Air spares support is general term of using and repairing of aircrafts which is the material foundation of aero technical support, its effectiveness influences operational effectiveness and equipments of aircrafts dir...Air spares support is general term of using and repairing of aircrafts which is the material foundation of aero technical support, its effectiveness influences operational effectiveness and equipments of aircrafts directly. Based on particle swarm optimization algorithm, a new model is proposed to optimize the distribution of the cost of air spares, it take the funds as resource and the improvement of performance efficiency as objective and deduces the expressions to get the best distribution plan. The results of experiments indicate that this model can make full use of the limited funds and obtain the highest efficiency of air spares support.展开更多
In equipment integrated logistics support(ILS), the supply capability of spare parts is a significant factor. There are lots of depots in the traditional support system, which makes too many redundant spare parts and ...In equipment integrated logistics support(ILS), the supply capability of spare parts is a significant factor. There are lots of depots in the traditional support system, which makes too many redundant spare parts and causes high cost of support. Meanwhile,the inconsistency among depots makes it difficult to manage spare parts. With the development of information technology and transportation, the supply network has become more efficient. In order to further improve the efficiency of supply-support work and the availability of the equipment system, building a system of one centralized depot with multiple depots becomes an appropriate way.In this case, location selection of the depots including centralized depots and multiple depots becomes a top priority in the support system. This paper will focus on the location selection problem of centralized depots considering ILS factors. Unlike the common location selection problem, depots in ILS require a higher service level. Therefore, it becomes desperately necessary to take the high requirement of the mission into account while determining location of depots. Based on this, we raise an optimal depot location model. First, the expected transportation cost is calculated.Next, factors in ILS such as response time, availability and fill rate are analyzed for evaluating positions of open depots. Then, an optimization model of depot location is developed with the minimum expected cost of transportation as objective and ILS factors as constraints. Finally, a numerical case is studied to prove the validity of the model by using the genetic algorithm. Results show that depot location obtained by this model can guarantee the effectiveness and capability of ILS well.展开更多
In order to facilitate spare parts management,an integrated approach of BP neural network and supportability analysis(SA)was proposed to evaluate the criticality of spare parts as well as to prioritize spare parts.Inf...In order to facilitate spare parts management,an integrated approach of BP neural network and supportability analysis(SA)was proposed to evaluate the criticality of spare parts as well as to prioritize spare parts.Influential factors of prioritizing spare parts were detailedly analyzed.Framework of the integrated method was established.The modelling process based on BP neural network was presented.As the input of the neural network,the values of influential factors were determined by supportability analysis data.Based on the presented method,spare parts could be automatically prioritized after supportability analysis for a new system.A case study results showed that the new method was applicable and effective.展开更多
In order to optimize the spares configuration project at different stages during the life cycle, the factor of time is considered to relax the assumption of the spares steady demand in multi-echelon technique for reco...In order to optimize the spares configuration project at different stages during the life cycle, the factor of time is considered to relax the assumption of the spares steady demand in multi-echelon technique for recoverable item control (METRIC) theory. According to the method of systems analysis, the dynamic palm theorem is introduced to establish the prediction model of the spares demand rate, and its main influence factors are analyzed, based on which, the spares support effectiveness evaluation index system is studied, and the system optimization-oriented spares dynamic configuration method for multi-echelon multi-indenture system is proposed. Through the analysis of the optimization algorithm, the layered marginal algorithm is designed to improve the model calculation efficiency. In a given example, the multi-stage spares configuration project during its life cycle is gotten, the research result conforms to the actual status, and it can provide a new way for the spares dynamic optimization.展开更多
Spare parts are very common in industry and military fields, and the investigations of spare parts demand forecasting methods have draws much attention in recent years. However,to the best of our knowledge,only few pa...Spare parts are very common in industry and military fields, and the investigations of spare parts demand forecasting methods have draws much attention in recent years. However,to the best of our knowledge,only few papers reviewed the forecasting papers systematically. This paper is an attempt to provide a novel and comprehensive view to summarize these methods. A new framework was proposed to classify the demand forecasting methods into four categories,including empirical methods,methods based on historical data,analytical methods and simulation methods. Some typical literatures related to each category were reviewed.Moreover, a general spare parts forecasting procedure was summarized and some evaluation criteria were presented. Finally,characteristics of different forecasting methods and some avenues for further research were illustrated. This work provides the managers with a systematical idea about the spare parts demand forecasting and it can be used in practical applications.展开更多
Due to the fact that in ship maintena n ce process,the method of determining the number of spare parts is not scientific and the actual operation is complicated,this paper analyzes four major facto rs affecting the nu...Due to the fact that in ship maintena n ce process,the method of determining the number of spare parts is not scientific and the actual operation is complicated,this paper analyzes four major facto rs affecting the number of ship spare parts,including number of main planned op eration s,total times of disassembling in maintenance,accumulated working time and mea n t ime between failures.It also establishes a spare parts demand forecast model b ased on the affecting factors and radial-basis function(RBF) neural network.F inally,the paper provide s forecast examples and makes a comparison between the examples and back propaga tion(BP) neura l network forecast result.The comparison results s how that the forecast based on RBF neural network is simple and the forecast res ult fits the actual situa tion and fitting effect is better than that based on BP.展开更多
文摘Air spares support is general term of using and repairing of aircrafts which is the material foundation of aero technical support, its effectiveness influences operational effectiveness and equipments of aircrafts directly. Based on particle swarm optimization algorithm, a new model is proposed to optimize the distribution of the cost of air spares, it take the funds as resource and the improvement of performance efficiency as objective and deduces the expressions to get the best distribution plan. The results of experiments indicate that this model can make full use of the limited funds and obtain the highest efficiency of air spares support.
