The article mainly studies the application strategy of automatic addressable single-lamp control technology in tunnel lighting.It encompasses an introduction to this technology,an analysis of the tunnel lighting syste...The article mainly studies the application strategy of automatic addressable single-lamp control technology in tunnel lighting.It encompasses an introduction to this technology,an analysis of the tunnel lighting system using automatic addressable single-lamp control technology,and outlines the main development direction for this technology in modern tunnel lighting.The aim is to offer insights that can inform the rational deployment of this technology,thereby enhancing the lighting control effectiveness in modern tunnels and meeting their specific lighting requirements more effectively.展开更多
As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of con...As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of construction technology.This article focuses on the construction technology of the subway tunnel expansion under the bridge foundation.By analyzing the engineering characteristics of the bridge foundation and using a project as an example,this article provides a detailed discussion of the construction process of tunnel expansion under a bridge foundation.This article aims to serve as a reference for subway tunnel construction in China to ensure the key points of construction technology are understood,thus improving construction quality and laying a solid technical foundation for the sustainable development of urban rail engineering.展开更多
In recent years, the invert anomalies of operating railway tunnels in water-rich areas occur frequently,which greatly affect the transportation capacity of the railway lines. Tunnel drainage system is a crucial factor...In recent years, the invert anomalies of operating railway tunnels in water-rich areas occur frequently,which greatly affect the transportation capacity of the railway lines. Tunnel drainage system is a crucial factor to ensure the invert stability by regulating the external water pressure(EWP). By means of a threedimensional(3D) printing model, this paper experimentally investigates the deformation behavior of the invert for the tunnels with the traditional drainage system(TDS) widely used in China and its optimized drainage system(ODS) with bottom drainage function. Six test groups with a total of 110 test conditions were designed to consider the design factors and environmental factors in engineering practice,including layout of the drainage system, blockage of the drainage system and groundwater level fluctuation. It was found that there are significant differences in the water discharge, EWP and invert stability for the tunnels with the two drainage systems. Even with a dense arrangement of the external blind tubes, TDS was still difficult to eliminate the excessive EWP below the invert, which is the main cause for the invert instability. Blockage of drainage system further increased the invert uplift and aggravated the track irregularity, especially when the blockage degree is more than 50%. However, ODS can prevent these invert anomalies by reasonably controlling the EWP at tunnel bottom. Even when the groundwater level reached 60 m and the blind tubes were fully blocked, the invert stability can still be maintained and the railway track experienced a settlement of only 1.8 mm. Meanwhile, the on-site monitoring under several rainstorms further showed that the average EWP of the invert was controlled within 84 k Pa, while the maximum settlement of the track slab was only 0.92 mm, which also was in good agreement with the results of model test.展开更多
Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study pr...Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study presents a combined construction technology that has been developed for use in underground spaces; it includes a deformation buffer layer, a special grouting technique, jump excavation by compart- ment, back-pressure portal frame technology, a reinforcement technique, and the technology of a steel portioning drum or plate. These technologies have been successfully used in practical engineering. The combined construction technology presented in this paper provides a new method of solving key techni- cal problems in underground spaces in effectively used cross-subway tunnels. As this technology has achieved significant economic and social benefits, it has valuable future applications.展开更多
In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel const...In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel construction,but also cause serious safety threat to the construction personnel.Therefore,with the continuous growth in the number and scale of tunnel construction in recent years,the construction technology for high geostress soft rock with large-deformation has begun to receive more and more attention from the society.Based on this,this paper takes an actual project as an example to analyze the specific application of the technology in order to improve the construction effect and avoid the damage caused by the large-deformation of the high geostress soft rock.展开更多
