This paper describes the planned power transmission from west to east through three channels. It presents the main characteristics of these three channels and the problems need to be solved.
On August 20, 2002, the construction-starting ceremonies of the north-channel projects for sending power from west to east were solemnly held at one main meeting place and five sub-meeting places simultaneously. The n...On August 20, 2002, the construction-starting ceremonies of the north-channel projects for sending power from west to east were solemnly held at one main meeting place and five sub-meeting places simultaneously. The north-channel projects for sending power from west to east started to construct this time include three transmission and substation projects and four power source projects. This paper makes a brief introduction to the seven projects.展开更多
This paper analyzes the power markets both in northwest sending end and, east receiving ends, points out the favorable and unfavorable conditions for power development In, the northwest area, brings forward,the develo...This paper analyzes the power markets both in northwest sending end and, east receiving ends, points out the favorable and unfavorable conditions for power development In, the northwest area, brings forward,the development planning of power sources and power network constructions, and presents the benefit estimation of sending power from northwest to east.展开更多
Coverage layer coated in the internal wall of pipeline enables the friction drag to be reduced, the throughput and the gas transmission efficiency to be increased, the frequency of pigging and the number of the interm...Coverage layer coated in the internal wall of pipeline enables the friction drag to be reduced, the throughput and the gas transmission efficiency to be increased, the frequency of pigging and the number of the intermediate compressor station to be reduced, and the power consumption of the compressor to be decreased etc. The drag reduction is a high advanced scientific technique with outstanding economical benefit. The study and application of internal coating technique for drag reduction of 4000 km trunk pipeline in West East gas transmission pipeline (WEGTP) project are described, in which the main points are the drag reduction principle, coating process and the indoor study of this technique with own decided knowledge property right at home.展开更多
The west east gas transmission engineering is an important project attracting domestic and foreign attention. The gas pipeline used in this project is a gas pipeline with the longest distance, largest pipe diameter an...The west east gas transmission engineering is an important project attracting domestic and foreign attention. The gas pipeline used in this project is a gas pipeline with the longest distance, largest pipe diameter and highest transmission pressure in the history of petroleum pipeline construction of China. For the construction of top rank gas pipeline in the world with high standard, high speed and high benefit, the key of specifying production of metallurgical and pipe making enterprises and ensuring quality performance of the steel and steel pipe is to research and formulate a feasible and satisfactory technical Specification for engineering steel and steel pipe with international level. In this paper the author introduces the establishment of the technical specification for West East gas pipeline project, and lays emphasis on the analysis and discussion of principle and method determining major technical indexes related to line pipes for West East gas pipeline. The author also introduces actual material selection of gas pipeline home and abroad, and presents examination and application of the technical specification for West-East gas pipeline.展开更多
This paper introduces the current situation of China power industry and interconnection, the necessity to develop interconnection, the principle of nationwide interconnection and the key technologies to be studiedincl...This paper introduces the current situation of China power industry and interconnection, the necessity to develop interconnection, the principle of nationwide interconnection and the key technologies to be studiedinclude HVDC and FACTS. The paper also discusses thefeasibility of 750 kV to be used in the northwest.regionand to speed up research and development of nighervoltage level in other regions of China, as well as scl-ence and technical innovation for transmission and dis-tribution projects.展开更多
With the increase in energy demand, the demand for oil and gas transmission pipes, particularly high-grade longitudinal submerged arc welded pipes (LSAWs), have been growing in recent years. The construction of the ...With the increase in energy demand, the demand for oil and gas transmission pipes, particularly high-grade longitudinal submerged arc welded pipes (LSAWs), have been growing in recent years. The construction of the 2nd West -East natural gas transmission pipeline project shows that the oil and gas pipeline construction has entered a new phase of development with X80 pipes being applied in large scales for the first time in China. This paper briefly introduces the 2nd West-East natural gas transmission pipeline project and its main technical requirements with the focus on the features of API standard 5L X80 grade Ф 1219 mm series of U-ing-O-ing-Expanding ( UOE ) LSAW pipes, which Baosteel developed with the integrated technology for the 2nd West-East natural gas transmission pipeline project. The analysis shows the extra-low carbon content, the high contents of manganese and niobium, the fine microstructure, the high strength,the toughness and the good weldability of X80 pipes meet the requirements of "the technical specification of LSAW linepipes for the 2nd West-East natural gas transmission pipeline project in China". By the end of June 2010, Baosteel had totally produced 322000 t of Ф 1219 mm X80 UOE steel pipes, which have been successfully used in the 2nd West-East natural gas transmission pipeline project, thus filling the gap of the production of large diameter X80 UOE LSAW pipes in China.展开更多
文摘This paper describes the planned power transmission from west to east through three channels. It presents the main characteristics of these three channels and the problems need to be solved.
