Condition monitoring is increasingly used to anticipate and detect failures of industrial machines.Failures of machines can cause high maintenance or replacement costs.If neglected,it may result in catastrophic accide...Condition monitoring is increasingly used to anticipate and detect failures of industrial machines.Failures of machines can cause high maintenance or replacement costs.If neglected,it may result in catastrophic accidents leading to production shrinkage.The potential failure would negatively affect the profitability of the company,including production shut down,cost of spare parts,cost of labor,damage of reputation,risk of injury to people and the environment.In recent years,condition-based maintenance( CBM) and prognostic and health management( PHM) are developed and formed a strong connection among science,engineering,computer,reliability,communication,management,etc.Computerized maintenance management systems( CMMS) store a lot of data regarding the fault diagnosis and life prediction of the machinery equipment.It's too necessary to uncover useful knowledge from the huge amount of data.It's vital to find the ways to obtain useful and concise information from these data.This information can be of great influence in the decision making of managers.This article is a review of intelligent approaches in machinery faults diagnosis and prediction based on PHM and CBM.展开更多
With a rapidly ageing population in Singapore, older adults and their family members face challenges of age-related diseases, caregiver stress, and increasing demand for caregiving services. To address this pressing i...With a rapidly ageing population in Singapore, older adults and their family members face challenges of age-related diseases, caregiver stress, and increasing demand for caregiving services. To address this pressing issue, this pilot study aims to introduce online health coaching for older adults in Singapore and evaluate its effectiveness on maintenance of personal healthcare. In the midst of the COVID-19 outbreak, older adults’ activities were largely restricted by measures on social distancing. The online health coaching provided a solution for older adults to achieve a healthy lifestyle in a contactless manner. In this pilot study, 18 older adults (≥55 years old) who were willing to be coached by trained health coaches (n = 10) for 8 weeks (once a week) were recruited. Pre- and post-surveys with older adults were conducted. Furthermore, health coaching booklet was used to control the quality of coaching and to record diet and exercise plans. The pilot study demonstrated that the health coaching provided older adults with knowledge of nutrition and exercise, raised their awareness of well-being in terms of daily meals and regular exercise, and provided an alternative to maintain a healthy lifestyle amidst global pandemic. Additionally, we also identified that the older adults’ satisfactions with health coaching were positively associated with educational levels (R<sup>2</sup> = 0.31). Lastly, this pilot study highlighted that health coaching standardization process for older adults is critical for researchers and healthcare practitioners in the future.展开更多
Aerobic Treatment Units (ATU) and Greywater Treatment Systems (GTS) are onsite wastewater treatment systems (OWTS) designed to treat wastewater to secondary effluent quality standards. Consequently, the electrical, me...Aerobic Treatment Units (ATU) and Greywater Treatment Systems (GTS) are onsite wastewater treatment systems (OWTS) designed to treat wastewater to secondary effluent quality standards. Consequently, the electrical, mechanical and chemical components of these OWTS need to be regularly maintained to ensure their consistent and reliable operation to the required standards. In Western Australia (WA), the Department of Health set out the regulatory requirements for the maintenance of OWTS as well as when and how it is to occur. This paper reviews the maintenance requirements for ATU and GTS in WA and provides recommendations for the proposed changes in guidelines and regulations. State and national guidelines were reviewed and information from industry and regulators was obtained through surveys. The review found that although the guidelines are generally satisfactory there are a number of areas which could be improved and specific recommendations are discussed.展开更多
When the bridge components needing maintenance are the world problem at present,and the health monitoring system is considered to be a very helpful tool for solving this problem.In this paper,a large number of s...When the bridge components needing maintenance are the world problem at present,and the health monitoring system is considered to be a very helpful tool for solving this problem.In this paper,a large number of strain data acquired from the structural health monitoring system(SHMS)installed on a continuous rigid frame bridge are adopted to do reliability assessment.Firstly,a calculation method of punctiform time-dependent reliability is proposed based on the basic reliability theory,and introduced how to calculate reliability of the bridge by using the stress data transformed from the strain data.Secondly,combined with“Three Sigma”principle and the basic pressure safety reserve requirement,the critical load effects distribution function of the bridge is defined,and then the maintenance reliability threshold for controlling the unfavorable load state which appears in the early operation stage of this type bridge is suggested,and then the combination of bridge maintenance management and health monitoring system is realized.Finally,the transformed stress distribution certifies that the load effects of concrete bridges practically have a normal distribution;as for the concrete continuous rigid frame bridge with C50 strength grade concrete,the retrofit reliability threshold should be valued at 6.13.The methodology suggested in this article can help bridge engineers do effective maintenance of bridges,which can effectively extend the service life of the bridge and bring better economic and social benefits.展开更多
An accurate and objective assessment of the health status of EMU trains is of great importance.In order to make sure the trains are functional,reliable,and endurable in their full life cycle(FLC),health assessment met...An accurate and objective assessment of the health status of EMU trains is of great importance.In order to make sure the trains are functional,reliable,and endurable in their full life cycle(FLC),health assessment method for EMU trains after Level 3-5 maintenance and repair is studied.First,the element-selection principles and the assessment rules are defined;second,to present the complex topological relationship between the elements in assessment,a functional logical structure construction method is proposed;third,a health value calculation model is defined based on the element’s characteristics and their logical structures.The health variables of each element is calculated and fitted following the steps in the corresponding weight calculation methods.The assessment method is proved to be applicable and effective.展开更多
基金Fundamental Research Funds for the Central Universities,China(No.DUT17GF214)
文摘Condition monitoring is increasingly used to anticipate and detect failures of industrial machines.Failures of machines can cause high maintenance or replacement costs.If neglected,it may result in catastrophic accidents leading to production shrinkage.The potential failure would negatively affect the profitability of the company,including production shut down,cost of spare parts,cost of labor,damage of reputation,risk of injury to people and the environment.In recent years,condition-based maintenance( CBM) and prognostic and health management( PHM) are developed and formed a strong connection among science,engineering,computer,reliability,communication,management,etc.Computerized maintenance management systems( CMMS) store a lot of data regarding the fault diagnosis and life prediction of the machinery equipment.It's too necessary to uncover useful knowledge from the huge amount of data.It's vital to find the ways to obtain useful and concise information from these data.This information can be of great influence in the decision making of managers.This article is a review of intelligent approaches in machinery faults diagnosis and prediction based on PHM and CBM.