基金supported by the Science Challenge Project(TZ2018007)the National Natural Science Foundation of China(71671009+2 种基金 61871013 61573041 61573043)
文摘In equipment integrated logistics support(ILS), the supply capability of spare parts is a significant factor. There are lots of depots in the traditional support system, which makes too many redundant spare parts and causes high cost of support. Meanwhile,the inconsistency among depots makes it difficult to manage spare parts. With the development of information technology and transportation, the supply network has become more efficient. In order to further improve the efficiency of supply-support work and the availability of the equipment system, building a system of one centralized depot with multiple depots becomes an appropriate way.In this case, location selection of the depots including centralized depots and multiple depots becomes a top priority in the support system. This paper will focus on the location selection problem of centralized depots considering ILS factors. Unlike the common location selection problem, depots in ILS require a higher service level. Therefore, it becomes desperately necessary to take the high requirement of the mission into account while determining location of depots. Based on this, we raise an optimal depot location model. First, the expected transportation cost is calculated.Next, factors in ILS such as response time, availability and fill rate are analyzed for evaluating positions of open depots. Then, an optimization model of depot location is developed with the minimum expected cost of transportation as objective and ILS factors as constraints. Finally, a numerical case is studied to prove the validity of the model by using the genetic algorithm. Results show that depot location obtained by this model can guarantee the effectiveness and capability of ILS well.
文摘In order to facilitate spare parts management,an integrated approach of BP neural network and supportability analysis(SA)was proposed to evaluate the criticality of spare parts as well as to prioritize spare parts.Influential factors of prioritizing spare parts were detailedly analyzed.Framework of the integrated method was established.The modelling process based on BP neural network was presented.As the input of the neural network,the values of influential factors were determined by supportability analysis data.Based on the presented method,spare parts could be automatically prioritized after supportability analysis for a new system.A case study results showed that the new method was applicable and effective.
基金supported by the National Defense Pre-research Project in 13th Five-Year(41404050502)the National Defense Science and Technology Fund of the Central Military Commission(2101140)
文摘In order to optimize the spares configuration project at different stages during the life cycle, the factor of time is considered to relax the assumption of the spares steady demand in multi-echelon technique for recoverable item control (METRIC) theory. According to the method of systems analysis, the dynamic palm theorem is introduced to establish the prediction model of the spares demand rate, and its main influence factors are analyzed, based on which, the spares support effectiveness evaluation index system is studied, and the system optimization-oriented spares dynamic configuration method for multi-echelon multi-indenture system is proposed. Through the analysis of the optimization algorithm, the layered marginal algorithm is designed to improve the model calculation efficiency. In a given example, the multi-stage spares configuration project during its life cycle is gotten, the research result conforms to the actual status, and it can provide a new way for the spares dynamic optimization.
文摘Spare parts are very common in industry and military fields, and the investigations of spare parts demand forecasting methods have draws much attention in recent years. However,to the best of our knowledge,only few papers reviewed the forecasting papers systematically. This paper is an attempt to provide a novel and comprehensive view to summarize these methods. A new framework was proposed to classify the demand forecasting methods into four categories,including empirical methods,methods based on historical data,analytical methods and simulation methods. Some typical literatures related to each category were reviewed.Moreover, a general spare parts forecasting procedure was summarized and some evaluation criteria were presented. Finally,characteristics of different forecasting methods and some avenues for further research were illustrated. This work provides the managers with a systematical idea about the spare parts demand forecasting and it can be used in practical applications.
文摘Due to the fact that in ship maintena n ce process,the method of determining the number of spare parts is not scientific and the actual operation is complicated,this paper analyzes four major facto rs affecting the number of ship spare parts,including number of main planned op eration s,total times of disassembling in maintenance,accumulated working time and mea n t ime between failures.It also establishes a spare parts demand forecast model b ased on the affecting factors and radial-basis function(RBF) neural network.F inally,the paper provide s forecast examples and makes a comparison between the examples and back propaga tion(BP) neura l network forecast result.The comparison results s how that the forecast based on RBF neural network is simple and the forecast res ult fits the actual situa tion and fitting effect is better than that based on BP.