期刊文献+
共找到17,191篇文章
< 1 2 250 >
每页显示 20 50 100
Lunar In Situ Large-Scale Construction:Quantitative Evaluation of Regolith Solidification Techniques
1
作者 Charun Bao Daobo Zhang +2 位作者 Qinyu Wang Yifei Cui Peng Feng 《Engineering》 SCIE EI CAS CSCD 2024年第8期204-221,共18页
Lunar habitat construction is crucial for successful lunar exploration missions.Due to the limitations of transportation conditions,extensive global research has been conducted on lunar in situ material processing tec... Lunar habitat construction is crucial for successful lunar exploration missions.Due to the limitations of transportation conditions,extensive global research has been conducted on lunar in situ material processing techniques in recent years.The aim of this paper is to provide a comprehensive review,precise classification,and quantitative evaluation of these approaches,focusing specifically on four main approaches:reaction solidification(RS),sintering/melting(SM),bonding solidification(BS),and confinement formation(CF).Eight key indicators have been identified for the construction of low-cost and highperformance systems to assess the feasibility of these methods:in situ material ratio,curing temperature,curing time,implementation conditions,compressive strength,tensile strength,curing dimensions,and environmental adaptability.The scoring thresholds are determined by comparing the construction requirements with the actual capabilities.Among the evaluated methods,regolith bagging has emerged as a promising option due to its high in situ material ratio,low time requirement,lack of hightemperature requirements,and minimal shortcomings,with only the compressive strength falling below the neutral score.The compressive strength still maintains a value of 2–3 MPa.The proposed construction scheme utilizing regolith bags offers numerous advantages,including rapid and large-scale construction,ensured tensile strength,and reduced reliance on equipment and energy.In this study,guidelines for evaluating regolith solidification techniques are provided,and directions for improvement are offered.The proposed lunar habitat design based on regolith bags is a practical reference for future research. 展开更多
关键词 Lunar habitats Lunar in situ construction Regolith bag Solidification and formation In situ materials Evaluation method
下载PDF
Construction Method for Performance Management Curriculum Content System Based on Knowledge Graph
2
作者 Miaomiao Ma Xia Mu 《教育研究前沿(中英文版)》 2024年第3期8-12,共5页
Performance Management is the core course of human resource management major,but its knowledge points lack multi-dimensional correlations.There are problems such as scattered content and unclear system,and it is urgen... Performance Management is the core course of human resource management major,but its knowledge points lack multi-dimensional correlations.There are problems such as scattered content and unclear system,and it is urgent to reconstruct the content system of the course.Knowledge graph technology can integrate massive and scattered information into an organic structure through semantic correlation and reasoning.The application of knowledge graph to education and teaching can promote scientific and personalized teaching evaluation and better realize individualized teaching.This paper systematically combs the knowledge points of Performance Management course and forms a comprehensive knowledge graph.The knowledge point is associated with specific questions to form the problem map of the course,and then the knowledge point is further associated with the ability target to form the ability map of the course.Then,the knowledge point is associated with teaching materials,question bank and expansion resources to form a systematic teaching database,thereby giving the method of building the content system of Performance Management course based on the knowledge map.This research can be further extended to other core management courses to realize the deep integration of knowledge graph and teaching. 展开更多
关键词 Knowledge Graph construction method Curriculum Content System Performance Management Course
下载PDF
A Discussion on Innovative Methods for Green Engineering Management in Construction Engineering
3
作者 Jing Gu 《Journal of Architectural Research and Development》 2024年第6期92-97,共6页