The study of wind erosion processes is of great importance to the prevention and control of soil wind erosion.In this study,three structurally intact soil samples were collected from the steppe of Inner Mongolia Auton...The study of wind erosion processes is of great importance to the prevention and control of soil wind erosion.In this study,three structurally intact soil samples were collected from the steppe of Inner Mongolia Autonomous Region,China and placed in a wind tunnel where they were subjected to six different wind speeds(10,15,17,20,25,and 30 m/s)to simulate wind erosion in the wind tunnel.After each test,the soil surfaces were scanned by a 3D laser scanner to create a high-resolution Digital Elevation Model(DEM),and the changes in wind erosion mass and microtopography were quantified.Based on this,we performed further analysis of wind erosion-controlling factors.The study results showed that the average measurement error between the 3D laser scanning method and weighing method was 6.23%for the three undisturbed soil samples.With increasing wind speed,the microtopography on the undisturbed soil surface first became smooth,and then fine stripes and pits gradually developed.In the initial stage of wind erosion processes,the ability of the soil to resist wind erosion was mainly affected by the soil hardness.In the late stage of wind erosion processes,the degree of soil erosion was mainly affected by soil organic matter and CaCO_(3)content.The results of this study are expected to provide a theoretical basis for soil wind erosion control and promote the application of 3D laser scanners in wind erosion monitoring.展开更多
According to the influence of climatic conditions on vegetable production in the Yangtze River Basin,the existing arched tunnel was improved through investigation to provide guidance for the construction of arched ste...According to the influence of climatic conditions on vegetable production in the Yangtze River Basin,the existing arched tunnel was improved through investigation to provide guidance for the construction of arched steel tunnels in this area.展开更多
In this study,we investigated on the application of planar lightwave circuit(PLC)technology in energy-saving control of tunnel lighting.The application status of PLC in the field of energy saving followed by the neces...In this study,we investigated on the application of planar lightwave circuit(PLC)technology in energy-saving control of tunnel lighting.The application status of PLC in the field of energy saving followed by the necessity of energy saving in tunnel lighting was analyzed.Finally,the application of PLC in tunnel lighting energy-saving control around the three dimensions of system overall architecture design,control scheme,and program control process was investigated.The results showed that the system meets the requirements of control effect,robustness,and visual effect after trial operation,and is suitable for practical applications.展开更多
With the coordinated development of social economy and technology today,various advanced construction techniques and well-established management measures have begun to be widely used in coal-tunnel construction.Howeve...With the coordinated development of social economy and technology today,various advanced construction techniques and well-established management measures have begun to be widely used in coal-tunnel construction.However,in the construction process of low-gas tunnels,it will also cause a certain degree of adverse impact on the construction quality and safety due to the lack of technical experience and management experience to a certain extent.Based on this,this paper takes the actual tunnel project of a coal mine as an example to analyze the main construction technology and safety management measures of low-gas tunnels,so as to provide guarantee for the quality and safety of such tunnel construction.展开更多
Nondestructive testing(NDT)is an advanced and commonly used technique in tunnel engineering quality inspection.To achieve good application of nondestructive testing technology,its main application in tunnel engineerin...Nondestructive testing(NDT)is an advanced and commonly used technique in tunnel engineering quality inspection.To achieve good application of nondestructive testing technology,its main application in tunnel engineering quality inspection strategy is analyzed,including the significance of applying nondestructive testing technology in tunnel engineering quality inspection,the main nondestructive testing technology applied in tunnel engineering quality test analysis,and the analysis of nondestructive testing technology of tunnel engineering quality inspection strategy.The analyses in this paper are done in hopes of providing scientific reference for the utilization of NDT technology and the improvement of tunnel engineering quality.展开更多
With the coordinated development of today's social economy with science and technology,various advanced technologies are being used in highway engineering,especially the distributed intelligent power supply techno...With the coordinated development of today's social economy with science and technology,various advanced technologies are being used in highway engineering,especially the distributed intelligent power supply technology in expressway tunnels,which has a very significant advantage.In order to realize the effective application of this technology and promote the power supply effect in expressway tunnel,this study analyzes the advantages of this technology and its application in expressway tunnel,hoping to provide scientific reference for the application of distributed intelligent power supply technology and the engineering development of expressway tunnels.展开更多
