Investing in large transport projects affects the (potential) economic development of metropolitan areas. Yet, very little critical research has been performed to understand how to assess these effects. The relationsh...Investing in large transport projects affects the (potential) economic development of metropolitan areas. Yet, very little critical research has been performed to understand how to assess these effects. The relationship between infrastructure investments and regional economic development is complex and indirect, and many theoretical and methodological difficulties remain. On the one hand, the assumption that investing in infrastructure is important to sustain economic growth is sometimes doubted. On the other hand, it is argued that investments in infrastructure enhance the accessibility of urban regions and that in the slipstream of such investments, social problems in urban regions can be tackled as well. Despite these contrasting views, there is at least a consensus that transport infrastructure development depends on economic development and vice versa. Yet, in many cases, the method of assessing economic impacts highly affects the results. Therefore, this paper focuses on a critical reflection of methods for estimating economic effects of infrastructure investments. A critical evaluation is made based on Indonesian and Japanese cases. After conducting in-depth desk research on both cases, we found that the broader effects on affected group of people tend to be overlooked due to the problems of time and space dimensions, the chain reaction of effects, and inappropriate data practices. The assessment on the appraisal processes tends to overlook the broader economic implication due to narrow focus and the concept of efficiency of economic theory.展开更多
The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of ...The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of importance in both theory and practice in water resource systems engineering. In order to achieve consistency and eliminate the dimensions of fuzzy qualitative and fuzzy quantitative evaluation indexes, to determine the weights of the indexes objectively, and to increase the differences among the comprehensive evaluation index values of water transportation project schemes, a projection pursuit method, named FPRM-PP for short, was developed in this work for selecting the optimal water transportation project scheme based on the fuzzy preference relation matrix. The research results show that FPRM-PP is intuitive and practical, the correction range of the fuzzy rained is both stable and accurate; preference relation matrix A it produces is relatively small, and the result obtherefore FPRM-PP can be widely used in the optimal selection of different multi-factor decision-making schemes.展开更多
The summer mean water vapor transport (WVT) and cross-equatorial flow (CEF) over the Asian- Australian monsoon region simulated by 22 coupled atmospheric-oceanic general circulation models (AOGCMs) from the Worl...The summer mean water vapor transport (WVT) and cross-equatorial flow (CEF) over the Asian- Australian monsoon region simulated by 22 coupled atmospheric-oceanic general circulation models (AOGCMs) from the World Climate Research Programme's Coupled Model Intercomparison Project Phase 5 (CMIP5) were evaluated. Based on climatology of the twentieth-century simulations, most of models have a reason- ably realistic representation of summer monsoon WVT characterized by southeast water vapor conveyor belt over the South Indian Ocean and southwest belt from the Arabian Sea to the East Asian. The correlation coefficients between NCEP reanalysis and simulations of BCC-CSMI-1, BNU-ESM, CanESM2, FGOALS-s2, MIROC4h and MPI-ESM-LR are up to 0.8. The simulated CEF depicted by the meridional wind along the equator includes the Somali jet and eastern CEF in low atmosphere and the reverse circulation in upper atmosphere, which were generally consistent with NCEP reanalysis. Multi-model ensemble means (MME) can reproduce more reasonable climatological features in spatial distribution both of WVT and CEF. Ten models with more reasonable WVT simulations were selected for future projection studies, including BCC- CSMI-1, BNU-ESM, CanESM2, CCSM4, FGOALS-s2, FIO-ESM, GFDL-ESM2G, MRIOCS, MPI-ESM-LR and NorESM-1M. Analysis based on the future projection experiments in RCP (Representative Concentra- tion Pathway) 2.6, RCP4.5, RCP6 and RCP8.5 show that the global warming forced by different RCP scenarios will results in enhanced WVT over the Indian area and the west Pacific and weaken WVT in the low latitudes of tropical Indian Ocean.展开更多
