期刊文献+
共找到2,911篇文章
< 1 2 146 >
每页显示 20 50 100
Unmanned Aerial Vehicle Inspection Routing and Scheduling for Engineering Management
1
作者 Lu Zhen Zhiyuan Yang +2 位作者 Gilbert Laporte Wen Yi Tianyi Fan 《Engineering》 SCIE EI CAS CSCD 2024年第5期223-239,共17页
Technological advancements in unmanned aerial vehicles(UAVs)have revolutionized various industries,enabling the widespread adoption of UAV-based solutions.In engineering management,UAV-based inspection has emerged as ... Technological advancements in unmanned aerial vehicles(UAVs)have revolutionized various industries,enabling the widespread adoption of UAV-based solutions.In engineering management,UAV-based inspection has emerged as a highly efficient method for identifying hidden risks in high-risk construction environments,surpassing traditional inspection techniques.Building on this foundation,this paper delves into the optimization of UAV inspection routing and scheduling,addressing the complexity introduced by factors such as no-fly zones,monitoring-interval time windows,and multiple monitoring rounds.To tackle this challenging problem,we propose a mixed-integer linear programming(MILP)model that optimizes inspection task assignments,monitoring sequence schedules,and charging decisions.The comprehensive consideration of these factors differentiates our problem from conventional vehicle routing problem(VRP),leading to a mathematically intractable model for commercial solvers in the case of large-scale instances.To overcome this limitation,we design a tailored variable neighborhood search(VNS)metaheuristic,customizing the algorithm to efficiently solve our model.Extensive numerical experiments are conducted to validate the efficacy of our proposed algorithm,demonstrating its scalability for both large-scale and real-scale instances.Sensitivity experiments and a case study based on an actual engineering project are also conducted,providing valuable insights for engineering managers to enhance inspection work efficiency. 展开更多
关键词 Engineering management Unmanned aerial vehicle Inspection routing and scheduling OPTIMIZATION Mixed-integer linear programming model Variable neighborhood search metaheuristic
下载PDF
AGV Scheduling Optimization of Automated Port Based on Disruption Management
2
作者 Ching-Kuei Kao Qi-Er Ke +1 位作者 King-Zoo Tang Peng-Jung Lin 《Journal of Transportation Technologies》 2024年第3期423-444,共22页
The recent rapid development of China’s foreign trade has led to the significant increase in waterway transportation and automated container ports. Automated terminals can significantly improve the loading and unload... The recent rapid development of China’s foreign trade has led to the significant increase in waterway transportation and automated container ports. Automated terminals can significantly improve the loading and unloading efficiency of container terminals. These terminals can also increase the port’s transportation volume while ensuring the quality of cargo loading and unloading, which has become an inevitable trend in the future development of ports. However, the continuous growth of the port’s transportation volume has increased the horizontal transportation pressure on the automated terminal, and the problems of route conflicts and road locks faced by automated guided vehicles (AGV) have become increasingly prominent. Accordingly, this work takes Xiamen Yuanhai automated container terminal as an example. This work focuses on analyzing the interference problem of path conflict in its horizontal transportation AGV scheduling. Results show that path conflict, the most prominent interference factor, will cause AGV scheduling to be unable to execute the original plan. Consequently, the disruption management was used to establish a disturbance recovery model, and the Dijkstra algorithm for combining with time windows is adopted to plan a conflict-free path. Based on the comparison with the rescheduling method, the research obtains that the deviation of the transportation path and the deviation degree of the transportation path under the disruption management method are much lower than those of the rescheduling method. The transportation path deviation degree of the disruption management method is only 5.56%. Meanwhile, the deviation degree of the transportation path under the rescheduling method is 44.44%. 展开更多
关键词 Automated Port Disruption management Automated Guided Vehicle scheduling Dijkstra Algorithm
下载PDF
Quantitative Approaches on Staff Scheduling and Rostering in Hospitality Management: An Overview
3
作者 Marta Rocha Jose F. Oliveira Maria Antonia Carravilla 《American Journal of Operations Research》 2012年第1期137-145,共9页
