期刊文献+
共找到1,975篇文章
< 1 2 99 >
每页显示 20 50 100
Impact of the eastern water diversion from the south to the north project on the saltwater intrusion in the Changjiang Estuary in China 被引量:10
1
作者 XU Kun ZHU Jianrong GU Yuliang 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2012年第3期47-58,共12页
The south to the north project (WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensionai (3D) numerical model.The net unit width flux in the Changjiang Estuary as well as ... The south to the north project (WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensionai (3D) numerical model.The net unit width flux in the Changjiang Estuary as well as the sectional salt flux is calculated in the North Branch (NB),the South Branch (SB),the North Channel (NC),the South Channel (SC),the North Passage (NP) and the South Passage (SP),respectively.The net seaward water flux in the SB is reduced,and the net water flux spilling over from the NB to the SB is enhanced after the eastern WDP.Under the mean river discharge condition in the dry season,the net salt flux spilling over from the NB to the SB is increased by 2.09 t/s and 0.52 t/s during the spring and neap tides,respectively,due to the eastern WDP.The saltwater intrusion in the Changjiang Estuary is enhanced by the eastern WDP.Compared with that during the spring tide,the net water diversion ratio during the neap tide in the NC is smaller,and thus the enhancement of the saltwater intrusion by the eastern WDP is smaller in the NC,and larger in the NP and the SP.The tidally averaged surface salinity at the water intakes of the Dongfengxisha Reservoir,the Chenhang Reservoir and the Qingcaosha Reservoir rises both during the spring and neap tides. 展开更多
关键词 eastern water diversion from the south to the north project saltwater intrusion Changjiang Estuary numerical calculation the water resource
下载PDF
Forecasting Loss of Ecosystem Service Value Using a BP Network: A Case Study of the Impact of the South-to-north Water Transfer Project on the Ecological Environmental in Xiangfan, Hubei Province, China 被引量:1
2
作者 YUN-FENG CHEN, JING-XUAN ZHOU, JIE XIAO, AND YAN-PING LIEnvironmental Science and Engineering College, Huazhong University of Science and Technology, Wuhan 430074, Hubei, China 《Biomedical and Environmental Sciences》 SCIE CAS CSCD 2003年第4期379-391,共13页
Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific... Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling. 展开更多
关键词 Artificial neural network BP Ecosystem service value south-to-north water Transfer Project
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
3
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western Route of south-to-north water Transfer Project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
下载PDF
Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project 被引量:3
4
作者 Jing-chun FENG Lei LI +4 位作者 Nan YANG Yu-zhen HONG Min PANG Xiong YAO Li-cheng WANG 《Water Science and Engineering》 EI CAS 2011年第2期225-236,共12页
Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy... Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields. 展开更多
关键词 multi-resource constraints south-to-north water Diversion Project project portfolio critical chain
下载PDF
Evolution trend of the water quality in Dongping Lake after South-North Water Transfer Project in China 被引量:2
5
作者 HU Zun-fang KANG Feng-xin +4 位作者 ZOU An-de YU Lin-song LI Yang TIAN Tong-liang KANG Gui-ling 《Journal of Groundwater Science and Engineering》 2019年第4期333-339,共7页
To investigate the evolution trend of water quality in Dongping Lake after South-North Water Transfer Project operation as well as to ensure the safe usage of the water receiving areas, water samples were collected an... To investigate the evolution trend of water quality in Dongping Lake after South-North Water Transfer Project operation as well as to ensure the safe usage of the water receiving areas, water samples were collected and determined before and after water delivery in different hydrological seasons. Then, comprehensive pollution index method, comprehensive nutrition state index method and health risk assessment model were utilized to evaluate the quality, nutrition, and health risk of Dongping Lake water. Results showed that the quality of Dongping Lake water still met level Ⅲ (light pollution) no matter before or after water delivery. The nutrition state was improved from light eutropher before water delivery to mesotropher after water delivery. The health risk level was reduced from high-medium before water delivery to medium level after water delivery. In summary, the operation of the eastern route of South-North Water Transfer Project is beneficial for water environment improvement of Dongping Lake. 展开更多