Jinping traffic tunnel is one of the deepest traffic tunnels in the world with a maximum overburden of 2 375 m and the overburden over 73% of its total length is larger than 1 500 m. The tunnel is 17.5 km long and des...Jinping traffic tunnel is one of the deepest traffic tunnels in the world with a maximum overburden of 2 375 m and the overburden over 73% of its total length is larger than 1 500 m. The tunnel is 17.5 km long and designed to provide a shortcut road between two hydropower stations: Jinping I and Jinping II of the Jinping Hydropower Project, located on Yalong River, Liangshan State, Sichuan Province, China. The tunnel is so deep that building any shafts is impossible. The construction starts from both ends (east and west ends), and the construction length from the west end is 10 km with a blind heading. This paper deals with an overview of this project and analysis of the engineering features, as well as key technologies developed and applied during the construction, including geological prediction, rock burst prevention under a super high in-situ stress, sealing of groundwater with a high pressure and big flow rate, ventilation for a blind heading of 10 km, wet spraying of shotcrete at zones of rock burst and rich water, etc. The application of the new technologies to the construction achieved a high quality tunnel within the contract period.展开更多
Water inrush and mud gushing are one of the biggest hazards in tunnel construction. Unfavorable geological sections can be observed in almost all railway tunnels under construction or to be constructed, and vary in ex...Water inrush and mud gushing are one of the biggest hazards in tunnel construction. Unfavorable geological sections can be observed in almost all railway tunnels under construction or to be constructed, and vary in extent. Furthermore, due to the different heights of mountains and the lengths of tunnels, the locations of the unfavorable geological sections cannot be fully determined before construction, which increases the risk of water inrush and mud gushing. Based on numerous cases of water inrush and mud gushing in railway tunnels, the paper tries to classify water inrush and mud gushing in railway tunnels in view of the conditions of the surrounding rocks and meteorological factors associated with tunnel excavation. In addition, the causes of water inrush and mud gushing in combination of macroand micromechanisms are summarized, and site-specifc treatment method is put forward. The treatment methods include choosing a method of advance geological forecast according to risk degrees of different sections in the tunnel, determining the items of predictions, and choosing the appropriate methods, i.e. draining-oriented method, blocking-oriented method or draining-and-blocking method. The treatment technologies of railway water inrush and mud gushing are also summarized, including energy relief and pressure relief technology, advance grouting technology, and advance jet grouting technology associated with their key technical features and applicable conditions. The results in terms of treatment methods can provide reference to the prevention and treatment of tunnel water inrush and mud gushing.展开更多
A specially designed experiment is performed for investigating gate-induced drain leakage (GIDL) current in 90nm CMOS technology using lightly-doped drain (LDD) NMOSFET. This paper shows that the drain bias VD has...A specially designed experiment is performed for investigating gate-induced drain leakage (GIDL) current in 90nm CMOS technology using lightly-doped drain (LDD) NMOSFET. This paper shows that the drain bias VD has a strong effect on GIDL current as compared with the gate bias VG at the same drain-gate voltage VDG. It is found that the difference between ID in the off-state ID - VG characteristics and the corresponding one in the off-state ID - VD characteristics, which is defined as IDIFF, versus VDG shows a peak. The difference between the influences of VD and VG on GIDL current is shown quantitatively by IDIFF, especially in 90nm scale. The difference is due to different hole tunnellings, Furthermore, the maximum IDIFF(IDIFF,MAX) varies linearly with VDG in logarithmic coordiuates and also VDG at IDIFF,MAX with VF which is the characteristic voltage of IDIFF, The relations are studied and some related expressions are given.展开更多
Based on the construction of high risk tunnels in Guiguang-Guangzhou high-speed railway, several new technologies were developed for high-risk tunnel con- struction. First, an integrated advanced geological predic- ti...Based on the construction of high risk tunnels in Guiguang-Guangzhou high-speed railway, several new technologies were developed for high-risk tunnel con- struction. First, an integrated advanced geological predic- tion was developed for tunneling in karst area. Then, a new system of ventilation by involving the dedusting technol- ogy was proposed and used in the field, which received a good air quality. Finally, a method to minimize the dis- tance between the working face and the invert installation was proposed by optimizing the invert installation and adopting the micro bench method. Applying the method to the project obtained an excellent result. The achievement obtained for this study would be able to provide a valuable reference to similar projects in the future.展开更多