With the rapid development of society,the construction industry has made significant progress.However,as environmental issues intensify,many construction projects contribute to pollution.In this context,applying green... With the rapid development of society,the construction industry has made significant progress.However,as environmental issues intensify,many construction projects contribute to pollution.In this context,applying green project management methods in construction can enhance energy conservation and environmental protection,reduce energy consumption and costs,and minimize environmental damage,promoting balanced development between the environment and the economy.Therefore,integrating green construction concepts into current construction projects is essential.Based on project requirements and construction activities,effective green project management strategies should be developed to improve management standards and promote more efficient green construction.This paper analyzes green project management in construction engineering and offers recommendations for reference. 展开更多
关键词 construction engineering Green engineering management Management methods
下载PDF
Friction Characteristics Between Marine Clay and Construction Materials
4
作者 KOU Hailei HUANG Jiaming CHENG Yang 《Journal of Ocean University of China》 CAS CSCD 2024年第2期427-437,共11页
Structure-soil interface friction characteristics is of importance to investigate the interaction between engineering structures and soils,especially for offshore structures.The interface friction behavior between mar... Structure-soil interface friction characteristics is of importance to investigate the interaction between engineering structures and soils,especially for offshore structures.The interface friction behavior between marine clay and structural materials with different roughness was studied in this paper by using 3D optical scanning tests,a modified direct shear device and numerical simulation.Relationships between the surface roughness of structures,water content and interface friction angle were presented by model tests.The increase of water contents decreased the interface friction angles.For interfaces with different roughness,the interface friction angles will be smaller than that of the soil when the water content exceeds a certain value.The roughness of the interface and the water content of the soil are mutually coupled to influence the coefficient of friction(COF).This paper proposed a Finite Element Method(FEM)to simulate the interface direct shear tests of structures with different roughness.The surface models with different roughness are established based on the structure data obtained by 3D scanning.The Coupled Eulerian-Lagrangian(CEL)approach was employed to analyse soils sheared by irregular surfaces.The interface behavior for interfaces with different roughness under cyclic shear stresses was analyzed by FEM. 展开更多
关键词 marine clay construction material interface friction behavior surface roughness Finite Element method
下载PDF
Study on the Impact of Collective Commercial Construction Land Entering the Market on Rural Residents’Income:Taking Deqing County,Zhejiang Province as an Example
5
作者 Panpan He Haolong Zhao 《Proceedings of Business and Economic Studies》 2024年第4期53-59,共7页
The entry of collective construction land for business purposes is an important measure for deepening the reform of the rural land system,promoting the flow of urban and rural factors,and realizing rural revitalizatio... The entry of collective construction land for business purposes is an important measure for deepening the reform of the rural land system,promoting the flow of urban and rural factors,and realizing rural revitalization.Since the production of the first batch of pilot projects in 2015,33 county-level cities have participated in the pilot policy by 2023.Deqing County,Zhejiang Province,as the first area to participate in the pilot project,aims to achieve more fruitful results.This paper first examines how promoting farmers’income through the market entry of agricultural land can be achieved,then uses the synthetic control method to quantitatively study the impact of collective operational construction land on farmers’income using panel data from 2011 to 2019,and finally proposes relevant suggestions from the perspective of system reform. 展开更多
关键词 Collective operational construction land into the market Farmers’income Synthetic control method
下载PDF