关键词 south-north water Transfer Project Dongping LAKE water quality NUTRITION Health risk
下载PDF
The variation of DOM during long distance water transport by the China South to North Water Diversion Scheme and impact on drinking water treatment 被引量:1
6
作者 Hankun Yang Yujuan Li +6 位作者 Hongyu Liu Nigel J.D.Graham Xue Wu Jiawei Hou Mengjie Liu Wenyu Wang Wenzheng Yu 《Frontiers of Environmental Science & Engineering》 SCIE EI CSCD 2024年第5期85-100,共16页
In this study,samples were taken from three locations,upstream to downstream,along the central route project of the China South to North Water Diversion(SNWD)scheme in summer and winter.These were used to reveal the v... In this study,samples were taken from three locations,upstream to downstream,along the central route project of the China South to North Water Diversion(SNWD)scheme in summer and winter.These were used to reveal the variations of dissolved organic matter(DOM)during the water transfer process,and the effects of these variations on drinking water treatment and disinfection by-products formation potential(DBPs-FP).The results showed that polysaccharides accumulate in summer and reduce in winter with flow distance,which has an important effect on the overall properties of DOM,as well as on the performance of coagulation,ultrafiltration,and the formation of DBPs.Humic substances,and their hydrophilic content,also increased in summer and decreased in winter with flow distance.In contrast,the concentration of small organic substances(MW≤1000 Da)increased in both summer and winter with flow distance,which affected both nanofiltration(NF)membrane fouling and DBPs-FP.The results provide a useful case study of spatial and temporal changes in raw water DOM during long distance water transfer and their impact on the treatment and quality of drinking water from the SNWD. 展开更多
关键词 Long-distance water transfer the China south to north water Diversion Scheme COAGULATION Membrane filtration Disinfection by-products
原文传递
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
7
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ... This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 China's south-north water Transfer Scheme(SNWT) the middle route project of south-north water Transfer(MRPSNWT) assessment ecosystem services monetary indices
下载PDF
Optimal Operation for Baoying Pumping Station in East Route Project of South-to-North Water Transfer 被引量:7
8
作者 FENG Xiaoli QIU Baoyun +2 位作者 CAO Haihong WEI Qianglin TENG Haibo 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2009年第1期78-83,共6页
Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjus... Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge. 展开更多
关键词 south-to-north water Transfer Baoying pumping station optimal operation adjusting blade angle time-varying electrical price
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
9
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water Transfer Project
下载PDF
Research on Expansive Soils Encountered in Middle Route Project of South-to-north Water Transfer Canal 被引量:2
10
作者 GONG Bi-weiSenior Engineer, Yangtze River Scientific Research Institute, Changjiang Water Resources Commission, Wuhan, 430010, China ZHOU Xiao-wenSenior Engineer, Yangtze River Scientific Research Institute, Changjiang Water Resources Commission, Wuhan, 430010, China BAO Chen-gangProfessor-Senior Engineer, Yangtze River Scientific Research Institute, Changjiang Water Resources Commission, Wuhan, 430010, China 《人民长江》 北大核心 2002年第S1期36-39,共4页
