinese Railways》 2023年第1期62-70,共9页
An inevitable trend has already taken shape for the application of the 5th Generation Mobile Communication Technology(5G)in the railway sector.The application scenarios and business types of the railway sector are com... An inevitable trend has already taken shape for the application of the 5th Generation Mobile Communication Technology(5G)in the railway sector.The application scenarios and business types of the railway sector are complex and diverse,so it is indispensable to test and verify the railway 5G before actual deployment.The design and creation of the railway 5G integrated innovation test platform provides engineering design,test and verification conditions for the networking,coverage and business development of 5G public networks and 5G-R in railway scenarios.This paper introduces the design of the overall architecture for the integrated railway 5G innovation test platform according to the railway network requirements,application scenarios and intelligent development trend;respectively elaborates on the design of the 5G-R core network,bearer network and wireless access along loop tracks,in combination with the characteristics of railway scenarios and the requirements of railway dispatching,operation and safety;raises further solutions on the network deployment and coverage schemes of 5G public networks so as to meet the application requirements of 5G public networks.The study results show that the integrated railway 5G innovation test platform scheme contains co-existence of 5G public and private networks,combines the indoor and outdoor scenarios,as well as takes into account of the dynamic and static tests so as to meet the environmental requirements for the integrated railway 5G test and application of all network functions,for which it can provide comprehensive technical support for railway 5G technology research and development,standard formulation,testing,etc. 展开更多
关键词 railway communication 5G public network 5G-R integrated innovation test platform
下载PDF
Developments and Prospects of Long-Span High-Speed Railway Bridge Technologies in China 被引量:64
8
作者 Shunquan Qin Zongyu Gao 《Engineering》 SCIE EI 2017年第6期787-794,共8页
With the rapid developments of the high-speed railway in China, a great number of long-span bridges have been constructed in order to cross rivers and gorges. At present, the longest main span of a constructed high-sp... With the rapid developments of the high-speed railway in China, a great number of long-span bridges have been constructed in order to cross rivers and gorges. At present, the longest main span of a constructed high-speed railway bridge is only 630 m. The main span of Hutong Yangtze River Bridge and of Wufengshan Yangtze River Bridge, which are under construction, will be much longer, at 1092 m each. In order to overcome the technical issues that originate from the extremely large dead loading and the relatively small structural stiffness of long-span high-speed railway bridges, many new technologies in bridge construction, design, materials, and so forth have been developed. This paper carefully reviews progress in the construction technologies of multi-function combined bridges in China, including com- bined highway and railway bridges and multi-track railway bridges. Innovations and practices regarding new types of bridge and composite bridge structures, such as bridges with three cable planes and three main trusses, inclined main trusses, slab-truss composite sections, and steel-concrete composite sections, are introduced. In addition, investigations into high-performance materials and integral fabrication and erection techniques for long-span railway bridges are summarized. At the end of the paper, prospects for the future development of long-span high-speed railwav bridges are provided. 展开更多
关键词 High-speed railway Long-span bridges Multi-function combined bridges High-performance materials Spatial structures with three cable planes integral fabrication
下载PDF
A GIS Pre and Post Processing Contribution to a Multi Techniques Test Survey for an Ancient Railway Restoration in the Brembana Valley
9
作者 Barbara Marana 《Journal of Geographic Information System》 2018年第5期573-602,共30页
Stemming from the renewed desire to requalify the former Brembana Valley railway route (inside one of the valleys of the Province of Bergamo and close to the important city of Milan), from Bergamo to Villa d’Almè... Stemming from the renewed desire to requalify the former Brembana Valley railway route (inside one of the valleys of the Province of Bergamo and close to the important city of Milan), from Bergamo to Villa d’Almè, in 2017, the Bergamo Transport Company and other partners have signed a memorandum of understanding. They have also entrusted a project company to develop a technical and economic viability study, which would be an update of a preliminary one presented in 2009. A private proposal for the realization of a test survey, useful for the required engineering project, has been submitted to the project company and accepted. For this reason, a team, comprising different companies, and among them also the Geomatics group at the University of Bergamo, was formed so as to perform this task and develop it