With the growth of capacity of high voltage direct current(HVDC) transmission lines,the ratings of thyristor valves,which are one of the most critical equipments,are getting higher and higher.Verification of performan...With the growth of capacity of high voltage direct current(HVDC) transmission lines,the ratings of thyristor valves,which are one of the most critical equipments,are getting higher and higher.Verification of performance of thyristor valves particularly designed for HVDC project plays an important role in the handover of products between the manufacturer and the client.Conventional test facilities based on philosophy of direct test cannot meet the requirements for modern thyristor valves.New test facilities with high ratings are necessarily built based on philosophy of synthetic test.Over the conventional direct test circuit,the later is an economical and feasible solution with less financial investment and higher test capability.However,the equivalency between the synthetic test and the direct test should be analyzed technically in order to make sure that the condition of verification test in a synthetic test circuit should satisfy the actual operation condition of thyristor valves existing in a real HVDC project,just as in a direct test circuit.Equivalency analysis is focused in this paper,covering the scope of thyristor valves' steady state,and transient state.On the basis of the results achieved,a synthetic test circuit of 6 500 A/50 kV for operational tests of thyristor valves used for up to UHVDC project has newly been set up and already put into service in Xi'an High Voltage Apparatus Research Institute Co.,Ltd.(XIHARI),China.Some of the results have been adopted also by a new national standard of China.展开更多
通过直流断路器切除故障是柔性直流电网中最具前景的故障隔离方法。目前,主断支路串联大量全控型电力电子器件的传统混合式直流断路器存在成本高、技术难度大等问题。文中提出一种基于晶闸管的电容换相式混合直流断路器(Thyristor Based...通过直流断路器切除故障是柔性直流电网中最具前景的故障隔离方法。目前,主断支路串联大量全控型电力电子器件的传统混合式直流断路器存在成本高、技术难度大等问题。文中提出一种基于晶闸管的电容换相式混合直流断路器(Thyristor Based Capacitor Commutation Hybrid DC Circuit Breaker, TCC-HDCCB)拓扑。该断路器通过晶闸管和电容配合完成双向故障换流、断流和自适应重合闸功能且利用直流系统本身对换相电容进行预充电,大大降低了造价和控制难度。文中首先介绍了TCC-HDCCB的拓扑结构、工作原理;然后给出了关键器件参数选取方法;最后在PSCAD/EMTDC4.5软件平台中搭建TCC-HDCCB仿真模型,在单端和四端柔性直流电网中进行仿真验证,并从性能以及经济性与有关方案进行对比分析,验证方案的可行性。展开更多
Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their oper...Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their operational performance to satisfy the technical specification of project related.Test facilities for operational tests of thyristor valves are supposed to enable to undertake more severe electrical stresses than those being applied in the thyristor valves under test(test objects).On the other hand,the stresses applied into the test objects are neither higher nor lower than specified by the specification,because inappropriate stresses applied would result in incorrect evaluation of performance on the test objects,more seriously,would cuase the damage of test objects with expensive cost losing.Generally,the process of operational tests is complicated and performed in a complex synthetic test circuit(hereafter as STC),where there are a lot of sensors used for measuring,monitoring and protection on line to ensure that the test circuit functions in good condition.Therefore,the measuring systems embedded play a core role in STC,acting like "eyes".Based on the first project of building up a STC in China,experience of planning measuring systems is summarized so as to be referenced by related engineers.展开更多
基金Project Supported by National Development and Reform Commission(No.[2006]2709)
文摘With the growth of capacity of high voltage direct current(HVDC) transmission lines,the ratings of thyristor valves,which are one of the most critical equipments,are getting higher and higher.Verification of performance of thyristor valves particularly designed for HVDC project plays an important role in the handover of products between the manufacturer and the client.Conventional test facilities based on philosophy of direct test cannot meet the requirements for modern thyristor valves.New test facilities with high ratings are necessarily built based on philosophy of synthetic test.Over the conventional direct test circuit,the later is an economical and feasible solution with less financial investment and higher test capability.However,the equivalency between the synthetic test and the direct test should be analyzed technically in order to make sure that the condition of verification test in a synthetic test circuit should satisfy the actual operation condition of thyristor valves existing in a real HVDC project,just as in a direct test circuit.Equivalency analysis is focused in this paper,covering the scope of thyristor valves' steady state,and transient state.On the basis of the results achieved,a synthetic test circuit of 6 500 A/50 kV for operational tests of thyristor valves used for up to UHVDC project has newly been set up and already put into service in Xi'an High Voltage Apparatus Research Institute Co.,Ltd.(XIHARI),China.Some of the results have been adopted also by a new national standard of China.
文摘通过直流断路器切除故障是柔性直流电网中最具前景的故障隔离方法。目前,主断支路串联大量全控型电力电子器件的传统混合式直流断路器存在成本高、技术难度大等问题。文中提出一种基于晶闸管的电容换相式混合直流断路器(Thyristor Based Capacitor Commutation Hybrid DC Circuit Breaker, TCC-HDCCB)拓扑。该断路器通过晶闸管和电容配合完成双向故障换流、断流和自适应重合闸功能且利用直流系统本身对换相电容进行预充电,大大降低了造价和控制难度。文中首先介绍了TCC-HDCCB的拓扑结构、工作原理;然后给出了关键器件参数选取方法;最后在PSCAD/EMTDC4.5软件平台中搭建TCC-HDCCB仿真模型,在单端和四端柔性直流电网中进行仿真验证,并从性能以及经济性与有关方案进行对比分析,验证方案的可行性。
基金Project Supported by National Development and Reform Commission(No.[2006]2709)
文摘Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their operational performance to satisfy the technical specification of project related.Test facilities for operational tests of thyristor valves are supposed to enable to undertake more severe electrical stresses than those being applied in the thyristor valves under test(test objects).On the other hand,the stresses applied into the test objects are neither higher nor lower than specified by the specification,because inappropriate stresses applied would result in incorrect evaluation of performance on the test objects,more seriously,would cuase the damage of test objects with expensive cost losing.Generally,the process of operational tests is complicated and performed in a complex synthetic test circuit(hereafter as STC),where there are a lot of sensors used for measuring,monitoring and protection on line to ensure that the test circuit functions in good condition.Therefore,the measuring systems embedded play a core role in STC,acting like "eyes".Based on the first project of building up a STC in China,experience of planning measuring systems is summarized so as to be referenced by related engineers.