The main canal of the Middle Route Project of South-to-North Water Transfer totals more than 1 240 km in length. In Henan Province and Hebei Province, there will be a section of more than 120 km passing through an exp... The main canal of the Middle Route Project of South-to-North Water Transfer totals more than 1 240 km in length. In Henan Province and Hebei Province, there will be a section of more than 120 km passing through an expansive soils area. Expansive soils is a special kind of tenacious clay, which swells when meeting with water and shrinks when losing water. With complicated mechanical properties, it changes with the variation of water content. As a result, expansive soils become the key object of study on unsaturated soils mechanics for the project. From the status of study on unsaturated soils at home and abroad, this paper covers an analysis on stability analysis method of expansive soils slope, determination of expansive soils strength, rational design of canal slope ratio and support, and forecast of landslide for the Middle Route Project of South-to-North Water Transfer. 展开更多
关键词 Unsaturated SOILS Expansive SOILS Suction the south-to-north water Transfer CANAL
下载PDF
Asynchronism-synchronism of regional precipitation in South-to-North Water Transfer planned areas
11
作者 ZHENG Hong-xing, LIU Chang-ming (Institute of Geographic Sciences and Natural Resources Research, CAS, Beijing 100101, China) 《Journal of Geographical Sciences》 SCIE CSCD 2001年第2期161-169,共9页
This paper proposes a method on analyzing the asynchronism-synchronism of precipitation of different hydrological regions regarding the S-to-N water transfer areas of eastern China. The general process of the analysis... This paper proposes a method on analyzing the asynchronism-synchronism of precipitation of different hydrological regions regarding the S-to-N water transfer areas of eastern China. The general process of the analysis includes three steps. Firstly, we created the rainfall series of the region concerned by calculating the regional average rainfall of the stations in the area with the help of the classical Thiessen Polygon method. Secondly, the standards of assessment indices for wetness or dryness are set according to Gamma distribution function with a certain probability P 37.5% or 62.5% given respectively. Finally, the frequency of nine combinations are counted as the quantitative feature of asynchronism and synchronism in three time scales, that is the yearly, seasonal and monthly scales. The asynchronism-synchronism of two region pairs has been estimated. The results show that the frequency of precipitation asynchronism in 1957–1998 is larger than the synchronism frequency for both the North China-middle and lower Yangtze River pair and for the North China-upper Hanjiang River pair. As for the synchronism phenomena, the frequency of Nd?Sd is rather low. As the combinations that are suitable for water transfers are Nd?Sw, Nn?Sw, Nd?Sn and Nn?Sn, the total frequency of these combinations for North China-middle and lower Yangtze River is 40% on an annual basis, but only 28% in spring when water shortages are most likely to occur. The total frequency of these combinations for North China-upper Hanjiang River is about 24% on an annual basis, but 35% in spring and winter. It should be noted that if future precipitation patterns are similar to that of the period 1957–1998, it is very important to change the natural character of asynchronism-synchronism by enhancing the capability of hydro-projects regulation and improving management of the water transfer project. 展开更多
关键词 synchronous frequency asynchronous frequency south-to-north water Transfer
下载PDF
Price Analysis of Water Supply for South-to-North Water Transfer Project
12
作者 QIU Zhong enProfessor, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China Tan Chang liSenior Engineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Qin Engineer, Design Institute, Chan 《人民长江》 北大核心 2001年第S1期29-32,共4页
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ... The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions. 展开更多
关键词 PRICE of water supply water PRICE estimation FUND RAISING schemes water TRANSFER cost Middle-Route Project of south-to-north water TRANSFER