in a degree thesis. The aim of the test survey is to evaluate a joint use of the new available technologies, so as to possibly get faster, more economic and thorough results, by performing a 3D metric analysis over two sub-areas selected along the route. The paper describes this experience and the achieved results. In particular, the areas of interest in the test project have been analyzed first thing with a GIS software and then surveyed with a multi-sensor approach, i.e. terrestrial laser scanner, GNSS techniques and UAV. The final integrated results allowed providing a metric model of the morphological and urban aspect for the territorial layout, useful also for further advanced GIS analyses. The analysis of the reached precisions has provided satisfactory results which agree with the metric requirements of the project. Further meaningful considerations can be derived from this test survey: the implementation of different techniques has helped to overcome problems due to hidden parts in complex objects, it has allowed to provide a faster survey and to test different technologies and software packages. The results have been quite satisfactory. 展开更多
关键词 Brembana VALLEY railway RESTORATION TEST SURVEY MULTI Sensor Acquisition integrated Results GIS Analyses
下载PDF
Railway's Effects on Economic Development:A Quantitative Study on Modern Henan(1890s-1930s)
10
作者 Gao Shuang 《China Economist》 2016年第6期80-97,共18页
Different arguments on the relationship between railway construction and economic development exist in literature. As the railway construction of Henan in the period of late Qing Dynasty (1644-1911) and early Republ... Different arguments on the relationship between railway construction and economic development exist in literature. As the railway construction of Henan in the period of late Qing Dynasty (1644-1911) and early Republic of China (1912-1949)provides a nearly natural experiment to throw new light on this topic, this paper creates county-level panel data for this period and conducts a further test with a difference-in-difference strategy. While the effect of railway is demonstrated to be positive in some literature yet negative in others, this paper identifies some major intergroup differences: railway lines put into service after the 1910s and connecting central cities promoted population growth in regions along the railway lines, enhanced their capaci(v to cope with external market shocks, yet they did not improve integration with the intra-provincial market. By contrast, the railway lines put into operation in the 1930s and connecting hinterland areas not only improved regional market integration but contributed to higher living standards as well. The implication is that the effects of railway are subject to the economic relations of various localities along the railway lines and the economic attributes of various sectors, thus railways cannot be generally defined to be positive or negative. This conclusion helps explain the disagreements in empirical studies and highlight the impact of railways on the regional economic structure. 展开更多
关键词 late Qing Dynasty and early Republican Period railway population density market integration welfare level
下载PDF
Study on key technologies of GNSS-based train state perception for traincentric railway signaling
11
作者 Baigen Cai Jingnan Liu +1 位作者 Xurong Dong Jiang Liu 《High-Speed Railway》 2023年第1期47-55,共9页
The application of Global Navigation Satellite Systems(GNSSs)in the intelligent railway systems is rapidly developing all over the world.With the GNSs-based train positioning and moving state perception,the autonomy a... The application of Global Navigation Satellite Systems(GNSSs)in the intelligent railway systems is rapidly developing all over the world.With the GNSs-based train positioning and moving state perception,the autonomy and flexibility of a novel train control system can be greatly enhanced over the existing solutions relying on the track-side facilities.Considering the safety critical features of the railway signaling applications,the GNSS stand-alone mode may not be sufficient to satisfy the practical requirements.In this paper,the key technologies for applying GNSS in novel train-centric railway signaling systems are investigated,including the multi-sensor data fusion,Virtual Balise(VB)capturing and messaging,train integrity monitoring and system performance evaluation.According to the practical characteristics of the novel train control system under the moving block mode,the details of the key technologies are introduced.Field demonstration results of a novel train control system using the presented technologies under the practical railway operation conditions are presented to illustrate the achievable performance feature of autonomous train state perception using BeiDou Navigation Satellite System(BDS)and related solutions.It reveals the great potentials of these key technologies in the next generation train control system and other GNSS-based railway implementations. 展开更多
关键词 railway signaling Train control Global Navigation Satellite System Sensor data fusion Virtual Balise Train integrity Performance evaluation
下载PDF
A train timetable rescheduling approach based on multi-train tracking optimization of high-speed railways
