Tunnels in an urban area, in many cases, are constructed in soft ground which contains underground water, near existing facilities and structures. Structural stability for the tunnel and also the nearby structures and...Tunnels in an urban area, in many cases, are constructed in soft ground which contains underground water, near existing facilities and structures. Structural stability for the tunnel and also the nearby structures and facilities is vital in this kind of work. Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of underground pipelines of sewage systems. This method utilizes mud slurry that is formed around the pipes in order to stabilize the surrounding soil. In the pipe roof method the tubing elements that are constructed by slurry pipe jacking are near each other longitudinally, and create a rigid and stable lining before the excavation of the main tunnel. This paper discusses 'the application of a slurry pipe jacking system on 'the pipe roof method by means of numerical analysis. Because of the rigid behavior of the lining, the results show little subsidence, making this method a reliable method of constructing large tunnels with small cover in an urban area.展开更多
Trenchless technology is often used in congested urban areas or river crossings to install underground pipelines to minimize disturbance to surface traffic or other activities.Pipe jacking is a typical technique appli...Trenchless technology is often used in congested urban areas or river crossings to install underground pipelines to minimize disturbance to surface traffic or other activities.Pipe jacking is a typical technique applied to jack pipe segments between two working shafts.However,the design of the jacking force is usually implemented using empirical methods.It should be emphasized that the jacking force will change for each site,depending on the magnitude of overcut,lubricants,work stoppages,geology and misalignment.A particle method is proposed to estimate the jacking force along the pipe.The microparameters are calibrated for sandy soils in Shenyang,so that the macroscale material behavior can be reproduced using the particle model.Hence,the normal force around the pipe circumference can be derived in the particle model,after which the interface friction coefficient is applied to evaluate the friction resistance mobilized at the soil-pipe interface.A modified Protodyakonov’s arch model can be used to assess the magnitude of earth pressure acting on the shield face.In the end,the combination of friction resistance and face pressure provides the jacking force.The efficacy of the proposed particle method is demonstrated by comparing calculated jacking forces with those measured in the field for three types of jacking machines in sandy soils under the Hun River,Shenyang.展开更多
针对在越江海高水压水下超大直径盾构隧道联络通道施工过程中缺乏足够的工程技术标准和案例经验、设计与施工面临众多挑战问题,以广州海珠湾超大直径盾构隧道区间的6条联络通道工程为例,对工程地质补勘资料及现场施工情况进行分析,揭示...针对在越江海高水压水下超大直径盾构隧道联络通道施工过程中缺乏足够的工程技术标准和案例经验、设计与施工面临众多挑战问题,以广州海珠湾超大直径盾构隧道区间的6条联络通道工程为例,对工程地质补勘资料及现场施工情况进行分析,揭示原矿山法设计施工方案存在的不足,并基于此提出“矿山法结合地层冻结加固方案”和“机械顶管法施工方案”2种优化方案;随后在安全性、经济性、施工工期等方面对不同工法进行综合优选分析,同时引入碳排放指标进行绿色低碳评估。研究结果表明:1)机械顶管法在安全性和施工效率上优于其他方案,能够显著缩短施工周期;2)相比矿山法结合地层冻结加固方案,机械顶管法方案碳排放量减少了2 747.51 t CO_(2e)。展开更多
Jacking force is one of the important safety indicators during pipe jacking construction.Existing models for calculating jacking force are widely used in the calculation of jacking force for pipe with regular cross-se...Jacking force is one of the important safety indicators during pipe jacking construction.Existing models for calculating jacking force are widely used in the calculation of jacking force for pipe with regular cross-sections.In this paper,considering pipe-soil interaction,the cross-sectional characteristics and the distribution characteristics between pipe and soil,the calculation equations for the jacking force of circular steel pipe with flange plate were proposed based on the pressure arch theory.The proposed equations were applied to calculate the jacking force for the Olympic Sports Center Subway Station of Line 9 in Shenyang,China,and the results were compared with the field monitoring data to predict the accurate jacking force.Based on the proposed equations,the influences of the flange plate position and steel pipe diameter on earth pressure around the pipe were analyzed.The functional relationship between the earth pressure and the position of flange plate or the pipe diameter was obtained,which provides design basis and theoretical guidance for engineering practice.展开更多
文摘Tunnels in an urban area, in many cases, are constructed in soft ground which contains underground water, near existing facilities and structures. Structural stability for the tunnel and also the nearby structures and facilities is vital in this kind of work. Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of underground pipelines of sewage systems. This method utilizes mud slurry that is formed around the pipes in order to stabilize the surrounding soil. In the pipe roof method the tubing elements that are constructed by slurry pipe jacking are near each other longitudinally, and create a rigid and stable lining before the excavation of the main tunnel. This paper discusses 'the application of a slurry pipe jacking system on 'the pipe roof method by means of numerical analysis. Because of the rigid behavior of the lining, the results show little subsidence, making this method a reliable method of constructing large tunnels with small cover in an urban area.