下载PDF
LONG AND DEEP DIVERSION TUNNELS OF 1^(ST) STAGE PROJECT IN WEST ROUTE OF SOUTH-NORTH WATER TRANSFER PROJECT
13
作者 Shen Fengsheng,Liu Xin (Reconnaissance,Planning,Design and Research Institute,Yellow River Construction Commission, Ministry of Water Resources, Zhengzhou 450003 China) 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第9期1527-1532,共6页
West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze... West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction. 展开更多
关键词 南水北调工程 西线工程 引水隧洞 TBM
下载PDF
WATER QUALITY MODELING AND POLLUTION CONTROL FOR THE EASTERN ROUTE OF SOUTH TO NORTH WATER TRANSFER PROJECT IN CHINA 被引量:17
14
作者 WANG Chao WANG Yan-ying WANG Pei-fang 《Journal of Hydrodynamics》 SCIE EI CSCD 2006年第3期253-261,共9页
South to North Water Transfer Project in China is the largest project over centuries to solve the water shortage problem in vast areas of northern China. It comprises of three routes: the eastern, central and western... South to North Water Transfer Project in China is the largest project over centuries to solve the water shortage problem in vast areas of northern China. It comprises of three routes: the eastern, central and western route and this study mainly focused on the eastern route. As water quality is the key factor for the eastern route, this paper examined the main factors influencing water quality of the main route south of the Yellow River, by investigating the point source, non-point source (diffusive source) and internal source pollutions along the main eastern route and in its drainage basins, and assessing the Current water quality in the waterways. According to the complicated and combined systems of rivers and lakes in this route, one-dimensional water quantity and quality model for rivers and two-dimensional model for lakes were developed to simulate the hydrodynamic and pollutant transport processes. The numerical method and model algorithm were described. The values of model parameters were estimated by using field-monitoring data along the main route and the inverse modeling technique. Established models were employed to predict the degradations of CODMn and NH4^+-N in the main stream, under the conditions of current pollution loads and different hydrologic conditions. Schemes were present for controlling total quantities of pollutants from point source and non-point source along the main route to secure water quality for the eastern route. 展开更多
关键词 south to north water Transfer Eastern RouteProject water quality pollution loads pollution control
原文传递
MODELING OF WATER DYNAMICS AND POLLUTANT SPREADING IN THE LUOMAHU RESERVOIR FOR WATER TRANSFER FORM SOUTH TO NORTH OF CHINA 被引量:3
15
作者 Wang Chao College of Water Resources and Environment, Hohai University, Nanjing 210098, China 《Journal of Hydrodynamics》 SCIE EI CSCD 2001年第4期14-23,共10页
Water quality is the key problem of the East-Line Project of Water Transfer from South to North China. In this paper, the principles of a 1D and 2D-integrated mathematical model for describing the dynamics of water in... Water quality is the key problem of the East-Line Project of Water Transfer from South to North China. In this paper, the principles of a 1D and 2D-integrated mathematical model for describing the dynamics of water in a flow-through river, canals and lakes was worked out. The numerical method and model algorithm were developed. The efficiency of the model was estimated by applying it to studying water dynamics in the Luomahu reservoir and simulating the spreading process of a polluted water mass and the evolution of the concentration. The results of calculations are used to assess water environmental quality and to manage water resource in the Luomahu reservoir and the Jinghang-Canal for the Project of Water Transfer from South to North China. 展开更多
关键词 mathematical model integral stream function water quality water Transfer from south to north Project
原文传递
Estimating the minimum in-stream flow requirements via wetted perimeter method based on curvature and slope techniques 被引量:2
16
