In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation...In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation loading, especially at the stage of its design, is an extremely important issue because of the choice of the processing equipment of the main circuit or protection devices. In the range of investigations of railway traction substation B in vicinity of Cracow (Poland), the measurements of current load in hours 4:00 a.m.-8:00 p.m. were realized. The measurements for the analysis were chosen from those realized between 6:00 a.m.-8:00 a.m. (the morning rush time). Due to the sampling of 2 h summit with a frequency of 2 kHz, the recorded data set contains 1.44 ~ 107 elements. Therefore, the necessary transformation of data was to lower frequency 1 Hz, 10 Hz and 50 Hz. The results of the analysis presented below indicate the effect of such conduct on the obtained results for the parameters of time series models. In view of the unsatisfactory effects of the polynomial approximation, there is a need to seek a more efficient approximation method for achieving the optimum compatibility with the measured process. Continued research should lead to the formulation of procedures, which will determine an acceptable accuracy of the expected variability of traction substation loads.展开更多
The article discusses the possibility of further modernization of the standard microprocessor relay protection of AC overhead system feeders DPA-27.5-TNF, which is operated on the Trans-Baikal Railway by creating an a...The article discusses the possibility of further modernization of the standard microprocessor relay protection of AC overhead system feeders DPA-27.5-TNF, which is operated on the Trans-Baikal Railway by creating an additional automated system of unified templates necessary for the occurrence of “trainability” elements. The templates will be formed via a separate dedicated channel for transmission, processing and storage of the necessary information, not related to the operation of the terminal, with its subsequent visualization at the workplace of the duty personnel of traction substations, together with information from the “GID” software received via another dedicated wired channel. With the help of such a base of unified preset templates, in the future, it will be possible not only to identify the specific causes of each emergency shutdown but also to reduce their number by dynamically adjusting the existing presets of the standard operation algorithm.展开更多
The article discusses the possibility of a potential reduction in the number of operations of microprocessor relay protection of feeders of the contact network of AC railways TsZA-27.5-FKS (FTS) for unknown reasons. R...The article discusses the possibility of a potential reduction in the number of operations of microprocessor relay protection of feeders of the contact network of AC railways TsZA-27.5-FKS (FTS) for unknown reasons. Real statistics on the number of microprocessor relay protection operations at the Buryatskaya traction substation are presented, simulation of the real train situation (in accordance with the regime maps of the throughput capacity of the sections of the Trans-Baikal railway) was carried out in the specialized software complex “KORTES”. Based on the results of the analysis of simulation modeling, the process of forming a unified template of settings using neural network technologies is considered, which characterizes only this specific regular train situation. To protect objects in the event of pre-emergency and emergency modes of operation of the traction power supply system, a variant of changing the standard operation algorithm of the TsZA-27.5-FKS (FTS) terminal by introducing additional blocks for calculating the predictive functions of current and voltage has been proposed.展开更多
文摘In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation loading, especially at the stage of its design, is an extremely important issue because of the choice of the processing equipment of the main circuit or protection devices. In the range of investigations of railway traction substation B in vicinity of Cracow (Poland), the measurements of current load in hours 4:00 a.m.-8:00 p.m. were realized. The measurements for the analysis were chosen from those realized between 6:00 a.m.-8:00 a.m. (the morning rush time). Due to the sampling of 2 h summit with a frequency of 2 kHz, the recorded data set contains 1.44 ~ 107 elements. Therefore, the necessary transformation of data was to lower frequency 1 Hz, 10 Hz and 50 Hz. The results of the analysis presented below indicate the effect of such conduct on the obtained results for the parameters of time series models. In view of the unsatisfactory effects of the polynomial approximation, there is a need to seek a more efficient approximation method for achieving the optimum compatibility with the measured process. Continued research should lead to the formulation of procedures, which will determine an acceptable accuracy of the expected variability of traction substation loads.
文摘The article discusses the possibility of further modernization of the standard microprocessor relay protection of AC overhead system feeders DPA-27.5-TNF, which is operated on the Trans-Baikal Railway by creating an additional automated system of unified templates necessary for the occurrence of “trainability” elements. The templates will be formed via a separate dedicated channel for transmission, processing and storage of the necessary information, not related to the operation of the terminal, with its subsequent visualization at the workplace of the duty personnel of traction substations, together with information from the “GID” software received via another dedicated wired channel. With the help of such a base of unified preset templates, in the future, it will be possible not only to identify the specific causes of each emergency shutdown but also to reduce their number by dynamically adjusting the existing presets of the standard operation algorithm.
文摘The article discusses the possibility of a potential reduction in the number of operations of microprocessor relay protection of feeders of the contact network of AC railways TsZA-27.5-FKS (FTS) for unknown reasons. Real statistics on the number of microprocessor relay protection operations at the Buryatskaya traction substation are presented, simulation of the real train situation (in accordance with the regime maps of the throughput capacity of the sections of the Trans-Baikal railway) was carried out in the specialized software complex “KORTES”. Based on the results of the analysis of simulation modeling, the process of forming a unified template of settings using neural network technologies is considered, which characterizes only this specific regular train situation. To protect objects in the event of pre-emergency and emergency modes of operation of the traction power supply system, a variant of changing the standard operation algorithm of the TsZA-27.5-FKS (FTS) terminal by introducing additional blocks for calculating the predictive functions of current and voltage has been proposed.