12
作者 Rongsheng Wang Tao Zhang +2 位作者 Zhiming Yuan Shuxin Ding Qi Zhang 《Railway Sciences》 2023年第3期358-370,共13页
Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signal... Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signaling system.Design/methodology/approach–Firstly,a single-train trajectory optimization(STTO)model is constructed based on train dynamics and operating conditions.The train kinematics parameters,including acceleration,speed and time at each position,are calculated to predict the arrival times in the train timetable.A STTO algorithm is developed to optimize a single-train time-efficient driving strategy.Then,a TTR approach based on multi-train tracking optimization(TTR-MTTO)is proposed with mutual information.The constraints of temporary speed restriction(TSR)and end of authority are decoupled to calculate the tracking trajectory of the backward tracking train.The multi-train trajectories at each position are optimized to generate a timeefficient train timetable.Findings–The numerical experiment is performed on the Beijing-Tianjin high-speed railway line and CR400AF.The STTO algorithm predicts the train’s planned arrival time to calculate the total train delay(TTD).As for the TSR scenario,the proposed TTR-MTTO can reduce TTD by 60.60%compared with the traditional TTR approach with dispatchers’experience.Moreover,TTR-MTTO can optimize a time-efficient train timetable to help dispatchers reschedule trains more reasonably.Originality/value–With the cooperative relationship and mutual information between train rescheduling and control,the proposed TTR-MTTO approach can automatically generate a time-efficient train timetable to reduce the total train delay and the work intensity of dispatchers. 展开更多
关键词 High-speed railway Train timetable rescheduling Multi-train trajectory optimization Train operation control integration of train rescheduling and control
下载PDF
Coordinated Dispatch of Integrated Electricity-Natural Gas System and the Freight Railway Network 被引量:5
13
作者 Tao Long Zhaohong Bie +1 位作者 Lizhou Jiang Haipeng Xie 《CSEE Journal of Power and Energy Systems》 SCIE CSCD 2020年第4期782-792,共11页
With the significant development of liquefied natural gas(LNG)rail transport,the railway system is increasingly more closely connected with the integrated electricity-natural gas system(IEGS).To coordinate the economi... With the significant development of liquefied natural gas(LNG)rail transport,the railway system is increasingly more closely connected with the integrated electricity-natural gas system(IEGS).To coordinate the economic operations of the two systems,this paper innovatively proposes a coordinated dispatch model of IEGS with LNG infrastructures and a freight railway network with LNG transport.First,an operational scheduling model of the railway network,considering energy consumption,is put forward for both LNG transmission and ordinary freight transport.Then,the coordinated dispatch problem of IEGS and the railway network is formulated into a mixed-integer linear programming model via the big M method and a modified incremental linearization approach.Finally,a bi-level optimization algorithm based on generalized benders decomposition(GBD)is presented to solve the coordinated dispatch problem due to the restrictions on exchanging private information.Case studies demonstrate the effectiveness of the proposed model and algorithm as well as the potential benefit for wind power accommodation. 展开更多
关键词 Freight railway network generalized benders decomposition(GBD) integrated electricity-natural gas system(IEGS) liquefied natural gas(LNG) wind power accommodation
原文传递
Integrated Railway Smart Grid Architecture Based on Energy Routers
14
作者 Peng Yao Hao Wang +3 位作者 Yijun Liu Jinping Niu Zhiwei Zhu Lin Lin 《Chinese Journal of Electrical Engineering》 CSCD 2021年第4期93-106,共14页
Railway power system is an inseparable part of the power system,therefore,the intelligent architecture of the railway power system should also be focused on.The unique power supply characteristics of the railway power... Railway power system is an inseparable part of the power system,therefore,the intelligent architecture of the railway power system should also be focused on.The unique power supply characteristics of the railway power system are analyzed and integrated railway smart grid architecture based on energy routers is proposed.Importantly,three corresponding resilient mode control methods are suggested for the proposed architecture.In the fourth section,a simulation model corresponding to the resilient control mode is built and the simulation results prove the feasibility of the proposed control mode.Equally,for the novel network-connected backbone router(NCBR),a 1000 kVA,27.5/10 kV NCBR engineering prototype is used to prove its effectiveness in practical applications.Finally,a differentiation analysis is given,followed by conclusions regarding the traditional power system and proposed system. 展开更多
关键词 railway traction power system railway electric distribution system integrated railway smart grid architecture energy migration router network-connected backbone router engineering prototype
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部