The tidal asymmetry-induced siltation below tidal barriers is a worldwide problem that restricts regional socio-economic and environmental development. The hydrodynamic processes of the small mud estuary also feature ...The tidal asymmetry-induced siltation below tidal barriers is a worldwide problem that restricts regional socio-economic and environmental development. The hydrodynamic processes of the small mud estuary also feature a high uncertainty after estuary restoration measures. In this study, a hydrodynamic model based on the MIKE21 is used to quantify the responses of tidal asymmetry to a two-phase restoration project in Shuanglong Estuary, Bohai Bay, China. According to the numerical modeling results, the tidal flat removal in the upper estuary(first-phase restoration) induces the flood asymmetry switching to the ebb asymmetry in unrestored reach but enhances flood asymmetry in widening restored reach. Although the tidal asymmetry reverts to flood-dominated pattern after full restoration over the estuary, the imbalance between flood and ebb velocities is relieved. A possible net sediment transport pattern based on a comparison of dominant asymmetric current and actual sediment transport period shows net sediments in the upper estuary and inlet transport seaward and landward, respectively, in the first-phase restoration, whereas landward net sediment transport occurs in the whole estuary under the second-phase restoration scenario. Given these results, we assume that a switch from the flood-dominated estuary to ebb-dominated estuary can be caused by redesigning the cross-sectional profile. The quantitative comparison of Lagrangian residual currents also implies that a channel–shoal structure rather than a flat bathymetry can promote the mass transport. Therefore, reshaping the channel–tidal flat system in restoration projects can prevent the sedimentation of the estuary and improve the water environment.展开更多
A community engagement project was designed and implemented to reach 10.6 million population in 13 districts of Uttarakhand state—India, to identify presumptive TB patients (PTBPs) and link to free diagnostics servic...A community engagement project was designed and implemented to reach 10.6 million population in 13 districts of Uttarakhand state—India, to identify presumptive TB patients (PTBPs) and link to free diagnostics services, either through referral or sputum collection and transportation (SCT). The objective of this study is to determine additional yield of TB patients achieved by providing SCT services in comparison to referrals of PTBPs identified in hard-to-reach areas. This was before and after comparative study conducted between April-June 2014 (2Q2014-before) to July-September 2014 (3Q2014-after). SCT was advised for all PTBPs identified from community level interventions between July-September 2014 (3Q2014-after). In 3Q2014, additional 279 (34%) PTBPs were examined in the microscopy centre with an additional 36 (51%) new smear positive (NSP) patient diagnosed. A total of 46 NSP (128%) were contributed by SCT alone. Higher proportion (94%) of TB patients was initiated on treatment in 3Q2014 in comparison to 2Q2014 (91%). SCT as a strategy for early case detection in hard-to-reach difficult terrain yields positive results in comparison to mere referral of PTBPs.展开更多
As the specialty of the product and the dim conscio us ness of environmental protection, the status of dirty, chaos and difference is l ong-term existed in the machine process factory. It seriously affects workers’ w...As the specialty of the product and the dim conscio us ness of environmental protection, the status of dirty, chaos and difference is l ong-term existed in the machine process factory. It seriously affects workers’ work and living environment, and restricts the total level of the environment p rotection in our country. The project is the fatal scientific research task of H enan province in 2001. As the members’ endeavor of task group, we have finished the total plan of green project system and some other key equipment to the mach ine process factory, such as the design of conveyer of chip, hydraulic former of chip, rough conveyer and dirt collector. And the green project system is made i nto model that the manufacturer can select. This item is a fire-new work. We ho pe that the expert of machine, environment protection and government official ca n put forward some advices by lodging this article. We contribute for our countr y’ environment protection and make it attain a new level.展开更多
This paper introduced the research and development of large-diameter SSAW pipes applied to West-East Pipeline project as well as domestic acicular ferrite pipeline steel of X70 grade. Its microstructure analysis was p...This paper introduced the research and development of large-diameter SSAW pipes applied to West-East Pipeline project as well as domestic acicular ferrite pipeline steel of X70 grade. Its microstructure analysis was performed in comparison with the pipeline steel of a foreign steel plant (SPC). This paper introduced the research of welding procedures prior to SSAW pipe making and some new procedures and technologies used for West-East Pipeline Project, and appraised the practical level of Large-diameter SSAW pipe applied to the West-East Pipeline Project.展开更多
Land bridge transportation means transportation from one seaport to another by railway across continents instead of by ocean ship. At present, there are two common routes for using land bridge transportation in the wo...Land bridge transportation means transportation from one seaport to another by railway across continents instead of by ocean ship. At present, there are two common routes for using land bridge transportation in the world. One is Asia-America-Europe land bridge, the other is Europe-Asia land bridge.Eurasia land bridge has obvious advantages over Asia-America-Europe land bridge due to its shorter distance, shorter transportation time and special freight rate. China started Eurasia land bridge transportation business in 1980. It mainly used the mode of railway-railway combined transportation. The comparison between using Eurasia land bridge and using shipping transportation from China to Northern and Western Europe shows that Euraria land bridge transportation can save time and get foreign exchange in time, and commodity turnover will be speeded up. According to the port layout and railway network structure, China’s land bridge transportation projects are proposed. They are Suifenhe project, Dalian展开更多