文摘On August 20, 2002, the construction-starting ceremonies of the north-channel projects for sending power from west to east were solemnly held at one main meeting place and five sub-meeting places simultaneously. The north-channel projects for sending power from west to east started to construct this time include three transmission and substation projects and four power source projects. This paper makes a brief introduction to the seven projects.
文摘This paper analyzes the power markets both in northwest sending end and, east receiving ends, points out the favorable and unfavorable conditions for power development In, the northwest area, brings forward,the development planning of power sources and power network constructions, and presents the benefit estimation of sending power from northwest to east.
文摘Coverage layer coated in the internal wall of pipeline enables the friction drag to be reduced, the throughput and the gas transmission efficiency to be increased, the frequency of pigging and the number of the intermediate compressor station to be reduced, and the power consumption of the compressor to be decreased etc. The drag reduction is a high advanced scientific technique with outstanding economical benefit. The study and application of internal coating technique for drag reduction of 4000 km trunk pipeline in West East gas transmission pipeline (WEGTP) project are described, in which the main points are the drag reduction principle, coating process and the indoor study of this technique with own decided knowledge property right at home.
文摘The west east gas transmission engineering is an important project attracting domestic and foreign attention. The gas pipeline used in this project is a gas pipeline with the longest distance, largest pipe diameter and highest transmission pressure in the history of petroleum pipeline construction of China. For the construction of top rank gas pipeline in the world with high standard, high speed and high benefit, the key of specifying production of metallurgical and pipe making enterprises and ensuring quality performance of the steel and steel pipe is to research and formulate a feasible and satisfactory technical Specification for engineering steel and steel pipe with international level. In this paper the author introduces the establishment of the technical specification for West East gas pipeline project, and lays emphasis on the analysis and discussion of principle and method determining major technical indexes related to line pipes for West East gas pipeline. The author also introduces actual material selection of gas pipeline home and abroad, and presents examination and application of the technical specification for West-East gas pipeline.
文摘This paper introduces the current situation of China power industry and interconnection, the necessity to develop interconnection, the principle of nationwide interconnection and the key technologies to be studiedinclude HVDC and FACTS. The paper also discusses thefeasibility of 750 kV to be used in the northwest.regionand to speed up research and development of nighervoltage level in other regions of China, as well as scl-ence and technical innovation for transmission and dis-tribution projects.
文摘With the increase in energy demand, the demand for oil and gas transmission pipes, particularly high-grade longitudinal submerged arc welded pipes (LSAWs), have been growing in recent years. The construction of the 2nd West -East natural gas transmission pipeline project shows that the oil and gas pipeline construction has entered a new phase of development with X80 pipes being applied in large scales for the first time in China. This paper briefly introduces the 2nd West-East natural gas transmission pipeline project and its main technical requirements with the focus on the features of API standard 5L X80 grade Ф 1219 mm series of U-ing-O-ing-Expanding ( UOE ) LSAW pipes, which Baosteel developed with the integrated technology for the 2nd West-East natural gas transmission pipeline project. The analysis shows the extra-low carbon content, the high contents of manganese and niobium, the fine microstructure, the high strength,the toughness and the good weldability of X80 pipes meet the requirements of "the technical specification of LSAW linepipes for the 2nd West-East natural gas transmission pipeline project in China". By the end of June 2010, Baosteel had totally produced 322000 t of Ф 1219 mm X80 UOE steel pipes, which have been successfully used in the 2nd West-East natural gas transmission pipeline project, thus filling the gap of the production of large diameter X80 UOE LSAW pipes in China.