作者 LIU Suxia' MO Xingguo +4 位作者 XIA Jun LIU Changming LINZhonghui MEN Baohui JI Lina 《Journal of Geographical Sciences》 SCIE CSCD 2006年第2期242-250,共9页
Under the assumptions of triangular cross section channel and uniform stable flow, an analytical solution of the minimum ecological in-stream flow requirement (MEIFR) is deduced. Based on the analytical solution, th... Under the assumptions of triangular cross section channel and uniform stable flow, an analytical solution of the minimum ecological in-stream flow requirement (MEIFR) is deduced. Based on the analytical solution, the uncertainty of the wetted perimeter method is analyzed by comparing the two techniques for the determination of the critical point on the relationship curve between wetted perimeter, P and discharge, Q. It is clearly shown that the results of MEIFR based on curvature technique (corresponding to the maximum curvature) and slope technique (slope being 1) are significantly different. On the P-Q curve, the slope of the critical point with the maximum curvature is 0.39 and the MEIFR varied prominently with the change of the slope threshold. This indicates that if a certain value of the slope threshold is not available for slope technique, curvature technique may be a better choice. By applying the analytical solution of MEIFR in the losing rivers of the Western Route South-to-North Water Transfer Project in China, the MEIFR value via curvature technique is 2.5%-23.7% of the multi-year average annual discharge, while that for slope technique is 11%-105.7%. General conclusions would rely on the more detailed research for all kinds of cross-sections. 展开更多
关键词 uncertainty wetted perimeter minimum in-stream flow requirements analytical solution Western Routhe south-to-north water Transfer Project in China
下载PDF
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
17
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 Jiangsu Section of Eastern Route south-to-north water DIVERSION Project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
南水北调东线一期工程受水区生态环境效益演变 被引量:1
18
作者 高媛媛 杨亚锋 +2 位作者 杨荣雪 刘艺欣 王红瑞 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期566-574,共9页
研究南水北调东线一期工程通水以来受水区生态环境效益的演变态势,对南水北调后续工程高质量建设、加快构建国家水网以及促进工程综合效益发挥有决策参考作用。以定性定量相结合的方式分析东线一期工程在优化水资源配置、保障饮水安全... 研究南水北调东线一期工程通水以来受水区生态环境效益的演变态势,对南水北调后续工程高质量建设、加快构建国家水网以及促进工程综合效益发挥有决策参考作用。以定性定量相结合的方式分析东线一期工程在优化水资源配置、保障饮水安全、复苏河湖生态环境和畅通南北经济循环等方面的作用,进而结合层次分析法,从直接效益和间接效益2个方面,筛选构建东线一期工程受水区生态环境效益评价指标体系,主要包括工程年供水量、水质改善度、生态补水量、地下水压采量、地下水水位、水域面积、绿地面积和涵养水源等,并采用VlseKriterijumska Optimizacija I Kompromisno Resenje(VIKOR)多准则妥协解排序方法对南水北调东线一期工程通水以来即2013-2022年受水区生态环境效益演变态势进行分析。结果表明:南水北调东线一期工程通水的10年以来,受水区的生态环境整体复苏效果明显,近3年排序值保持在0.8以上;受降水偏枯进而影响地下水开采量和地下水水位等因素影响,2019年间接生态环境效益下降29.2%,之后迅速恢复并保持稳定。在分析直接效益和间接效益演变的基础上,从工程提质增效、提高工程水质状况以及完善体制机制建设等方面提出东线一期工程进一步促进受水区生态环境持续改善的策略和建议,以期为东线工程及受水区生态环境保护及高质量发展相关研究、决策制定等提供参考。 展开更多
关键词 南水北调东线一期工程 生态环境效益 指标体系 VIKOR
下载PDF
水网布局下黄河流域应对极端枯水的关键科学问题 被引量:1
19
作者 王煜 彭少明 +1 位作者 郑小康 尚文绣 《水科学进展》 EI CAS CSCD 北大核心 2024年第1期11-23,共13页
变化环境下极端气象水文事件频发,长江、黄河面临同枯风险。在国家水网建设背景下,为提高长江、黄河同枯的极端不利情景下黄河流域水资源安全保障能力,本文分析了长江、黄河两大流域水资源安全面临的现实问题,识别了变化环境下大型流域... 变化环境下极端气象水文事件频发,长江、黄河面临同枯风险。在国家水网建设背景下,为提高长江、黄河同枯的极端不利情景下黄河流域水资源安全保障能力,本文分析了长江、黄河两大流域水资源安全面临的现实问题,识别了变化环境下大型流域枯水遭遇—水危机形成—跨流域调水潜力—多线路成网互济—极端枯水下水资源安全保障中亟需破解的关键科学问题,构建了水网布局下黄河流域应对极端枯水的总体研究框架,提出该领域重点研究方向包括:变化环境下长江、黄河极端枯水遭遇规律与空间变异机制,水危机风险多链路传导与复合影响定量评估,极端枯水下跨流域调水挖潜增供,长江和黄河跨流域联合调配与多线路互济精细化调控、极端枯水下流域水资源韧性提升优化调控等。 展开更多
关键词 极端枯水 枯水遭遇 水危机 跨流域水资源调配 水资源系统韧性 南水北调 黄河 长江
下载PDF
南水北调西线工程水源区可调水量“十问”
20
作者 胡鹏 王浩 +13 位作者 赵勇 宁远 蒋云钟 刘欢 曾庆慧 杨泽凡 周毓彦 董宁澎 闫龙 阿膺兰 张丰博 唐家璇 王玉莲 王建华 《中国工程科学》 CSCD 北大核心 2024年第2期210-223,共14页
南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区... 南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区及其下游水资源开发利用、水生态环境、水力发电、航运等方面影响的角度,提出了与水源区可调水量相关的10个问题;以长江上游分布式水文模型为基础,建立了南水北调西线工程水源区可调水量模拟分析模型,力图系统、定量地回答所提问题。本文的主要研究结论有:在仅考虑满足水源区河道内外生态环境和经济社会需水的前提下,“上线+下线”组合方案多年平均可调水量为1.59×10^(10)m^(3),“完全下线”方案在建设岗托水库进行联调时,多年平均可调水量将达到1.74×10^(10)m^(3);在综合考虑调水对水源区水平衡、水力发电和航运影响及其可接受程度后,南水北调西线水源区可调水量为1.22×10^(10)~1.26×10^(10)m^(3)。长远来看,应谋划西南片区水网与国家水网主骨架、“大动脉”的连接与融合,在减小南水北调西线工程调水影响的同时,提高南水北调西线工程的整体供水能力以及对气候变化等外部条件的适应性。 展开更多
关键词 南水北调西线工程 水源区 可调水量 生态需水 跨流域调水
下载PDF
上一页 1 2 99 下一页 到第
使用帮助 返回顶部