期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
High-Speed EMU TCMS Design and LCC Technology Research 被引量:2
1
作者 Hongwei Zhao Zhiping Huang Ying Mei 《Engineering》 SCIE EI 2017年第1期122-129,共8页
This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS)... This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS) software development platform, the TCMS testing and verification bench, the EMU driving simulation platform, and the EMU remote data transmittal and maintenance platform. All these platforms and benches combined together make up the EMU life cycle cost (LCC) system. Each platform facilitates EMU LCC management and is an important part of the system. 展开更多
关键词 Electrical multiple unit Train control and monitoring system Train communication network Life cycle cost Development platform testing bench Simulation Remote data transmittal
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部