Guideline of Test Suite Construction for GUI Software Centered on Grey-Box Approach
6
作者 Mengqing TanLi Jiyi Xiao Ying Zhang 《Journal of Software Engineering and Applications》 2023年第5期113-143,共31页
In this paper, the test suite construction for GUI (Graphical User Interface) software may be executed centered on grey-box approach with the prior test design of window access controls for unit testing, including fro... In this paper, the test suite construction for GUI (Graphical User Interface) software may be executed centered on grey-box approach with the prior test design of window access controls for unit testing, including front-end method of white box and follow-up black box method for integration testing. Moreover, two key opinions are proposed for the test suite construction for GUI software, the first one is that the “Triple-step method” should be used for unit testing with the prior disposing of data boundary value testing of input controls, and another one is that the “Grey-box approach” should be applied in integration testing for GUI software with necessary testing preparation in the precondition. At the same time, the testing of baseline version and the incremental testing should be considered for the test case construction to coordinate with the whole evolution of software product today. Additionally, all our opinion and thought are verified and tested with a typical case of GUI software—PQMS (Product Quality Monitoring Software/System), and results indicate that these methods and specific disposing are practical and effective. 展开更多
关键词 Test Suite construction GUI Software Triple-Step method Grey-Box Approach GUIDELINE
下载PDF
Responses of bacterial community to potential heap construction methods of fine-grained copper tailings in column bioleaching system 被引量:2
7
作者 Xiao-dong HAO Xue-duan LIU +8 位作者 Ping ZHU Yi-li LIANG Guan-zhou QIU Hong-qing MA Yan LIU Qian-jin LIU Li-ying REN Emmanuel Konadu SARKODIE Hong-wei LIU 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2021年第6期1796-1805,共10页
The column bioleaching of copper flotation tailings was comparatively investigated using layered heap construction method(LM),agglomerate heap construction method(AM),and pellets-sintering heap construction method(PM)... The column bioleaching of copper flotation tailings was comparatively investigated using layered heap construction method(LM),agglomerate heap construction method(AM),and pellets-sintering heap construction method(PM).The bacterial communities of free,attached,weakly-attached,and strongly-attached microbes in the later bioleaching stage were investigated.In AM group,the addition of lump sulphide ore resulted in the low leachate pH,high ferric iron concentration,and rapid microbial adsorption,which obtained the maximum copper extraction(60.1%)compared with LM(54.6%)and PM(43.9%)groups.The relative abundance of dominant genera and microbial communities of different microbiota underwent changes in three heap construction methods.The alpha-diversity indexes of attached,weakly-attached,and strongly-attached microbes were different,while no significant change was observed in free bacteria.The variation of whole bacterial community was significantly associated with solution pH,total iron,and ferric iron concentrations.Pearson correlation analysis and partial least square path model both indicated that attached bacteria made larger contribution to the copper extraction of tailings. 展开更多
关键词 fine-grained tailings column bioleaching heap construction method free and attached bacteria microbial diversity
下载PDF
Construction of n-sided polygonal spline element using area coordinates and B-net method 被引量:4
8
作者 Juan Chen Chong-Jun Li Wan-Ji Chen 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2010年第5期685-693,共9页
In general, triangular and quadrilateral elements are commonly applied in two-dimensional finite element methods. If they are used to compute polycrystalline materials, the cost of computation can be quite significant... In general, triangular and quadrilateral elements are commonly applied in two-dimensional finite element methods. If they are used to compute polycrystalline materials, the cost of computation can be quite significant. Polygonal elements can do well in simulation of the materials behavior and provide greater flexibility for the meshing of complex geometries. Hence, the study on the polygonal element is a very useful and necessary part in the finite element method. In this paper, an n-sided polygonal element based on quadratic spline interpolant, denoted by PS2 element, is presented using the triangular area coordinates and the B-net method. The PS2 element is conforming and can exactly model the quadratic field. It is valid for both convex and non-convex polygonal element, and insensitive to mesh distortions. In addition, no mapping or coordinate transformation is required and thus no Jacobian matrix and its inverse are evaluated. Some appropriate examples are employed to evaluate the performance of the proposed element. 展开更多