Staff scheduling and rostering problems, with application in several application areas, from transportation systems to hospitals, have been widely addressed by researchers. This is not the case of hospitality services... Staff scheduling and rostering problems, with application in several application areas, from transportation systems to hospitals, have been widely addressed by researchers. This is not the case of hospitality services, which have been forgotten by the quantitative research literature. The purpose of this paper is to provide some insights on the application of staff scheduling and rostering problems to hospitality management operations, reviewing existing approaches developed in other similar areas, such as nurse rostering or examining adaptable problem models, such as the tour scheduling. 展开更多
关键词 HOSPITALITY management STAFF schedulING ROSTERING
下载PDF
A Transparent and User-Centric Approach to Unify Resource Management and Code Scheduling of Local,Edge,and Cloud
4
作者 ZHOU Yuezhi ZHANG Di ZHANG Yaoxue 《ZTE Communications》 2017年第4期3-11,共9页
Recently, several novel computing paradigms are proposed, e.g., fog computing and edge computing. In such more decentralized computing paradigms, the location and resource for code execution and data storage of end ap... Recently, several novel computing paradigms are proposed, e.g., fog computing and edge computing. In such more decentralized computing paradigms, the location and resource for code execution and data storage of end applications could also be optionally distributed among different places or machines. In this paper, we position that this situation requires a new transparent and usercentric approach to unify the resource management and code scheduling from the perspective of end users. We elaborate our vision and propose a software-defined code scheduling framework. The proposed framework allows the code execution or data storage of end applications to be adaptively done at appropriate machines under the help of a performance and capacity monitoring facility, intelligently improving application performance for end users. A pilot system and preliminary results show the advantage of the framework and thus the advocated vision for end users. 展开更多
关键词 cloud computing fog computing edge computing mobile edge computing resource management and code scheduling
下载PDF
Energy Aware Processor Architecture for Effective Scheduling and Power Management in Cloud Using Inclusive Power-Cognizant Processor Controller
5
作者 Suma Sira Jacob C. Kezi Selva Vijila 《Circuits and Systems》 2016年第8期1822-1833,共13页
The fast acceptance of cloud technology to industry explains increasing energy conservation needs and adoption of energy aware scheduling methods to cloud. Power consumption is one of the top of mind issues in cloud, ... The fast acceptance of cloud technology to industry explains increasing energy conservation needs and adoption of energy aware scheduling methods to cloud. Power consumption is one of the top of mind issues in cloud, because the usage of cloud storage by the individuals or organization grows rapidly. Developing an efficient power management processor architecture has gained considerable attention. However, the conventional power management mechanism fails to consider task scheduling policies. Therefore, this work presents a novel energy aware framework for power management. The proposed system leads to the development of Inclusive Power-Cognizant Processor Controller (IPCPC) for efficient power utilization. To evaluate the performance of the proposed method, simulation experiments inputting random tasks as well as tasks collected from Google Trace Logs were conducted to validate the supremacy of IPCPC. The research based on Real world Google Trace Logs gives results that proposed framework leads to less than 9% of total power consumption per task of server which proves reduction in the overall power needed. 展开更多
关键词 Energy Efficiency Power management Task scheduling Virtual Machine Processor Architecture
下载PDF
Overall plan and design of the task management system of ternary optical computer 被引量:3
6
作者 宋凯 金翊 《Journal of Shanghai University(English Edition)》 CAS 2011年第5期467-472,共6页
t In this paper an overall scheme of the task management system of ternary optical computer (TOC) is proposed, and the software architecture chart is given. The function and accomplishment of each module in the syst... t In this paper an overall scheme of the task management system of ternary optical computer (TOC) is proposed, and the software architecture chart is given. The function and accomplishment of each module in the system are described in general. In addition, according to the aforementioned scheme a prototype of TOC task management system is implemented, and the feasibility, rationality and completeness of the scheme are verified via running and testing the prototype. 展开更多
关键词 ternary optical computer (TOC) task management system overall plan task scheduling processor resource allocation
下载PDF