文摘Investing in large transport projects affects the (potential) economic development of metropolitan areas. Yet, very little critical research has been performed to understand how to assess these effects. The relationship between infrastructure investments and regional economic development is complex and indirect, and many theoretical and methodological difficulties remain. On the one hand, the assumption that investing in infrastructure is important to sustain economic growth is sometimes doubted. On the other hand, it is argued that investments in infrastructure enhance the accessibility of urban regions and that in the slipstream of such investments, social problems in urban regions can be tackled as well. Despite these contrasting views, there is at least a consensus that transport infrastructure development depends on economic development and vice versa. Yet, in many cases, the method of assessing economic impacts highly affects the results. Therefore, this paper focuses on a critical reflection of methods for estimating economic effects of infrastructure investments. A critical evaluation is made based on Indonesian and Japanese cases. After conducting in-depth desk research on both cases, we found that the broader effects on affected group of people tend to be overlooked due to the problems of time and space dimensions, the chain reaction of effects, and inappropriate data practices. The assessment on the appraisal processes tends to overlook the broader economic implication due to narrow focus and the concept of efficiency of economic theory.
基金The authors would like to acknowledge the funding support of the National Natural Science Foundation of China (Nos. 50579009, 70425001 ) the National 10th Five Year Scientific Project of China for Tackling the Key Problems (2004BA608B-02-02)the Excellence Youth Teacher Sustentation Fund Program of the Ministry of Education of China (Department of Education and Personnel [ 2002 ] 350).
文摘The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of importance in both theory and practice in water resource systems engineering. In order to achieve consistency and eliminate the dimensions of fuzzy qualitative and fuzzy quantitative evaluation indexes, to determine the weights of the indexes objectively, and to increase the differences among the comprehensive evaluation index values of water transportation project schemes, a projection pursuit method, named FPRM-PP for short, was developed in this work for selecting the optimal water transportation project scheme based on the fuzzy preference relation matrix. The research results show that FPRM-PP is intuitive and practical, the correction range of the fuzzy rained is both stable and accurate; preference relation matrix A it produces is relatively small, and the result obtherefore FPRM-PP can be widely used in the optimal selection of different multi-factor decision-making schemes.
基金supported by the National Basic Research Program of China(973 Program)under Grant 2010CB950500 and 2010CB950304the Scientific Research Foundation of the First Institute of Oceanography,State Oceanic Administration(Grant No.GY02-2001G26)the National Natural Science Foundation of China under Grant No.41206026
文摘The summer mean water vapor transport (WVT) and cross-equatorial flow (CEF) over the Asian- Australian monsoon region simulated by 22 coupled atmospheric-oceanic general circulation models (AOGCMs) from the World Climate Research Programme's Coupled Model Intercomparison Project Phase 5 (CMIP5) were evaluated. Based on climatology of the twentieth-century simulations, most of models have a reason- ably realistic representation of summer monsoon WVT characterized by southeast water vapor conveyor belt over the South Indian Ocean and southwest belt from the Arabian Sea to the East Asian. The correlation coefficients between NCEP reanalysis and simulations of BCC-CSMI-1, BNU-ESM, CanESM2, FGOALS-s2, MIROC4h and MPI-ESM-LR are up to 0.8. The simulated CEF depicted by the meridional wind along the equator includes the Somali jet and eastern CEF in low atmosphere and the reverse circulation in upper atmosphere, which were generally consistent with NCEP reanalysis. Multi-model ensemble means (MME) can reproduce more reasonable climatological features in spatial distribution both of WVT and CEF. Ten models with more reasonable WVT simulations were selected for future projection studies, including BCC- CSMI-1, BNU-ESM, CanESM2, CCSM4, FGOALS-s2, FIO-ESM, GFDL-ESM2G, MRIOCS, MPI-ESM-LR and NorESM-1M. Analysis based on the future projection experiments in RCP (Representative Concentra- tion Pathway) 2.6, RCP4.5, RCP6 and RCP8.5 show that the global warming forced by different RCP scenarios will results in enhanced WVT over the Indian area and the west Pacific and weaken WVT in the low latitudes of tropical Indian Ocean.