文摘With a rapidly ageing population in Singapore, older adults and their family members face challenges of age-related diseases, caregiver stress, and increasing demand for caregiving services. To address this pressing issue, this pilot study aims to introduce online health coaching for older adults in Singapore and evaluate its effectiveness on maintenance of personal healthcare. In the midst of the COVID-19 outbreak, older adults’ activities were largely restricted by measures on social distancing. The online health coaching provided a solution for older adults to achieve a healthy lifestyle in a contactless manner. In this pilot study, 18 older adults (≥55 years old) who were willing to be coached by trained health coaches (n = 10) for 8 weeks (once a week) were recruited. Pre- and post-surveys with older adults were conducted. Furthermore, health coaching booklet was used to control the quality of coaching and to record diet and exercise plans. The pilot study demonstrated that the health coaching provided older adults with knowledge of nutrition and exercise, raised their awareness of well-being in terms of daily meals and regular exercise, and provided an alternative to maintain a healthy lifestyle amidst global pandemic. Additionally, we also identified that the older adults’ satisfactions with health coaching were positively associated with educational levels (R<sup>2</sup> = 0.31). Lastly, this pilot study highlighted that health coaching standardization process for older adults is critical for researchers and healthcare practitioners in the future.
文摘Aerobic Treatment Units (ATU) and Greywater Treatment Systems (GTS) are onsite wastewater treatment systems (OWTS) designed to treat wastewater to secondary effluent quality standards. Consequently, the electrical, mechanical and chemical components of these OWTS need to be regularly maintained to ensure their consistent and reliable operation to the required standards. In Western Australia (WA), the Department of Health set out the regulatory requirements for the maintenance of OWTS as well as when and how it is to occur. This paper reviews the maintenance requirements for ATU and GTS in WA and provides recommendations for the proposed changes in guidelines and regulations. State and national guidelines were reviewed and information from industry and regulators was obtained through surveys. The review found that although the guidelines are generally satisfactory there are a number of areas which could be improved and specific recommendations are discussed.
文摘When the bridge components needing maintenance are the world problem at present,and the health monitoring system is considered to be a very helpful tool for solving this problem.In this paper,a large number of strain data acquired from the structural health monitoring system(SHMS)installed on a continuous rigid frame bridge are adopted to do reliability assessment.Firstly,a calculation method of punctiform time-dependent reliability is proposed based on the basic reliability theory,and introduced how to calculate reliability of the bridge by using the stress data transformed from the strain data.Secondly,combined with“Three Sigma”principle and the basic pressure safety reserve requirement,the critical load effects distribution function of the bridge is defined,and then the maintenance reliability threshold for controlling the unfavorable load state which appears in the early operation stage of this type bridge is suggested,and then the combination of bridge maintenance management and health monitoring system is realized.Finally,the transformed stress distribution certifies that the load effects of concrete bridges practically have a normal distribution;as for the concrete continuous rigid frame bridge with C50 strength grade concrete,the retrofit reliability threshold should be valued at 6.13.The methodology suggested in this article can help bridge engineers do effective maintenance of bridges,which can effectively extend the service life of the bridge and bring better economic and social benefits.
文摘An accurate and objective assessment of the health status of EMU trains is of great importance.In order to make sure the trains are functional,reliable,and endurable in their full life cycle(FLC),health assessment method for EMU trains after Level 3-5 maintenance and repair is studied.First,the element-selection principles and the assessment rules are defined;second,to present the complex topological relationship between the elements in assessment,a functional logical structure construction method is proposed;third,a health value calculation model is defined based on the element’s characteristics and their logical structures.The health variables of each element is calculated and fitted following the steps in the corresponding weight calculation methods.The assessment method is proved to be applicable and effective.