The transmission line tower will be affected by bad weather and artificial subsidence caused by the foundation and other factors in the power transmission.The tower’s tilt and severe deformation will cause the buildi...The transmission line tower will be affected by bad weather and artificial subsidence caused by the foundation and other factors in the power transmission.The tower’s tilt and severe deformation will cause the building to collapse.Many small changes caused the tower’s collapse,but the early staff often could not intuitively notice the changes in the tower’s state.In the current tower online monitoring system,terminal equipment often needs to replace batteries frequently due to premature exhaustion of power.According to the need for real-time measurement of power line tower,this research designed a real-time monitoring device monitoring the transmission tower attitude tilting and foundation state based on the inertial sensor,the acceleration of 3 axis inertial sensor and angular velocity raw data to pole average filtering pre-processing,and then through the complementary filtering algorithm for comprehensive calculation of tilt angle,the system meets the demand for inclined online monitoring of power line poles and towers regarding measurement accuracy,with low cost and power consumption.The optimization multi-sensor cooperative detection and correction measured tilt angle result relative accuracy can reach 1.03%,which has specific promotion and application value since the system has the advantages of unattended and efficient calculation.展开更多
Produced in power plants, electrical energy is transported to places of consumption via the electricity network. At the heart of this network are the supports that allow electricity to be efficiently transported over ...Produced in power plants, electrical energy is transported to places of consumption via the electricity network. At the heart of this network are the supports that allow electricity to be efficiently transported over long distances, guaranteeing the security and supply of energy to the various centers of use. In the construction of a line, supports occupy an important part in terms of safety and construction cost. It is therefore essential to optimize their use to reduce the cost of transmission lines. This work addresses this problem, which focuses on the optimal utilization of X-lattice towers in the construction of overhead power lines. The challenge is to reconcile the search for optimal cost and respect for the design, resistance and service constraints of the structure. To do this, a parameter having a strong correlation with the weight, foundation and construction cost of the X-lattice tower for 161 kV lines is determined as an important cost variable. This parameter is the wheelbase of the towers. The junction point between the structure and the foundations is obtained by measuring the forces at the base of the tower following the lowering of the loads. These efforts make it possible to size foundations which are of the inverted or isolated sole type. The results obtained reveal that from 8 meters in width, the wheelbase gradually changes until the optimum is obtained at 6.29 meters. With this wheelbase, the production cost is optimal. It clearly emerges from this study that the construction of lattice pylons with a wheelbase of approximately 6.29 meters makes it possible to optimize the cost of construction of 161 kV lines in the Republic of Benin.展开更多
After the construction of Qinghai-Tibet Highway and Railway, the Qinghai-Tibet Power Transmission(QTPT) line is another major permafrost engineering project with new types of engineering structures. The changing proce...After the construction of Qinghai-Tibet Highway and Railway, the Qinghai-Tibet Power Transmission(QTPT) line is another major permafrost engineering project with new types of engineering structures. The changing process and trend of ground temperature around tower foundations are crucial for the stability of QTPT. We analyzed the change characteristics and tendencies of the ground temperature based on field monitoring data from 2010 to 2014. The results reveal that soil around the tower foundations froze and connected with the artificial permafrost induced during the construction of footings after the first freezing period, and the soil below the original permafrost table kept freezing in subsequent thawing periods. The ground temperature lowered to that of natural fields, fast