期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
Attosecond ionization time delays in strong-field physics
1
作者 马永哲 倪宏程 吴健 《Chinese Physics B》 SCIE EI CAS CSCD 2024年第1期102-121,共20页
Electronic processes within atoms and molecules reside on the timescale of attoseconds. Recent advances in the laserbased pump-probe interrogation techniques have made possible the temporal resolution of ultrafast ele... Electronic processes within atoms and molecules reside on the timescale of attoseconds. Recent advances in the laserbased pump-probe interrogation techniques have made possible the temporal resolution of ultrafast electronic processes on the attosecond timescale, including photoionization and tunneling ionization. These interrogation techniques include the attosecond streak camera, the reconstruction of attosecond beating by interference of two-photon transitions, and the attoclock. While the former two are usually employed to study photoionization processes, the latter is typically used to investigate tunneling ionization. In this review, we briefly overview these timing techniques towards an attosecond temporal resolution of ionization processes in atoms and molecules under intense laser fields. In particular, we review the backpropagation method, which is a novel hybrid quantum-classical approach towards the full characterization of tunneling ionization dynamics. Continued advances in the interrogation techniques promise to pave the pathway towards the exploration of ever faster dynamical processes on an ever shorter timescale. 展开更多
关键词 strong-field ionization ATTOSECOND time delay photoionization time delay tunneling time delay attosecond streak camera reconstruction of attosecond beating by interference of two-photon transitions(RABBITT) attoclock backpropagation
下载PDF
General way to define tunneling time
2
作者 Zheng Shu Xiaolei Hao +1 位作者 Weidong Li Jing Chen 《Chinese Physics B》 SCIE EI CAS CSCD 2019年第5期27-31,共5页
With the development of attosecond science, tunneling time can now be measured experimentally with the attoclock technique. However, there are many different theoretical definitions of tunneling time and no consensus ... With the development of attosecond science, tunneling time can now be measured experimentally with the attoclock technique. However, there are many different theoretical definitions of tunneling time and no consensus has been achieved.Here, we bridge the relationship between different definitions of tunneling time based on a quantum travel time in onedimensional rectangular barrier tunneling problem. We find that the real quantum travel time t_(Re) is equal to the Bohmian time t_(Bohmian), which is related to the resonance lifetime of a bound state. The total quantum travel time τt can perfectly retrieve the transversal time t_x and the Büttiker–Landauer time τ_(BL) in two opposite limits, regardless of the particle energy. 展开更多
关键词 tunneling time Büttiker–Landauer time Bohmian time
下载PDF
On the tunneling time of arbitrary continuous potentials and the Hartman effect
3
作者 殷澄 吴至境 +2 位作者 王贤平 孙晶晶 曹庄琪 《Chinese Physics B》 SCIE EI CAS CSCD 2010年第11期593-596,共4页
This paper obtains a generalized tunneling time of one-dimensional potentials via time reversal invariance. It also proposes a simple explanation for the Hartman effect using the useful concept of the scattered subwaves.
关键词 tunneling time analytical transfer matrix method
下载PDF
Acoustic emission monitoring of rockbursts during TBM-excavated headrace tunneling at Jinping Ⅱ hydropower station 被引量:7
4
作者 Wuwei Cheng Wenyou Wang +1 位作者 Shiqiang Huang Peng Ma 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第6期486-494,共9页
To better understand the mechanical properties of marble at Jinping II hydropower station, this paper examines the changes of brittle rocks in excavation damaged zones(EDZs) before and after excavation of tunnel with ... To better understand the mechanical properties of marble at Jinping II hydropower station, this paper examines the changes of brittle rocks in excavation damaged zones(EDZs) before and after excavation of tunnel with the tunnel boring machine(TBM). The paper attempts to employ the acoustic emission(AE) to study the AE characteristics and distribution of rockburst before and after TBM-excavated tunnel. It is known that the headrace tunnel #2, excavated by the drill-and-blast(D&B) method, is ahead of the headrace tunnel #3 that is excavated by TBM method. The experimental sub-tunnel #2–1, about 2000 m in depth and 13 m in diameter, between the two tunnels is scheduled. In the experimental sub-tunnel #2–1, a large number of experimental boreholes are arranged, and AE sensors are installed within 10 m apart from the wall of the headrace tunnel #3. By tracking the microseismic signals in rocks, the location, frequency, quantity, scope and intensity of the microseismic signals are basically identifed. It is observed that the AE signals mainly occur within 5 m around the rock wall, basically lasting for one day before tunnel excavation and a week after excavation. Monitoring results indicate that the rockburst signals are closely related to rock stress adjustment. The rock structure has a rapid self-adjustment capacity before and after a certain period of time during tunneling. The variations of rock stresses would last for a long time before reaching a fnal steady state. Based on this, the site-specifc support parameters for the deep tunnels can be accordingly optimized. 展开更多
关键词 Acoustic emission(AE) monitoring Tunnel construction Microseismic event Relaxation time Rockbursts
下载PDF
Probabilistic prediction of expected ground condition and construction time and costs in road tunnels 被引量:4
5
作者 A.Mahmoodzadeh S.Zare 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第5期734-745,共12页
Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic est... Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC) simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding. 展开更多
关键词 Markov process Geological condition Monte-Carlo (MC) simulation Construction time and costs Hamro tunnel
下载PDF
Uncertainty principle in larmor clock
6
作者 乔川 任中洲 《Chinese Physics C》 SCIE CAS CSCD 2011年第11期992-996,共5页
It is well known that the spin operators of a quantum particle must obey uncertainty relations. We use the uncertainty principle to study the Larmor clock. To avoid breaking the uncertainty principle, Larmor time can ... It is well known that the spin operators of a quantum particle must obey uncertainty relations. We use the uncertainty principle to study the Larmor clock. To avoid breaking the uncertainty principle, Larmor time can be defined as the ratio of the phase difference between a spin-up particle and a spin-down particle to the corresponding Larmor frequency. The connection between the dwell time and the Larmor time has also been confirmed. Moreover, the results show that the behavior of the Larmor time depends on the height and width of the barrier. 展开更多
关键词 tunneling time Larmor clock Larmor time uncertainty principle
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部