文摘Trenchless technology is often used in congested urban areas or river crossings to install underground pipelines to minimize disturbance to surface traffic or other activities.Pipe jacking is a typical technique applied to jack pipe segments between two working shafts.However,the design of the jacking force is usually implemented using empirical methods.It should be emphasized that the jacking force will change for each site,depending on the magnitude of overcut,lubricants,work stoppages,geology and misalignment.A particle method is proposed to estimate the jacking force along the pipe.The microparameters are calibrated for sandy soils in Shenyang,so that the macroscale material behavior can be reproduced using the particle model.Hence,the normal force around the pipe circumference can be derived in the particle model,after which the interface friction coefficient is applied to evaluate the friction resistance mobilized at the soil-pipe interface.A modified Protodyakonov’s arch model can be used to assess the magnitude of earth pressure acting on the shield face.In the end,the combination of friction resistance and face pressure provides the jacking force.The efficacy of the proposed particle method is demonstrated by comparing calculated jacking forces with those measured in the field for three types of jacking machines in sandy soils under the Hun River,Shenyang.
文摘针对在越江海高水压水下超大直径盾构隧道联络通道施工过程中缺乏足够的工程技术标准和案例经验、设计与施工面临众多挑战问题,以广州海珠湾超大直径盾构隧道区间的6条联络通道工程为例,对工程地质补勘资料及现场施工情况进行分析,揭示原矿山法设计施工方案存在的不足,并基于此提出“矿山法结合地层冻结加固方案”和“机械顶管法施工方案”2种优化方案;随后在安全性、经济性、施工工期等方面对不同工法进行综合优选分析,同时引入碳排放指标进行绿色低碳评估。研究结果表明:1)机械顶管法在安全性和施工效率上优于其他方案,能够显著缩短施工周期;2)相比矿山法结合地层冻结加固方案,机械顶管法方案碳排放量减少了2 747.51 t CO_(2e)。
基金supported by the National Natural Science Foundation of China(No.51878127).
文摘Jacking force is one of the important safety indicators during pipe jacking construction.Existing models for calculating jacking force are widely used in the calculation of jacking force for pipe with regular cross-sections.In this paper,considering pipe-soil interaction,the cross-sectional characteristics and the distribution characteristics between pipe and soil,the calculation equations for the jacking force of circular steel pipe with flange plate were proposed based on the pressure arch theory.The proposed equations were applied to calculate the jacking force for the Olympic Sports Center Subway Station of Line 9 in Shenyang,China,and the results were compared with the field monitoring data to predict the accurate jacking force.Based on the proposed equations,the influences of the flange plate position and steel pipe diameter on earth pressure around the pipe were analyzed.The functional relationship between the earth pressure and the position of flange plate or the pipe diameter was obtained,which provides design basis and theoretical guidance for engineering practice.
基金Project(52078129)supported by the National Natural Science Foundation of ChinaProjects(KYCX22_0268,SJCX21_0031)supported by the Postgraduate Research&Practice Innovation Program of Jiangsu Province,China。