期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Single-Machine Preemptive Scheduling with Release Dates Involving the Total Weighted Late Work Criterion
1
作者 Zhi-Chao Geng Yuan Zhang 《Journal of the Operations Research Society of China》 EI CSCD 2023年第3期693-706,共14页
This paper investigates the preemptive scheduling with release dates on a single machine to minimize the total weighted late work.We firstly present an O(nlogn)-time algorithm for the single-agent problem with disagre... This paper investigates the preemptive scheduling with release dates on a single machine to minimize the total weighted late work.We firstly present an O(nlogn)-time algorithm for the single-agent problem with disagreeable weights and due dates.And then,we extendedly study the two-agent Pareto-scheduling problem with jobs having a common due date to minimize each agent's total weighted late work,and give a polynomial-time algorithm that is based on the parameters analysis to generate the Pareto frontier. 展开更多
关键词 Preemptive scheduling total weighted late work Two agent Pareto frontier
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部