The stockpiling,delivery,and provision of emergency material were in the public gaze of millions of people when the coronavirus disease 2019(COVID-19)broke out.Civil-military integra-tion emergency logistics silently ...The stockpiling,delivery,and provision of emergency material were in the public gaze of millions of people when the coronavirus disease 2019(COVID-19)broke out.Civil-military integra-tion emergency logistics silently opened up the“second battlefield”of anti-epidemic,and estab-lished a lifeline under that emergency situation.Research on the construction of civil-military integ-rated logistics system plays an extremely important role and occupies a significant position in en-suring social stability and security as well as the stable development of social economy in China.The modern economy driven by the Internet,Internet of Things,and big data demonstrates a rap-id growing trend calling for efficient,fast,and convenient logistics.It is urgent to upgrade or build an intelligent logistics system with intelligent technology and unmanned technology as the core to meet the international and domestic market demand.As mentioned above,this paper analyzes and expounds the construction problem and practical significance of civil-military integration emer-gency logistics system based on unmanned technology,and puts forward the strategy of construct-ing civil-military integration emergency logistics system with unmanned technology under the new system.展开更多
One of the major challenges in designing and fabricating Spintronic devices is the choice of both, Materials and the Technology, along with understanding the intricacies of the Designing aspects. In this communication...One of the major challenges in designing and fabricating Spintronic devices is the choice of both, Materials and the Technology, along with understanding the intricacies of the Designing aspects. In this communication, we have attempted to briefly discuss these factors, with an aim to draw the attention of the Materials Scientists and Technologists to this serious challenge, in the direction of which, though a lot of research and development work has been done, still needs more concerted efforts to be made in order to make the Spintronic devices that can offer good efficiency for maximizing their usefulness.展开更多
Typical existing methods of tunnel geological prediction include negative apparent velocity, horizontal seismic profile, and the Tunnel Seismic Prediction (TSP) method as this technology is under development at home...Typical existing methods of tunnel geological prediction include negative apparent velocity, horizontal seismic profile, and the Tunnel Seismic Prediction (TSP) method as this technology is under development at home and abroad. Considering simpler observational methods and data processing, it is hard to accurately determine the seismic velocity of the wall rock in the front of the tunnel face. Therefore, applying these defective methods may result in inaccurate geological inferences which will not provide sufficient evidence for classifying the wall rock characteristics. This paper proposes the Tunnel Seismic Tomography (TST) method using a spatial observation arrangement and migration and travel time inversion image processing to solve the problem of analyzing the velocity structure of wall rock in the front of the tunnel face and realize accurate imaging of the geological framework of the tunnel wall rock. This method is very appropriate for geological prediction under complex geological conditions.展开更多
Through the experience of applicatingshield tunnel in power plant’s water inlet andoutlet project, this paper introduces designand construction technology of shield tunnel.
文摘The article mainly studies the application strategy of automatic addressable single-lamp control technology in tunnel lighting.It encompasses an introduction to this technology,an analysis of the tunnel lighting system using automatic addressable single-lamp control technology,and outlines the main development direction for this technology in modern tunnel lighting.The aim is to offer insights that can inform the rational deployment of this technology,thereby enhancing the lighting control effectiveness in modern tunnels and meeting their specific lighting requirements more effectively.
文摘As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of construction technology.This article focuses on the construction technology of the subway tunnel expansion under the bridge foundation.By analyzing the engineering characteristics of the bridge foundation and using a project as an example,this article provides a detailed discussion of the construction process of tunnel expansion under a bridge foundation.This article aims to serve as a reference for subway tunnel construction in China to ensure the key points of construction technology are understood,thus improving construction quality and laying a solid technical foundation for the sustainable development of urban rail engineering.