or slowly for tower foundations with thermosyphons,while for tower foundations without thermosyphons, the increase in ground temperature resulted in higher temperature than that of natural fields. Also, the permafrost temperature and ice content are significant factors that influence the ground temperature around tower foundations. Specifically, the ground temperature around tower foundations in warm and ice-rich permafrost regions decreased slowly, while that in cold and ice poor permafrost regions cooled faster. Moreover, foundations types impacted the ground temperature, which consisted of different technical processes during construction and variant of tower footing structures. The revealed changing process and trend of the ground temperature is beneficial for evaluating the thermal regime evolution around tower foundations in the context of climate change.展开更多
Given the background of a transmission tower erected on a particular mining subsidence area,we used finite element modeling to analyze the anti-deformation performance of transmission towers under a number of differen...Given the background of a transmission tower erected on a particular mining subsidence area,we used finite element modeling to analyze the anti-deformation performance of transmission towers under a number of different load conditions,including horizontal foundation displacement,uneven vertical downward displacement,wind loads and icing conditions.The results show that the failure in stability of a single steel angle iron represents the limit of the tower given ground deformation.We calculated the corresponding limits of foundation displacements.The results indicate that compression displacement of the foundation is more dangerous than tension displacement.Under complex foundation displacement conditions,horizontal foundation displacement is a key factor leading to failure in the stability of towers.Under conditions of compression or tension displacement of the foundation,wind load becomes the key factor.Towers do not fail when foundation displacements are smaller than 1% (under tension) or 0.5% (under horizontal compression or single foundation subsidence) of the distance between two supports.展开更多
The intact stability and damage stability of a model of an anemometer tower with buoyancy tank foundation are computed by the finite element software MOSES in this paper. The natural period of the anemometer tower is ...The intact stability and damage stability of a model of an anemometer tower with buoyancy tank foundation are computed by the finite element software MOSES in this paper. The natural period of the anemometer tower is discussed through frequency domain analysis. The influence of a single factor, such as towing point position, wave height, wave direction and wave period, on towing stability is discussed through time domain analysis. At the same time, the towing stability under the condition of various combinations of many factors is analyzed based on the measured data of the target area. Computer simulation results show that the intact stability is preferable and the damage stability is sufficient under the condition of plenty of subdivisions. Within the scope of the buoyancy tank foundation,the higher the towing point position is, the better the stability is. Wave height has a great impact on the motion amplitude of buoyancy tank foundation, but the effect on the acceleration is not obvious; wave period has a great impact on the acceleration, while the effect on the motion amplitude is not obvious; following-waves towing is more conducive to safety than atry.展开更多
泥石流是我国西南山区常见的地质灾害。架空输电杆塔在泥石流的冲击下往往发生基础破坏甚至会造成杆塔倒塌。首先采用光滑粒子流体动力学(smoothed particle hydrodynamics,简称SPH)方法和有限元方法(finite element method,简称FEM)相...泥石流是我国西南山区常见的地质灾害。架空输电杆塔在泥石流的冲击下往往发生基础破坏甚至会造成杆塔倒塌。首先采用光滑粒子流体动力学(smoothed particle hydrodynamics,简称SPH)方法和有限元方法(finite element method,简称FEM)相耦合的三维数值方法模拟了泥石流对杆塔基础的冲击作用;在与相关模型试验结果验证的基础上,开展了不同泥石流密度、黏度系数及初始速度条件下对输电塔基础的冲击力作用的参数分析;研究结果表明:随着泥石流初始速度的增加,冲击力峰值会随之增大;前排基础的冲击力峰值均大于后排基础;泥石流冲击过程特性受到泥石流密度和黏度系数影响。与稀性泥石流相比:黏性泥石流冲击基础后,基础下游真空区相对要小;此外,将数值模拟结果与Kwan冲击力公式及铁二院推荐的冲击压力设计公式预测值进行对比分析可以发现:Kwan冲击力公式能较好地预测出基础所受泥石流冲击力的平均趋势,最大预测误差低于30%,铁二院公式预测的稀性和黏性泥石流的冲击压力平均偏低分别约17%和28%。相关研究结果有望为泥石流频发区域输电塔基础的设计和风险评估提供一定的参考依据。展开更多
基金This work was supported by the National Natural Science Foundation of China(Nos.62172242,51901152)Industry University Cooperation Education Program of the Ministry of Education(No.2020021680113)Shanxi Scholarship Council of China.