关键词 Finite element method n-sided polygonalelement - Bivariate spline interpolation The second ordercompleteness
下载PDF
The Study of Force and the Mechanical Characteristic of Incremental Launching Construction Method on a Steel-Concrete Continuous Beam Bridge 被引量:2
9
作者 Xu Luo 《Journal of Architectural Research and Development》 2019年第6期46-50,共5页
The usage of steel-mixed composite beams is quite extensive today.During an event of constructing steel-mixed composite bridges,the incremental launching construction method is generally adopted.This paper mainly anal... The usage of steel-mixed composite beams is quite extensive today.During an event of constructing steel-mixed composite bridges,the incremental launching construction method is generally adopted.This paper mainly analyzes the force of incremental launching construction on a steel-concrete continuous beam bridge,the classification of incremental launching construction,the application of incremental launching construction in steel-mixed composite beams,the temporary facilities existing in incremental launching construction as well as their existing problems.Lastly,the analysis of the stress of composite beams in incremental launching construction is described by using the reference for the construction of mixed composite continuous beam bridges provided. 展开更多
关键词 STEEL-CONCRETE Composite BEAM INCREMENTAL LAUNCHING construction method Force DISPLACEMENT
下载PDF
Optimization of construction machinery scheme of cast-in-situ concrete based on the improved scatter degree method
10
作者 阎西康 丛林 《Journal of Chongqing University》 CAS 2015年第4期127-133,共7页
The basic requirement of mechanical construction of cast-in-situ concrete is that it could not only conduct quality qualification and safety production, but also achieve most economic benefits with less investment und... The basic requirement of mechanical construction of cast-in-situ concrete is that it could not only conduct quality qualification and safety production, but also achieve most economic benefits with less investment under the condition to meet the needs of project duration. Therefore, the selection of construction machinery scheme plays an important role. However, in the actual construction, it is usually that operators rely on their own experience and field conditions to determine the mechanics. Such a method is subjective and arbitrary, and it is not conducive to make the construction rationally. Considering the above reasons, an improved weight coefficient method was used to establish an estimation model to estimate the construction machinery scheme of cast-in-situ concrete, so as to make the procedure much rational. 展开更多
关键词 mechanical construction CAST-IN-SITU CONCRETE improved SCATTER DEGREE method
下载PDF
A Review of Deepwater Pipeline Construction in the U.S. Gulf of Mexico-Contracts, Cost, and Installation Methods
11
作者 Mark J. Kaiser 《Journal of Marine Science and Application》 CSCD 2016年第3期288-306,共19页
The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation m... The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi. 展开更多
关键词 construction cost contract type empirical statistics installation methods deepwater pipeline review
下载PDF
Structural mechanism and construction method of mud and water inrush in Xiangyun tunnel of Guangtong-Dali railway
12
作者 WANG Yawei 《Global Geology》 2019年第3期167-178,共12页
Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surroun... Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surrounding rock and damage forms of the tunnel in the studied area, the author analyzed the geological and structural characteristics of mud and water inrush in tunnel and obtained their construction type. Meanwhile, the advanced water detection under the complex geological conditions was studied by using induced polarization method, transient electromagnetic method and three-dimensional seismic method, it can be concluded that the water-rich fracture zone exists within the detection range with a risk of large mud and water inrush disaster. The concrete construction treatment measures are put forward:①cement-water glass binary slurry is selected as the material for ground and hole grouting, its advantage is that the gel time can be controlled, and it has certain grout ability in the strata with large permeability coeffcient, which is conducive to excavate construction immediately after grouting.②applying the mature retrograde grouting construction can reduce grouting time and improve the excavation efficiency. 展开更多
关键词 MUD and water inrush geological model Xiangyun TUNNEL Guangtong-Dali RAILWAY STRUCTURAL mechanism construction method
下载PDF
Progress billing method of accounting for long-term construction contracts
13
作者 Mathew Alappatt Junaid M. Sheikh Anbalagan Krishnan 《Journal of Modern Accounting and Auditing》 2010年第11期41-47,共7页
This article questions the reliability of the amount of revenue recognized in the percentage of completion (POC) method of revenue recognition in construction industry and recommends a new method based on the progre... This article questions the reliability of the amount of revenue recognized in the percentage of completion (POC) method of revenue recognition in construction industry and recommends a new method based on the progress billing which is more reliable. The most commonly used method of revenue recognition in the construction industry is the percentage of completion method (POC), where the revenue is recognized on the basis of the percentage of work completed. The calculation of percentage of work completed is made on the basis of the cost incurred for the contract work during the financial period and the cost required for completion of the work as estimated by the contractor. Here, the acceptance of the product by the buyer (contractee) is not involved in recognizing the revenue. The reliability of the amount of revenue and its collectability can be assured only when the buyer accepts the product. The approval of the progress bill by the contractee is needed to assure the reliability and collectability and it must be the event that triggers the recognition of revenue. 展开更多
关键词 long-term construction contracts completed contract method percentage of completion method and progress bill
下载PDF
Joint 3D traveltime calculation based on fast marching method and wavefront construction 被引量:5
14
作者 孙辉 孙建国 +5 位作者 孙章庆 韩复兴 刘明忱 刘志强 高正辉 石秀林 《Applied Geophysics》 SCIE CSCD 2017年第1期56-63,189,共9页
3D traveltime calculation is widely used in seismic exploration technologies such as seismic migration and tomography. The fast marching method (FMM) is useful for calculating 3D traveltime and has proven to be effi... 3D traveltime calculation is widely used in seismic exploration technologies such as seismic migration and tomography. The fast marching method (FMM) is useful for calculating 3D traveltime and has proven to be efficient and stable. However, it has low calculation accuracy near the source, which thus gives it low overall accuracy. This paper proposes a joint traveltime calculation method to solve this problem. The method firstly employs the wavefront construction method (WFC), which has a higher calculation accuracy than FMM in calculating traveltime in the small area near the source, and secondly adopts FMM to calculate traveltime for the remaining grid nodes. Due to the increase in calculation precision of grid nodes near the source, this new algorithm is shown to have good calculation precision while maintaining the high calculation efficiency of FMM, which is employed in most of the computational area. Results are verified using various numerical models. 展开更多
关键词 Seismic wave propagation 3D traveltime computation fast marching method wavefront construction method
下载PDF
A Reflection on the Reform of Education Methods Under the Construction of a High-Quality Elementary Education System
15
作者 Shuyu Yang 《Journal of Contemporary Educational Research》 2022年第6期66-70,共5页