基金financially supported by China Central Government Fund for Marine Usage Program (No. THY-2011)partly supported by the National Natural Science Fundation of China (No. 41776098)
文摘The tidal asymmetry-induced siltation below tidal barriers is a worldwide problem that restricts regional socio-economic and environmental development. The hydrodynamic processes of the small mud estuary also feature a high uncertainty after estuary restoration measures. In this study, a hydrodynamic model based on the MIKE21 is used to quantify the responses of tidal asymmetry to a two-phase restoration project in Shuanglong Estuary, Bohai Bay, China. According to the numerical modeling results, the tidal flat removal in the upper estuary(first-phase restoration) induces the flood asymmetry switching to the ebb asymmetry in unrestored reach but enhances flood asymmetry in widening restored reach. Although the tidal asymmetry reverts to flood-dominated pattern after full restoration over the estuary, the imbalance between flood and ebb velocities is relieved. A possible net sediment transport pattern based on a comparison of dominant asymmetric current and actual sediment transport period shows net sediments in the upper estuary and inlet transport seaward and landward, respectively, in the first-phase restoration, whereas landward net sediment transport occurs in the whole estuary under the second-phase restoration scenario. Given these results, we assume that a switch from the flood-dominated estuary to ebb-dominated estuary can be caused by redesigning the cross-sectional profile. The quantitative comparison of Lagrangian residual currents also implies that a channel–shoal structure rather than a flat bathymetry can promote the mass transport. Therefore, reshaping the channel–tidal flat system in restoration projects can prevent the sedimentation of the estuary and improve the water environment.
文摘A community engagement project was designed and implemented to reach 10.6 million population in 13 districts of Uttarakhand state—India, to identify presumptive TB patients (PTBPs) and link to free diagnostics services, either through referral or sputum collection and transportation (SCT). The objective of this study is to determine additional yield of TB patients achieved by providing SCT services in comparison to referrals of PTBPs identified in hard-to-reach areas. This was before and after comparative study conducted between April-June 2014 (2Q2014-before) to July-September 2014 (3Q2014-after). SCT was advised for all PTBPs identified from community level interventions between July-September 2014 (3Q2014-after). In 3Q2014, additional 279 (34%) PTBPs were examined in the microscopy centre with an additional 36 (51%) new smear positive (NSP) patient diagnosed. A total of 46 NSP (128%) were contributed by SCT alone. Higher proportion (94%) of TB patients was initiated on treatment in 3Q2014 in comparison to 2Q2014 (91%). SCT as a strategy for early case detection in hard-to-reach difficult terrain yields positive results in comparison to mere referral of PTBPs.
文摘As the specialty of the product and the dim conscio us ness of environmental protection, the status of dirty, chaos and difference is l ong-term existed in the machine process factory. It seriously affects workers’ work and living environment, and restricts the total level of the environment p rotection in our country. The project is the fatal scientific research task of H enan province in 2001. As the members’ endeavor of task group, we have finished the total plan of green project system and some other key equipment to the mach ine process factory, such as the design of conveyer of chip, hydraulic former of chip, rough conveyer and dirt collector. And the green project system is made i nto model that the manufacturer can select. This item is a fire-new work. We ho pe that the expert of machine, environment protection and government official ca n put forward some advices by lodging this article. We contribute for our countr y’ environment protection and make it attain a new level.
文摘This paper introduced the research and development of large-diameter SSAW pipes applied to West-East Pipeline project as well as domestic acicular ferrite pipeline steel of X70 grade. Its microstructure analysis was performed in comparison with the pipeline steel of a foreign steel plant (SPC). This paper introduced the research of welding procedures prior to SSAW pipe making and some new procedures and technologies used for West-East Pipeline Project, and appraised the practical level of Large-diameter SSAW pipe applied to the West-East Pipeline Project.
文摘Land bridge transportation means transportation from one seaport to another by railway across continents instead of by ocean ship. At present, there are two common routes for using land bridge transportation in the world. One is Asia-America-Europe land bridge, the other is Europe-Asia land bridge.Eurasia land bridge has obvious advantages over Asia-America-Europe land bridge due to its shorter distance, shorter transportation time and special freight rate. China started Eurasia land bridge transportation business in 1980. It mainly used the mode of railway-railway combined transportation. The comparison between using Eurasia land bridge and using shipping transportation from China to Northern and Western Europe shows that Euraria land bridge transportation can save time and get foreign exchange in time, and commodity turnover will be speeded up. According to the port layout and railway network structure, China’s land bridge transportation projects are proposed. They are Suifenhe project, Dalian