文摘The transmission line tower will be affected by bad weather and artificial subsidence caused by the foundation and other factors in the power transmission.The tower’s tilt and severe deformation will cause the building to collapse.Many small changes caused the tower’s collapse,but the early staff often could not intuitively notice the changes in the tower’s state.In the current tower online monitoring system,terminal equipment often needs to replace batteries frequently due to premature exhaustion of power.According to the need for real-time measurement of power line tower,this research designed a real-time monitoring device monitoring the transmission tower attitude tilting and foundation state based on the inertial sensor,the acceleration of 3 axis inertial sensor and angular velocity raw data to pole average filtering pre-processing,and then through the complementary filtering algorithm for comprehensive calculation of tilt angle,the system meets the demand for inclined online monitoring of power line poles and towers regarding measurement accuracy,with low cost and power consumption.The optimization multi-sensor cooperative detection and correction measured tilt angle result relative accuracy can reach 1.03%,which has specific promotion and application value since the system has the advantages of unattended and efficient calculation.
文摘Produced in power plants, electrical energy is transported to places of consumption via the electricity network. At the heart of this network are the supports that allow electricity to be efficiently transported over long distances, guaranteeing the security and supply of energy to the various centers of use. In the construction of a line, supports occupy an important part in terms of safety and construction cost. It is therefore essential to optimize their use to reduce the cost of transmission lines. This work addresses this problem, which focuses on the optimal utilization of X-lattice towers in the construction of overhead power lines. The challenge is to reconcile the search for optimal cost and respect for the design, resistance and service constraints of the structure. To do this, a parameter having a strong correlation with the weight, foundation and construction cost of the X-lattice tower for 161 kV lines is determined as an important cost variable. This parameter is the wheelbase of the towers. The junction point between the structure and the foundations is obtained by measuring the forces at the base of the tower following the lowering of the loads. These efforts make it possible to size foundations which are of the inverted or isolated sole type. The results obtained reveal that from 8 meters in width, the wheelbase gradually changes until the optimum is obtained at 6.29 meters. With this wheelbase, the production cost is optimal. It clearly emerges from this study that the construction of lattice pylons with a wheelbase of approximately 6.29 meters makes it possible to optimize the cost of construction of 161 kV lines in the Republic of Benin.
基金supported by National Natural Science Fund of China (Grant No. 41401088)State Grid Qinghai Electric Power Research Institute (SGQHDKYOSBJS201600077, SGQHDKYOSBJS 1700068)Funds of State Key Laboratory of Frozen Soil Engineering (Nos. SKLFSE-ZY-17, SKLFSEZT-32)
文摘After the construction of Qinghai-Tibet Highway and Railway, the Qinghai-Tibet Power Transmission(QTPT) line is another major permafrost engineering project with new types of engineering structures. The changing process and trend of ground temperature around tower foundations are crucial for the stability of QTPT. We analyzed the change characteristics and tendencies of the ground temperature based on field monitoring data from 2010 to 2014. The results reveal that soil around the tower foundations froze and connected with the artificial permafrost induced during the construction of footings after the first freezing period, and the soil below the original permafrost table kept freezing in subsequent thawing periods. The ground temperature lowered to that of natural fields, fast or slowly for tower foundations with thermosyphons,while for tower foundations without thermosyphons, the increase in ground temperature resulted in higher temperature than that of natural fields. Also, the permafrost temperature and ice content are significant factors that influence the ground temperature around tower foundations. Specifically, the ground temperature around tower foundations in warm and ice-rich permafrost regions decreased slowly, while that in cold and ice poor permafrost regions cooled faster. Moreover, foundations types impacted the ground temperature, which consisted of different technical processes during construction and variant of tower footing structures. The revealed changing process and trend of the ground temperature is beneficial for evaluating the thermal regime evolution around tower foundations in the context of climate change.
基金National Natural Science Foundation of China(No.50004008)Xuzhou Power Supply Company and the Fundamental Research Funds for the Central Universities(No.2011QNB18) for their financial and technical support for this work
文摘Given the background of a transmission tower erected on a particular mining subsidence area,we used finite element modeling to analyze the anti-deformation performance of transmission towers under a number of different load conditions,including horizontal foundation displacement,uneven vertical downward displacement,wind loads and icing conditions.The results show that the failure in stability of a single steel angle iron represents the limit of the tower given ground deformation.We calculated the corresponding limits of foundation displacements.The results indicate that compression displacement of the foundation is more dangerous than tension displacement.Under complex foundation displacement conditions,horizontal foundation displacement is a key factor leading to failure in the stability of towers.Under conditions of compression or tension displacement of the foundation,wind load becomes the key factor.Towers do not fail when foundation displacements are smaller than 1% (under tension) or 0.5% (under horizontal compression or single foundation subsidence) of the distance between two supports.
