This paper makes an analysis of the impact on the structure of the corridortype train working diagram by increasing the 350 km/h train pairs of Beijing-Shanghai High-speed Railway(HSR).According to the requirements of...This paper makes an analysis of the impact on the structure of the corridortype train working diagram by increasing the 350 km/h train pairs of Beijing-Shanghai High-speed Railway(HSR).According to the requirements of operation speed diversity,the multi-station receiving characteristics of cross-line trains and different train stopping schemes,this paper proposes a scheme of adding 350 km/h train pairs via computer analysis of carrying capability mode.The scheme is divided into three stages:(1)Initial stage:It is planned to increase trains running at 350 km/h,with 15~26 pairs of trains put into operation;(2)Rapid increase stage:27~142 pairs of 350 km/h trains are put into operation;(3)Full replacement stage:143~195 pairs of 350 km/h trains are put into operation,during which the number of cross-line trains under operation is controlled,the number of cross-line trains in each section is determined,the operation and connection scheme of cross-line trains is adjusted and the train stopping scheme is optimized.The results of this study were used for the adjustment of the train working diagram in the third quarter of June 25,2021 to increase the number of 350 km/h train pairs from 19 to 30 on Beijing-Shanghai HSR.350 km/h trains are evenly arranged during 7:00—19:00 on the train working diagram and 300 km/h trains are arranged by making full use of every time and space,to improve the travelling speed on Beijing-Shanghai HSR as a whole.展开更多
文摘This paper makes an analysis of the impact on the structure of the corridortype train working diagram by increasing the 350 km/h train pairs of Beijing-Shanghai High-speed Railway(HSR).According to the requirements of operation speed diversity,the multi-station receiving characteristics of cross-line trains and different train stopping schemes,this paper proposes a scheme of adding 350 km/h train pairs via computer analysis of carrying capability mode.The scheme is divided into three stages:(1)Initial stage:It is planned to increase trains running at 350 km/h,with 15~26 pairs of trains put into operation;(2)Rapid increase stage:27~142 pairs of 350 km/h trains are put into operation;(3)Full replacement stage:143~195 pairs of 350 km/h trains are put into operation,during which the number of cross-line trains under operation is controlled,the number of cross-line trains in each section is determined,the operation and connection scheme of cross-line trains is adjusted and the train stopping scheme is optimized.The results of this study were used for the adjustment of the train working diagram in the third quarter of June 25,2021 to increase the number of 350 km/h train pairs from 19 to 30 on Beijing-Shanghai HSR.350 km/h trains are evenly arranged during 7:00—19:00 on the train working diagram and 300 km/h trains are arranged by making full use of every time and space,to improve the travelling speed on Beijing-Shanghai HSR as a whole.