Under the background of the continuous improvement of the education level in China and the comprehensive and in-depth education reform,the society has been paying more attention to education.Focusing on the reform of ... Under the background of the continuous improvement of the education level in China and the comprehensive and in-depth education reform,the society has been paying more attention to education.Focusing on the reform of education methods is not only essential to promoting the high-quality development of China’s education,but also the inevitable prerequisite for establishing a high-quality education system.It is an effective way to build an educated country,and the guide to which directs the implementation of modern education.Therefore,this study takes the construction of a high-quality elementary education system as the background and considers effective strategies for the reform of education methods,so as to lay a solid foundation for improving China’s education level. 展开更多
关键词 High-quality education Elementary education System construction Education methods Education reform
下载PDF
地方大学数学类一流课程建设与实践--以临沂大学数学分析课程为例 被引量:1
16
作者 石少广 傅尊伟 +2 位作者 郭政 吴艳 吴越 《高教学刊》 2024年第1期8-12,共5页
课程是人才培养的核心要素,课程质量直接决定人才培养质量。数学类课程是大学理工科人才培养的重要支撑,对学生后续学习和发展后劲影响重大,受益面广。该文以临沂大学数学类专业学科基础课程数学分析为例,构建“厚学科基础,强化师资队... 课程是人才培养的核心要素,课程质量直接决定人才培养质量。数学类课程是大学理工科人才培养的重要支撑,对学生后续学习和发展后劲影响重大,受益面广。该文以临沂大学数学类专业学科基础课程数学分析为例,构建“厚学科基础,强化师资队伍、强化课程思政,优化教学设计、优化教学方法、优化教学考核”的地方大学数学类一流课程建设实践,将师资队伍建设、一流课程建设和教学改革研究紧密结合,在教学质量工程和人才培养等方面取得很好的成效。数学分析课程被教育部认定为首批国家一流课程,建设经验可为数学类专业后继课程和理工科专业高等数学类课程提供重要参考。 展开更多
关键词 一流课程 数学分析 高等数学 课程建设 实施方法
下载PDF
A working model of the Internet-based steel construction consulting system for architects
17
作者 周琦 《Journal of Southeast University(English Edition)》 EI CAS 2003年第4期336-342,共7页
As Internet becomes largely used in the AEC (architecture, engineering andconstruction) industry, the main focus is in the area of information and project management. In thedynamic engineering consulting, less has bee... As Internet becomes largely used in the AEC (architecture, engineering andconstruction) industry, the main focus is in the area of information and project management. In thedynamic engineering consulting, less has been done so far. This research tries to find thepossibility and potential of the Internet application in design and consulting for the AEC industryby proposing a working model in specific area, steel construction. Several issues have beendiscussed: defining and formatting the typical procedure and character of the steel constructionconsulting, behavior approach based on activities among partners, and the model organization. 展开更多
关键词 steel construction consulting behavior approach object-oriented methods
下载PDF
基于组合赋权-VIKOR法的山区施工便道方案优选模型 被引量:1
18
作者 林宇亮 左伟俊 +1 位作者 邢浩 郭冬冬 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第2期445-456,共12页
为对山岭地区施工便道方案进行客观、全面、精准评价,结合行业设计规范和相关研究成果,构建山区施工便道方案指标评价体系,提出一种山区施工便道方案优选模型。该模型采用三标度层次分析法和熵权法分别计算评价指标的主、客观权重,基于... 为对山岭地区施工便道方案进行客观、全面、精准评价,结合行业设计规范和相关研究成果,构建山区施工便道方案指标评价体系,提出一种山区施工便道方案优选模型。该模型采用三标度层次分析法和熵权法分别计算评价指标的主、客观权重,基于博弈论思想对主、客观权重进行赋权确定综合权重,并运用VIKOR法(多准则妥协解排序法)对山区施工便道方案进行优选。以某高速公路山区施工便道方案比选为工程实例,针对4种施工便道方案进行综合比选,并将本文模型与加权TOPSIS法(优劣解距离法)、灰色加权关联分析法进行对比分析。研究结果表明:3种计算模型得出的最优方案一致,组合赋权的方法克服了单一赋权的缺陷,使指标评价更客观。相比于加权TOPSIS法和灰色加权关联分析法,本文模型能抵御外部因素的干扰,明显地辨别方案之间的差距,得到准确清晰的方案排序,且当评价方案众多时,本文模型能够提供更多方案选择,得到最优化方案。 展开更多
关键词 道路工程 施工便道 优选模型 博弈论 VIKOR法
下载PDF
基于ISM-SD的地下洞室群施工进度风险传递路径研究
19
作者 黄建文 谭永祎 +3 位作者 陈梦媛 王兴霞 姜海龙 江谊园 《水电能源科学》 北大核心 2024年第1期93-97,共5页
针对水电工程地下洞室群施工进度风险存在传递问题,提出了基于解释结构模型(ISM)和系统动力学(SD)的地下洞室群施工进度风险传递路径分析方法。根据地下洞室群的施工特点,建立了地下洞室群施工进度风险指标体系;结合风险传递机理,运用... 针对水电工程地下洞室群施工进度风险存在传递问题,提出了基于解释结构模型(ISM)和系统动力学(SD)的地下洞室群施工进度风险传递路径分析方法。根据地下洞室群的施工特点,建立了地下洞室群施工进度风险指标体系;结合风险传递机理,运用解释结构模型分析风险因素间传递关系,建立了风险因素传递矩阵,并总结归纳出风险因素关系对照表,通过系统动力学分析风险因素间传递路径,揭示了施工进度风险传递路径网络;集成ISM-SD构建了地下洞室群施工进度风险传递路径分析模型,并结合西南地区某大型水电站地下洞室群工程进行分析。结果表明,该方法可有效识别施工进度风险重要因素和关键传递路径,为地下洞室群施工进度风险管理提供了决策依据。 展开更多
关键词 地下洞室群 施工进度风险 风险传递路径 解释结构模型 系统动力学
下载PDF
基于组合赋权-云模型的智能建造应用成熟度的评价
20
作者 苑东亮 王治 +1 位作者 任连伟 张建设 《科学技术与工程》 北大核心 2024年第19期8239-8247,共9页
为解决传统施工方式存在的问题,建筑施工企业向智能建造方式逐渐转型已是大势所趋。针对新时代、新基建对智能建造施工的要求并结合能力成熟度理论,提出一种基于组合赋权-云模型的智能建造应用成熟度评价模型。首先,从施工、智能、其他... 为解决传统施工方式存在的问题,建筑施工企业向智能建造方式逐渐转型已是大势所趋。针对新时代、新基建对智能建造施工的要求并结合能力成熟度理论,提出一种基于组合赋权-云模型的智能建造应用成熟度评价模型。首先,从施工、智能、其他3个维度,构建包含勘测、设计规划、施工现场管理、资源要素、智能建造技术、数据驱动、企业顶层设计7个类别的智能建造应用成熟度评价体系。其次,采用G1法与熵权法确定各指标的主、客观权重,运用博弈论进行权重组合。最后,通过云模型展示施工企业智能建造应用成熟度等级,并依据评价结果进行展望。研究结果表明:施工企业智能建造应用成熟度评价等级为“集成共享级”,评价结果与该企业实际情况吻合,验证了本文方法的适用性与科学性,为施工企业智能建造应用的发展提供科学依据。 展开更多
关键词 智能建造 成熟度 博弈论组合赋权法 云模型 评价等级
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部