基金Supported by the National High Technology Research and Development Program of China("863"Program,No.2012AA051705)International Science and Technology Cooperation Program of China(No.2012DFA70490)+1 种基金National Natural Science Foundation of China(No.51109160)Tianjin Natural Science Foundation(No.13JCYBJC19100)
文摘The intact stability and damage stability of a model of an anemometer tower with buoyancy tank foundation are computed by the finite element software MOSES in this paper. The natural period of the anemometer tower is discussed through frequency domain analysis. The influence of a single factor, such as towing point position, wave height, wave direction and wave period, on towing stability is discussed through time domain analysis. At the same time, the towing stability under the condition of various combinations of many factors is analyzed based on the measured data of the target area. Computer simulation results show that the intact stability is preferable and the damage stability is sufficient under the condition of plenty of subdivisions. Within the scope of the buoyancy tank foundation,the higher the towing point position is, the better the stability is. Wave height has a great impact on the motion amplitude of buoyancy tank foundation, but the effect on the acceleration is not obvious; wave period has a great impact on the acceleration, while the effect on the motion amplitude is not obvious; following-waves towing is more conducive to safety than atry.
文摘预制构件连接方法及其界面剪切性能影响整个输电铁塔装配式基础的受力和变形.针对螺栓连接易松动、变形大之类的问题,提出采用高强灌浆料灌注成形的十字形抗剪键作为输电铁塔装配式基础连接方案.采用室内剪切试验和数值模拟,研究该抗剪键连接的剪切性能,并与常用的螺栓连接进行对比分析.结果表明:十字形抗剪键剪切破坏模式为剪断型脆性破坏,破坏形态表现为以抗剪键为中心向外略有扩展成菱形.和螺栓连接相比,抗剪键连接的剪切强度略低,但剪切刚度显著提高.浇筑过程中灌浆料外溢对界面抗剪强度有提高作用.抗剪键的抗剪性能与灌浆料强度正相关,但提高灌浆料强度对抗剪性能提升并不明显.抗剪键深度对抗剪性能有影响,但在抗剪键深度超过20 mm后,抗剪键的抗剪性能不再提高.根据剪切试验和数值模拟结果,建议十字形抗剪键设计为长200 mm、宽20 mm、深20 mm.
文摘泥石流是我国西南山区常见的地质灾害。架空输电杆塔在泥石流的冲击下往往发生基础破坏甚至会造成杆塔倒塌。首先采用光滑粒子流体动力学(smoothed particle hydrodynamics,简称SPH)方法和有限元方法(finite element method,简称FEM)相耦合的三维数值方法模拟了泥石流对杆塔基础的冲击作用;在与相关模型试验结果验证的基础上,开展了不同泥石流密度、黏度系数及初始速度条件下对输电塔基础的冲击力作用的参数分析;研究结果表明:随着泥石流初始速度的增加,冲击力峰值会随之增大;前排基础的冲击力峰值均大于后排基础;泥石流冲击过程特性受到泥石流密度和黏度系数影响。与稀性泥石流相比:黏性泥石流冲击基础后,基础下游真空区相对要小;此外,将数值模拟结果与Kwan冲击力公式及铁二院推荐的冲击压力设计公式预测值进行对比分析可以发现:Kwan冲击力公式能较好地预测出基础所受泥石流冲击力的平均趋势,最大预测误差低于30%,铁二院公式预测的稀性和黏性泥石流的冲击压力平均偏低分别约17%和28%。相关研究结果有望为泥石流频发区域输电塔基础的设计和风险评估提供一定的参考依据。