To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establ...To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establish a three-dimensional model of the box culvert and soil body of the relying project, and three excavation thickness (0m, 1 m, 2 m) were used as the main variation parameters for numerical analysis and research, and the change law of the box culvert itself and soil body stress during the culvert jacking out process was obtained. The results show that the jacking force-displacement curves of the three working conditions can be divided into two stages, and the jacking force reaches the maximum value at the moment when the static friction turns into sliding friction at the end of the first stage. The stress distribution at the bottom slab of the box culvert in the jacking process is approximately normal, and the stress decreases with the increase of the roadbed excavation thickness. The increase of the roadbed excavation thickness can reduce the soil pressure on the side of the box culvert and effectively reduce the deformation of the roadbed in the jacking-out process. The deformation of the roadbed during the jacking process can be reduced by increasing the thickness of the roadbed excavation.展开更多
The background to this research was a flooding incident that occurred in Bridgend, Co. Donegal, Ireland in August 2017. While several properties were flooded, a flooding case study of a single dwelling house adjacent ...The background to this research was a flooding incident that occurred in Bridgend, Co. Donegal, Ireland in August 2017. While several properties were flooded, a flooding case study of a single dwelling house adjacent to the Bridgend River at Riverdale, Bunamayne, Co. Donegal, Ireland is used herein. For this study the flooded site shall be referred to as the “Hegarty property”. A structure in the form of a stone arched culvert is located directly adjacent to the two-storey detached dwelling house on the Hegarty Property. While the culvert is referred to locally as a bridge, within this research the word culvert will be used in connection with the structure. The culvert has a concrete surrounded utility (watermain) crossing at a gradient below the culvert soffit on the upstream face of the structure. The utility obstructed flow through the culvert and contributed to the flooding event. Given the implication of climate change and the increased probability of more extreme flooding events, it was decided to explore the case study to ascertain the factors that contribute to flooding events when utilities are positioned at culvert or bridge structures. This work was completed to assist undergraduate students, researchers, and local authorities in a relatively unknown area of flood causation.展开更多
Compared with traditional cast-in-situ concrete slab culverts,prefabricated reinforced concrete slab culverts can be produced more quickly and has strong quality controllability,strong earthquake resistance,and repeat...Compared with traditional cast-in-situ concrete slab culverts,prefabricated reinforced concrete slab culverts can be produced more quickly and has strong quality controllability,strong earthquake resistance,and repeatability.They will be the primary production method of slab culverts in the future.This article offers a comprehensive review of the design and construction technology associated with prefabricated reinforced concrete slab culverts.The objective is to provide a valuable reference for related enterprises,enhance the quality of design and construction in precast pile configuration,and,in turn,contribute to the advancement of construction projects within our country.展开更多
文摘To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establish a three-dimensional model of the box culvert and soil body of the relying project, and three excavation thickness (0m, 1 m, 2 m) were used as the main variation parameters for numerical analysis and research, and the change law of the box culvert itself and soil body stress during the culvert jacking out process was obtained. The results show that the jacking force-displacement curves of the three working conditions can be divided into two stages, and the jacking force reaches the maximum value at the moment when the static friction turns into sliding friction at the end of the first stage. The stress distribution at the bottom slab of the box culvert in the jacking process is approximately normal, and the stress decreases with the increase of the roadbed excavation thickness. The increase of the roadbed excavation thickness can reduce the soil pressure on the side of the box culvert and effectively reduce the deformation of the roadbed in the jacking-out process. The deformation of the roadbed during the jacking process can be reduced by increasing the thickness of the roadbed excavation.
文摘The background to this research was a flooding incident that occurred in Bridgend, Co. Donegal, Ireland in August 2017. While several properties were flooded, a flooding case study of a single dwelling house adjacent to the Bridgend River at Riverdale, Bunamayne, Co. Donegal, Ireland is used herein. For this study the flooded site shall be referred to as the “Hegarty property”. A structure in the form of a stone arched culvert is located directly adjacent to the two-storey detached dwelling house on the Hegarty Property. While the culvert is referred to locally as a bridge, within this research the word culvert will be used in connection with the structure. The culvert has a concrete surrounded utility (watermain) crossing at a gradient below the culvert soffit on the upstream face of the structure. The utility obstructed flow through the culvert and contributed to the flooding event. Given the implication of climate change and the increased probability of more extreme flooding events, it was decided to explore the case study to ascertain the factors that contribute to flooding events when utilities are positioned at culvert or bridge structures. This work was completed to assist undergraduate students, researchers, and local authorities in a relatively unknown area of flood causation.
文摘Compared with traditional cast-in-situ concrete slab culverts,prefabricated reinforced concrete slab culverts can be produced more quickly and has strong quality controllability,strong earthquake resistance,and repeatability.They will be the primary production method of slab culverts in the future.This article offers a comprehensive review of the design and construction technology associated with prefabricated reinforced concrete slab culverts.The objective is to provide a valuable reference for related enterprises,enhance the quality of design and construction in precast pile configuration,and,in turn,contribute to the advancement of construction projects within our country.