Impacts of the Financial Factors on Schedule Delays Risk of the International Contracting Projects: Evidence from Highway BOT Pro-jects in Vietnam 被引量:2
7
作者 Hong-Anh Vu Jianqiong Wang +1 位作者 Lianxing Min Thihong-Nhung Nguyen 《World Journal of Engineering and Technology》 2015年第4期311-319,共9页
Vietnam has become a major market for construction enterprises from East Asian countries, especially from China, to participate in international project contracting, but serious schedule delays have important adverse ... Vietnam has become a major market for construction enterprises from East Asian countries, especially from China, to participate in international project contracting, but serious schedule delays have important adverse effects on local government and foreign investment companies. Based on international engineering contracting mode of Vietnam highway BOT construction projects, we discussed the drive financial factors of schedule delays, using the methods of exploratory factor analysis and questionnaire survey, and evaluated the effects of various factors which are through regression analysis. The empirical results show that the five categories of financial factors, including the policy change, slow payment, financial mismanagement, financial market changes and lack of fiscal, have significant effects on schedule delay. Furtherly, we suggested that strengthening policy research and improving financial management ability should be used to reduce the influence of relevant financial factors on schedule delay, to improve the profitability of international businesses and the motivation of foreign enterprises to participate in Vietnam highway project. 展开更多
关键词 scheduling RISK management EXPLORATORY Analysis Project Delay FISCAL Factors RISK Evaluation
下载PDF
Program Evaluation and Review Technique (PERT) in Construction Schedule Risk Assessment 被引量:1
8
作者 Andrew Bates F.H.(Bud)Griffis 《中国城市经济》 2012年第3期246-249,共4页
Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for commun... Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for communication between the owner and the project manager.By developing the schedule before the project starts,the owner knows in advance that the expected timeline of the project.By preparing construction process scheduling,the owner and general contractor can better manage the subcontractors,sub-trades progress,materials storage and deliveries,labors schedule and equipment set up which will eventually save time,money and hassle.Basically,Critical Path Method(CPM) is commonly used in the construction industry.CPM is a deterministic method that assumes that through the network,there is at least one path that determines the project duration and that the path is the critical path.CPM does not consider the uncertainty in the activities;rather it assumes that each activity can be finished in the given situation.Program Evaluation and Review Technique(PERT) is a stochastic technique which is based on the assumption that the duration of a single activity can be described by a probability density function.PERT takes into account the uncertainty during the construction process and has been created out of the need to plan,schedule and control complex projects with many uncertainties.The PERT approach is stated in some books and papers,but there is no deep investigation on the application in the schedule risk assessment.This paper investigates the PERT work process and takes a valuable try on the construction schedule risk assessment by using case studies.The utilization in the estimate the construction liquidated damage with the uncertainties is performed,which also can be used in the insurance company to calculate the insurance premium. 展开更多
关键词 Construction management schedulING CPM PERT COST RISK Analysis
下载PDF
Management strategy of prevention and control of nosocomial infection of COVID-19 in blood purification center 被引量:1
9
作者 Mo SU Wan‑Ning JIA +3 位作者 Wen‑Wen HE Zhi‑Min CAI Hai-Yan WANG Liu YANG 《Journal of Integrative Nursing》 2020年第2期73-77,共5页
There are many patients in the blood purification center who need maintenance hemodialysis to maintain life. Those patients generally havelow resistance and are easily exposed to coronavirus because they go back and f... There are many patients in the blood purification center who need maintenance hemodialysis to maintain life. Those patients generally havelow resistance and are easily exposed to coronavirus because they go back and forth the hospital and residence three times a week andclosely contact with family, caregivers, community personnel, people in various means of transportation, medical staff, and other patientsvisiting hospital. Therefore, the blood purification center has become a high‑risk environment for the spread of COVID-19 infection. In viewof this, our center quickly responded to the formulation and implementation of infection prevention and control measures suitable for thecharacteristics of the blood purification center and continuous renal replacement therapy (CRRT) emergency plan for fever and suspectedpatients. According to these measures, we have a positive effect on preventing and controlling nosocomial infection in the blood purificationcenter. 展开更多
