In this study,a two-dimensional(2D)soil–water coupling dynamicfinite element(FE)analysis is conducted to investigate the effect of repeated train vibrations on the long-term settlement of a metro tunnel in saturated c...In this study,a two-dimensional(2D)soil–water coupling dynamicfinite element(FE)analysis is conducted to investigate the effect of repeated train vibrations on the long-term settlement of a metro tunnel in saturated clay.Particular attention is paid to the leakage prob-lem of the metro tunnel by assuming different permeability conditions,namely fully permeable,fully impermeable,and partially perme-able,on the periphery of the tunnel for simplicity.The train vibration load isfirst evaluated using a rail–fastener–tunnel–subgrade model and averaged over a characteristic length for 2D numerical analysis.Cyclic Mobility model is used to simulate the mechanical behaviors of saturated soft clay in the FE analysis.Excess pore water pressure(EPWP)and associated tunnel settlement in trial operation and normal operation are calculated using the FE code DBLEAVES for different permeability conditions.It is found that a very low EPWP is generated in the trial operation,which then increases rapidly to peak values at the early days of normal operation.Afterward,the EPWP diminishes gradually as the train vibration continues.The permeability of the tunnel lining plays a significant role in the distri-bution of EPWP around the tunnel but produces a minor influence on the development of tunnel settlement.The train-induced tunnel settlement is mainly caused by the static settlement resulting from the EPWP dissipation during train interval,while the dynamic settle-ment arising from dynamic consolidation in each train vibration only accounts for a small portion.According to the 2D dynamic FE analysis,thefinal train-induced settlement of the metro tunnel in saturated clay is estimated to reach 160 mm while the peak EPWP value can reach 26.55 kPa.The settlement discrepancies between the numerical method and empirical method are discussed in detail.展开更多
基金supported by the Natural Science Foundation of China(NSFC Grant No.51538009)。
文摘In this study,a two-dimensional(2D)soil–water coupling dynamicfinite element(FE)analysis is conducted to investigate the effect of repeated train vibrations on the long-term settlement of a metro tunnel in saturated clay.Particular attention is paid to the leakage prob-lem of the metro tunnel by assuming different permeability conditions,namely fully permeable,fully impermeable,and partially perme-able,on the periphery of the tunnel for simplicity.The train vibration load isfirst evaluated using a rail–fastener–tunnel–subgrade model and averaged over a characteristic length for 2D numerical analysis.Cyclic Mobility model is used to simulate the mechanical behaviors of saturated soft clay in the FE analysis.Excess pore water pressure(EPWP)and associated tunnel settlement in trial operation and normal operation are calculated using the FE code DBLEAVES for different permeability conditions.It is found that a very low EPWP is generated in the trial operation,which then increases rapidly to peak values at the early days of normal operation.Afterward,the EPWP diminishes gradually as the train vibration continues.The permeability of the tunnel lining plays a significant role in the distri-bution of EPWP around the tunnel but produces a minor influence on the development of tunnel settlement.The train-induced tunnel settlement is mainly caused by the static settlement resulting from the EPWP dissipation during train interval,while the dynamic settle-ment arising from dynamic consolidation in each train vibration only accounts for a small portion.According to the 2D dynamic FE analysis,thefinal train-induced settlement of the metro tunnel in saturated clay is estimated to reach 160 mm while the peak EPWP value can reach 26.55 kPa.The settlement discrepancies between the numerical method and empirical method are discussed in detail.