基金supported by the National Natural Science Foundation of China (Grant No. U1934211)the Open Foundation of National Engineering Research Center of High-speed Railway Construction Technology (Grant No. HSR202005)Scientific Research Project of Hunan Education Department (Grant No.20B596)。
文摘In recent years, the invert anomalies of operating railway tunnels in water-rich areas occur frequently,which greatly affect the transportation capacity of the railway lines. Tunnel drainage system is a crucial factor to ensure the invert stability by regulating the external water pressure(EWP). By means of a threedimensional(3D) printing model, this paper experimentally investigates the deformation behavior of the invert for the tunnels with the traditional drainage system(TDS) widely used in China and its optimized drainage system(ODS) with bottom drainage function. Six test groups with a total of 110 test conditions were designed to consider the design factors and environmental factors in engineering practice,including layout of the drainage system, blockage of the drainage system and groundwater level fluctuation. It was found that there are significant differences in the water discharge, EWP and invert stability for the tunnels with the two drainage systems. Even with a dense arrangement of the external blind tubes, TDS was still difficult to eliminate the excessive EWP below the invert, which is the main cause for the invert instability. Blockage of drainage system further increased the invert uplift and aggravated the track irregularity, especially when the blockage degree is more than 50%. However, ODS can prevent these invert anomalies by reasonably controlling the EWP at tunnel bottom. Even when the groundwater level reached 60 m and the blind tubes were fully blocked, the invert stability can still be maintained and the railway track experienced a settlement of only 1.8 mm. Meanwhile, the on-site monitoring under several rainstorms further showed that the average EWP of the invert was controlled within 84 k Pa, while the maximum settlement of the track slab was only 0.92 mm, which also was in good agreement with the results of model test.
文摘Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study presents a combined construction technology that has been developed for use in underground spaces; it includes a deformation buffer layer, a special grouting technique, jump excavation by compart- ment, back-pressure portal frame technology, a reinforcement technique, and the technology of a steel portioning drum or plate. These technologies have been successfully used in practical engineering. The combined construction technology presented in this paper provides a new method of solving key techni- cal problems in underground spaces in effectively used cross-subway tunnels. As this technology has achieved significant economic and social benefits, it has valuable future applications.
文摘In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel construction,but also cause serious safety threat to the construction personnel.Therefore,with the continuous growth in the number and scale of tunnel construction in recent years,the construction technology for high geostress soft rock with large-deformation has begun to receive more and more attention from the society.Based on this,this paper takes an actual project as an example to analyze the specific application of the technology in order to improve the construction effect and avoid the damage caused by the large-deformation of the high geostress soft rock.
基金supported by National Natural Science Foundation of China(41871010)The Second Comprehensive Scientific Expedition to the Qinghai-Tibet Plateau of China(2019QZKK0906)。
文摘The study of wind erosion processes is of great importance to the prevention and control of soil wind erosion.In this study,three structurally intact soil samples were collected from the steppe of Inner Mongolia Autonomous Region,China and placed in a wind tunnel where they were subjected to six different wind speeds(10,15,17,20,25,and 30 m/s)to simulate wind erosion in the wind tunnel.After each test,the soil surfaces were scanned by a 3D laser scanner to create a high-resolution Digital Elevation Model(DEM),and the changes in wind erosion mass and microtopography were quantified.Based on this,we performed further analysis of wind erosion-controlling factors.The study results showed that the average measurement error between the 3D laser scanning method and weighing method was 6.23%for the three undisturbed soil samples.With increasing wind speed,the microtopography on the undisturbed soil surface first became smooth,and then fine stripes and pits gradually developed.In the initial stage of wind erosion processes,the ability of the soil to resist wind erosion was mainly affected by the soil hardness.In the late stage of wind erosion processes,the degree of soil erosion was mainly affected by soil organic matter and CaCO_(3)content.The results of this study are expected to provide a theoretical basis for soil wind erosion control and promote the application of 3D laser scanners in wind erosion monitoring.
基金Supported by the Special Fund of China Agricultural Research System(CARS-23)
文摘According to the influence of climatic conditions on vegetable production in the Yangtze River Basin,the existing arched tunnel was improved through investigation to provide guidance for the construction of arched steel tunnels in this area.