关键词 Blood purification center COVID-19 infection prevention and control management three-level screening
下载PDF
Operations Management Perspectives in the Air Transport Management 被引量:1
10
作者 Gulsah Hancerliogullari Koksalmis 《Journal of Business Administration Research》 2019年第1期1-14,共14页
The area of operations management has had a substantial effect on the today’s air transportation management.Having moved with huge demand from management to obtain a competitive advantage in the market,the airlines a... The area of operations management has had a substantial effect on the today’s air transportation management.Having moved with huge demand from management to obtain a competitive advantage in the market,the airlines are utilizing advanced optimization techniques to develop decision support systems for operations management and control.In order to provide a service with high quality and low cost,airlines spend a tremendous amount of resources and effort to generate profitable and cost-effective fare classes,flight schedules,fleet plans,aircraft routes,crew scheduling,gate assignment,etc.In this paper,the techniques and operations management applications that are used in the air transportation industry are reviewed including demand forecasting,fleet assignment,aircraft routing,crew scheduling,runway scheduling problem and gate assignment. 展开更多
关键词 Air transportation Operations management RUNWAY schedulING FLEET ASSIGNMENT CREW schedulING Aircraft routing Demand forecasting Gate ASSIGNMENT
下载PDF
Project Management and Coordination of Distributed Cooperative Product Design in a Virtual Enterprise 被引量:2
11
作者 CAOYan ZHANGYing-jie ZHAORu-fia 《International Journal of Plant Engineering and Management》 2004年第4期183-191,共9页
The architecture of project management of distributed concurrent product design in a virtual enterprise is put forward. T he process of project management and its functions are presented. Product design process coo... The architecture of project management of distributed concurrent product design in a virtual enterprise is put forward. T he process of project management and its functions are presented. Product design process coordination is also discussed. First, based on the analysis of traditi onal project management, project management and coordination of distributed coop erative product design in the virtual enterprise is put forward. Then, aiming at the characteristics of a distributed concurrent product design process, the inh erent rules and complex interrelations in product development are studied. Accor dingly, the architecture of project management of distributed cooperative produc t design in a virtual enterprise is presented to adapt to distributed concurrent development of complex products. The main advantages of the architecture are al so discussed. Finally, the emphasis is placed on the project management process. Its main functions are set forth, such as project definition, task decompositio n and distribution, resource constraints and dynamic resource scheduling, proces s fusion, task scheduling and monitoring, project plan, cost and quality evaluat ion, etc. 展开更多
关键词 virtual enterprise project management ar chitecture dynamic resource scheduling process fusion
下载PDF
Analyses on schedule-cost coefficient correlation of spaceflight project based on historical statistics and its application
12
作者 Liu Yanqiong Chen Yingwu 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2006年第4期769-774,共6页
When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, consider... When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, considering the effect of the cost, and proposes the estimation formula of the correlation coefficient between the in(schedule) and the cost. On the basis of the fact and Taylor expansion, the relation expression between the schedule-cost correlation coefficient and the in-schedule-cost correlation coefficient is put forward. By analyzing the value features of the estimation formula of the in-schedule-cost correlation coefficient, the general rules are proposed to ascertain the value of the schedule-cost correlation coefficient. An example is given to demonstrate how to approximately amend the schedule-cost correlation coefficient based on the historical statistics, which reveals the traditional assigned value is inaccurate. The universality of this estimation method is analyzed. 展开更多
关键词 cost schedule correlation coefficient spaceflight project management risk.
