The effects of lance height and bottom blown flowrate on the mixed time, the splashing amount, the penetrating depth, and the level fluctuation of an 85 t combined blown converter have been studied using a water model...The effects of lance height and bottom blown flowrate on the mixed time, the splashing amount, the penetrating depth, and the level fluctuation of an 85 t combined blown converter have been studied using a water model. The results show that the maximal stirring energy is provided to the bath at the top lance height of about 50-100 mm. When the top lance height is in the range ofg0- 110 mm, the splashing amount caused by the top jet can reach the maximal value. The appropriate operational parameters of Chongqing Iron and Steel Company (CISC) converter have been established that the top lance height is 1600-1760 mm and the bottom blowing flowrate is 240-480 Nm^3/h in the primary phase of a heat, 1100-1300 mm and 160-200 Nm^3/h in the second phase, and 1040-1120 mm and 200-350 Nm^3/h in the end phase. Also, the trial shows that the metallurgical result of the studied blow pattern is better than that of the former pattern. At the starting 3-4 min of a heat, the strong splashing is eliminated. 2008 University of Science and Technology Beijing. All rights reserved.展开更多
洁净低碳铝镇静钢(%:0.05~0.06C、0.04Al)由210 t顶底复吹转炉-CAS精炼-连铸230 mm板坯流程冶炼。通过27~28 min CAS密封吹氩处理,钢液T[O]由CAS前(50~60)×10^(-6)降至(19~24)×10^(-6),中间包钢水T[O]降至(17~20)×1...洁净低碳铝镇静钢(%:0.05~0.06C、0.04Al)由210 t顶底复吹转炉-CAS精炼-连铸230 mm板坯流程冶炼。通过27~28 min CAS密封吹氩处理,钢液T[O]由CAS前(50~60)×10^(-6)降至(19~24)×10^(-6),中间包钢水T[O]降至(17~20)×10^(-6),铸坯总氧含量为(11~15)×10^(-6)。铸坯中主要为≤3μm的球状、块状Al_2O_3和Al_2O_3-MnS复合夹杂。≥50μm的大型夹杂物最高含量为5.18 mg/10kg。展开更多
文摘The effects of lance height and bottom blown flowrate on the mixed time, the splashing amount, the penetrating depth, and the level fluctuation of an 85 t combined blown converter have been studied using a water model. The results show that the maximal stirring energy is provided to the bath at the top lance height of about 50-100 mm. When the top lance height is in the range ofg0- 110 mm, the splashing amount caused by the top jet can reach the maximal value. The appropriate operational parameters of Chongqing Iron and Steel Company (CISC) converter have been established that the top lance height is 1600-1760 mm and the bottom blowing flowrate is 240-480 Nm^3/h in the primary phase of a heat, 1100-1300 mm and 160-200 Nm^3/h in the second phase, and 1040-1120 mm and 200-350 Nm^3/h in the end phase. Also, the trial shows that the metallurgical result of the studied blow pattern is better than that of the former pattern. At the starting 3-4 min of a heat, the strong splashing is eliminated. 2008 University of Science and Technology Beijing. All rights reserved.