文摘In this study,we investigated on the application of planar lightwave circuit(PLC)technology in energy-saving control of tunnel lighting.The application status of PLC in the field of energy saving followed by the necessity of energy saving in tunnel lighting was analyzed.Finally,the application of PLC in tunnel lighting energy-saving control around the three dimensions of system overall architecture design,control scheme,and program control process was investigated.The results showed that the system meets the requirements of control effect,robustness,and visual effect after trial operation,and is suitable for practical applications.
文摘With the coordinated development of social economy and technology today,various advanced construction techniques and well-established management measures have begun to be widely used in coal-tunnel construction.However,in the construction process of low-gas tunnels,it will also cause a certain degree of adverse impact on the construction quality and safety due to the lack of technical experience and management experience to a certain extent.Based on this,this paper takes the actual tunnel project of a coal mine as an example to analyze the main construction technology and safety management measures of low-gas tunnels,so as to provide guarantee for the quality and safety of such tunnel construction.
文摘Nondestructive testing(NDT)is an advanced and commonly used technique in tunnel engineering quality inspection.To achieve good application of nondestructive testing technology,its main application in tunnel engineering quality inspection strategy is analyzed,including the significance of applying nondestructive testing technology in tunnel engineering quality inspection,the main nondestructive testing technology applied in tunnel engineering quality test analysis,and the analysis of nondestructive testing technology of tunnel engineering quality inspection strategy.The analyses in this paper are done in hopes of providing scientific reference for the utilization of NDT technology and the improvement of tunnel engineering quality.
文摘With the coordinated development of today's social economy with science and technology,various advanced technologies are being used in highway engineering,especially the distributed intelligent power supply technology in expressway tunnels,which has a very significant advantage.In order to realize the effective application of this technology and promote the power supply effect in expressway tunnel,this study analyzes the advantages of this technology and its application in expressway tunnel,hoping to provide scientific reference for the application of distributed intelligent power supply technology and the engineering development of expressway tunnels.
文摘Jinping traffic tunnel is one of the deepest traffic tunnels in the world with a maximum overburden of 2 375 m and the overburden over 73% of its total length is larger than 1 500 m. The tunnel is 17.5 km long and designed to provide a shortcut road between two hydropower stations: Jinping I and Jinping II of the Jinping Hydropower Project, located on Yalong River, Liangshan State, Sichuan Province, China. The tunnel is so deep that building any shafts is impossible. The construction starts from both ends (east and west ends), and the construction length from the west end is 10 km with a blind heading. This paper deals with an overview of this project and analysis of the engineering features, as well as key technologies developed and applied during the construction, including geological prediction, rock burst prevention under a super high in-situ stress, sealing of groundwater with a high pressure and big flow rate, ventilation for a blind heading of 10 km, wet spraying of shotcrete at zones of rock burst and rich water, etc. The application of the new technologies to the construction achieved a high quality tunnel within the contract period.
文摘Water inrush and mud gushing are one of the biggest hazards in tunnel construction. Unfavorable geological sections can be observed in almost all railway tunnels under construction or to be constructed, and vary in extent. Furthermore, due to the different heights of mountains and the lengths of tunnels, the locations of the unfavorable geological sections cannot be fully determined before construction, which increases the risk of water inrush and mud gushing. Based on numerous cases of water inrush and mud gushing in railway tunnels, the paper tries to classify water inrush and mud gushing in railway tunnels in view of the conditions of the surrounding rocks and meteorological factors associated with tunnel excavation. In addition, the causes of water inrush and mud gushing in combination of macroand micromechanisms are summarized, and site-specifc treatment method is put forward. The treatment methods include choosing a method of advance geological forecast according to risk degrees of different sections in the tunnel, determining the items of predictions, and choosing the appropriate methods, i.e. draining-oriented method, blocking-oriented method or draining-and-blocking method. The treatment technologies of railway water inrush and mud gushing are also summarized, including energy relief and pressure relief technology, advance grouting technology, and advance jet grouting technology associated with their key technical features and applicable conditions. The results in terms of treatment methods can provide reference to the prevention and treatment of tunnel water inrush and mud gushing.