下载PDF
Real-time and dynamic schedule optimization of construction projects on the basis of lean construction 被引量:1
13
作者 祁神军 《Journal of Chongqing University》 CAS 2007年第3期177-186,共10页
Lean construction has been newly applied to construction industry. The best performance of a project can be achieved through the precise definition of construction product, rational work break structure, lean supply c... Lean construction has been newly applied to construction industry. The best performance of a project can be achieved through the precise definition of construction product, rational work break structure, lean supply chain, decrease of resources waste, objective control and so forth. Referring to the characteristics of schedule planning of construction projects and lean construction philosophy, we proposed optimizing methodology of real-time and dynamic schedule of construction projects based on lean construction. The basis of the methodology is process reorganization and lean supply in construction enterprises. The traditional estimating method of the activity duration is fuzzy and random;however, a newly proposed lean forecasting method employs multi-components linear-regression, back-propagation artificial neural networks and learning curve. Taking account of the limited resources and the fixed duration of a project, the optimizing method of the real-time and dynamic schedule adopts the concept of resource driving. To optimize the schedule of a construction project timely and effectively, an intellectualized schedule management system was developed. It can work out the initial schedule, optimize the real-time and dynamic schedule, and display the schedule with the Gant Chart, the net-work graph and the space-time line chart. A case study was also presented to explain the proposed method. 展开更多
关键词 建筑施工 时间计划 过程整编 结构优化
下载PDF
Optimization of project payment schedules with Nash equilibrium model and genetic algorithm 被引量:1
14
作者 DENG Ze-min GAO Chun-ping LI Zhong-xue 《Journal of Chongqing University》 CAS 2007年第2期107-112,共6页
To minimize the deviations of the net present values of project payment for both the owner and the client and optimize project payment schedules, a Nash equilibrium model based on game theory was set up and a genetic ... To minimize the deviations of the net present values of project payment for both the owner and the client and optimize project payment schedules, a Nash equilibrium model based on game theory was set up and a genetic algorithm was developed to work out the Nash equilibrium solution with a two-stage backward inductive approach that requires the client responds to the owner’s payment schedule with an activity schedule so as to maximize the client’s net present value of cash flows. A case study demonstrated that a payment schedule at the Nash equilibrium position enables both the owner and the client to gain their desirable interests, thus is a win-win solution for both parties. Despite the computation time of the proposed algrithm in need of improving, combining Nash equilibrium and genetic algorithm into a complete-information dynamic-game model is a promising method for project management optimization. 展开更多
关键词 遗传算法 支付计划 项目管理 计算方法
下载PDF
A Method to Solve PBL Issues and to Improve Project Management Competencies of Students
15
作者 Taketoshi Yokemura Masahiro Inoue 《Management Studies》 2018年第3期147-166,共20页
It is generally accepted that Project-Based Learning(PBL)is very valuable in preparing students to become working members of society.However,some issues have been recognized with PBL such as:(1)some students lack an a... It is generally accepted that Project-Based Learning(PBL)is very valuable in preparing students to become working members of society.However,some issues have been recognized with PBL such as:(1)some students lack an active attitude or ride on the coattails of their teammates in their PBL team work;(2)a range of achievement levels among project teams;(3)spending most of their time to discuss the objective and the goal;and(4)not well managed as a project.Integrated Scheduling Method(IScM)and the associated tool called Deliverables Dependency Matrix(DDM)have been proposed to create a highly feasible project schedule for a product development.It was noticed that they might have the potential to resolve these PBL issues because the schedule creation is a core part of project management and includes most of all factors to manage PBL as a project.Two trials of the application with Modified-IScM(M-IScM)and DDM to PBL courses have been conducted.The first trial was intended to evaluate if M-IScM and DDM could resolve the PBL issues.A lecture prior to the second PBL with some findings from the first trial was given to students to improve their project management competencies.As a result,it was confirmed that M-IScM and DDM had the potential to resolve the PBL issues and revealed that PBL had two internal project types,the Goal Search Project and the Goal Oriented Project with the associated work processes and methods.Furthermore,the Goal Oriented Project could be divided into the Development Project and the Value Creation Project.Understanding and utilizing these project types will improve the competencies of students regarding project management to produce a good outcome in PBL,and help develop the leadership and fundamental skills to be a capable business person. 展开更多
关键词 project management PROJECT-BASED learning work BREAKDOWN structure scheduling
下载PDF
Schedule Control of Coal Mine Construction Projects Based on Factor Analysis
16
作者 Lingling Fan Hui Zhang Xiao Li 《Geomaterials》 2013年第3期67-70,共4页
Schedule management is the crucial capability for large-scale coal mining investors to successful finish the construction project, which could get by the accumulation of the long-time institutional executive force and... Schedule management is the crucial capability for large-scale coal mining investors to successful finish the construction project, which could get by the accumulation of the long-time institutional executive force and ability training. By using factor analysis and validation analysis, extracted control factors of schedule management from data have been made in large coal mine construction companies. Some control factors have a greater influence on the schedule management which are the system factor, measures factor, economic controlling factor, behavioral factor, process factor, organization factor, thus the enterprise schedule management system should include the terms of the above factors. 展开更多
关键词 schedule management FACTOR FACTOR ANALYSIS Validity ANALYSIS
下载PDF
Research on logistics domain-oriented cloud resource management model and architecture 被引量:1
17
作者 张小东 Zhan Dechen Chu Dianhui 《High Technology Letters》 EI CAS 2017年第1期96-108,共13页
To address the challenges posed by resource shortage or surplus to enterprises productivity,Internet platforms have been widely used,which can balance shortage and surplus in broader environments. However,the existing... To address the challenges posed by resource shortage or surplus to enterprises productivity,Internet platforms have been widely used,which can balance shortage and surplus in broader environments. However,the existing resource management models lack openness,sharing ability and scalability,which make it difficult for many heterogeneous resources to co-exist in the same system. It is also difficult to resolve the conflicts between distributed self-management and centralized scheduling in the system. This paper analyzes the characteristics of resources in the distributed environment and proposes a new resource management architecture by considering the resource aggregation capacity of cloud computing. The architecture includes a universal resource scheduling optimization model which has been applied successfully in double-district multi-ship-scheduling multi-container-yard empty containers transporting of international shipping logistics. Applications in all these domains prove that this new resource management architecture is feasible and can achieve the expected effect. 展开更多
关键词 资源管理模型 管理体系结构 航运物流 分布式环境 资源调度 互联网平台 集装箱堆场 资源短缺
下载PDF
Multi-objective optimization in highway pavement maintenance and rehabilitation project selection and scheduling:A state-of-the-art review 被引量:1
18
作者 Mohammadhosein Pourgholamali Samuel Labi Kumares C.Sinha 《Journal of Road Engineering》 2023年第3期239-251,共13页
The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement co... The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers. 展开更多
关键词 Multi-objective optimization Highway pavement REHABILITATION Maintenance Project selection Project scheduling Decision mechanism Pavement management
下载PDF
Application of Project Management in Undergraduates' Innovation Experiment Teaching
19
作者 Qing Wang Huipeng Chen +2 位作者 Hongwei Liu Lei Xu Yanhang Zhang 《国际计算机前沿大会会议论文集》 2018年第2期47-47,共1页
关键词 PROJECT management PROJECT schedule managementInnovation EXPERIMENT TEACHING
下载PDF
Continuous query scheduler based on operators clustering
20
作者 M.Sami Soliman 谭冠政 《Journal of Central South University》 SCIE EI CAS 2011年第3期782-790,共9页
Data stream management system (DSMS) provides convenient solutions to the problem of processing continuous queries on data streams.Previous approaches for scheduling these queries and their operators assume that each ... Data stream management system (DSMS) provides convenient solutions to the problem of processing continuous queries on data streams.Previous approaches for scheduling these queries and their operators assume that each operator runs in separate thread or all operators combine in one query plan and run in a single thread.Both approaches suffer from severe drawbacks concerning the thread overhead and the stalls due to expensive operators.To overcome these drawbacks,a novel approach called clustered operators scheduling (COS) is proposed that adaptively clusters operators of the query plan into a number of groups based on their selectivity and computing cost using S-mean clustering.Experimental evaluation is provided to demonstrate the potential benefits of COS scheduling over the other scheduling strategies.COS can provide adaptive,flexible,reliable,scalable and robust design for continuous query processor. 展开更多
关键词 集群调度 连续查询 运营商 数据流管理系统 查询计划 查询处理器 DSMS 群体数量
下载PDF
上一页 1 2 146 下一页 到第
使用帮助 返回顶部