基金Project supported by the National High Technology Research and Development Program of China (Grant No 2003AA1Z1630) and the National Natural Science Foundation of China (Grant No 60376024).
文摘A specially designed experiment is performed for investigating gate-induced drain leakage (GIDL) current in 90nm CMOS technology using lightly-doped drain (LDD) NMOSFET. This paper shows that the drain bias VD has a strong effect on GIDL current as compared with the gate bias VG at the same drain-gate voltage VDG. It is found that the difference between ID in the off-state ID - VG characteristics and the corresponding one in the off-state ID - VD characteristics, which is defined as IDIFF, versus VDG shows a peak. The difference between the influences of VD and VG on GIDL current is shown quantitatively by IDIFF, especially in 90nm scale. The difference is due to different hole tunnellings, Furthermore, the maximum IDIFF(IDIFF,MAX) varies linearly with VDG in logarithmic coordiuates and also VDG at IDIFF,MAX with VF which is the characteristic voltage of IDIFF, The relations are studied and some related expressions are given.
文摘Based on the construction of high risk tunnels in Guiguang-Guangzhou high-speed railway, several new technologies were developed for high-risk tunnel con- struction. First, an integrated advanced geological predic- tion was developed for tunneling in karst area. Then, a new system of ventilation by involving the dedusting technol- ogy was proposed and used in the field, which received a good air quality. Finally, a method to minimize the dis- tance between the working face and the invert installation was proposed by optimizing the invert installation and adopting the micro bench method. Applying the method to the project obtained an excellent result. The achievement obtained for this study would be able to provide a valuable reference to similar projects in the future.
基金supported in part by the National Natural Sci-ence Foundation of China(Nos.62088101,62103015)in part by Beijing Institute of Technology Research Fund Program for Young Scholars(Nos.XSQD-202121004,XSQD-202121009).
文摘The stockpiling,delivery,and provision of emergency material were in the public gaze of millions of people when the coronavirus disease 2019(COVID-19)broke out.Civil-military integra-tion emergency logistics silently opened up the“second battlefield”of anti-epidemic,and estab-lished a lifeline under that emergency situation.Research on the construction of civil-military integ-rated logistics system plays an extremely important role and occupies a significant position in en-suring social stability and security as well as the stable development of social economy in China.The modern economy driven by the Internet,Internet of Things,and big data demonstrates a rap-id growing trend calling for efficient,fast,and convenient logistics.It is urgent to upgrade or build an intelligent logistics system with intelligent technology and unmanned technology as the core to meet the international and domestic market demand.As mentioned above,this paper analyzes and expounds the construction problem and practical significance of civil-military integration emer-gency logistics system based on unmanned technology,and puts forward the strategy of construct-ing civil-military integration emergency logistics system with unmanned technology under the new system.
文摘One of the major challenges in designing and fabricating Spintronic devices is the choice of both, Materials and the Technology, along with understanding the intricacies of the Designing aspects. In this communication, we have attempted to briefly discuss these factors, with an aim to draw the attention of the Materials Scientists and Technologists to this serious challenge, in the direction of which, though a lot of research and development work has been done, still needs more concerted efforts to be made in order to make the Spintronic devices that can offer good efficiency for maximizing their usefulness.
文摘Typical existing methods of tunnel geological prediction include negative apparent velocity, horizontal seismic profile, and the Tunnel Seismic Prediction (TSP) method as this technology is under development at home and abroad. Considering simpler observational methods and data processing, it is hard to accurately determine the seismic velocity of the wall rock in the front of the tunnel face. Therefore, applying these defective methods may result in inaccurate geological inferences which will not provide sufficient evidence for classifying the wall rock characteristics. This paper proposes the Tunnel Seismic Tomography (TST) method using a spatial observation arrangement and migration and travel time inversion image processing to solve the problem of analyzing the velocity structure of wall rock in the front of the tunnel face and realize accurate imaging of the geological framework of the tunnel wall rock. This method is very appropriate for geological prediction under complex geological conditions.
文摘Through the experience of applicatingshield tunnel in power plant’s water inlet andoutlet project, this paper introduces designand construction technology of shield tunnel.