A series solution of displacement response of the ground surface in the presence of underground twin tunnels subjected to excitation of incident plane SV waves is derived by using Fourier-Bessel series expansion metho...A series solution of displacement response of the ground surface in the presence of underground twin tunnels subjected to excitation of incident plane SV waves is derived by using Fourier-Bessel series expansion method.The numerical parametric study shows that underground twin tunnels significantly amplify the nearby surface ground motion.It is suggested that the effect of subways on ground motion should be considered when the subways are planned and designed.展开更多
A method of analyzing the stability of twin shallow tunnels was presented using both limit analysis with nonlinear failure criterion and reliability theory.In the condition of nonlinear failure criterion,the critical ...A method of analyzing the stability of twin shallow tunnels was presented using both limit analysis with nonlinear failure criterion and reliability theory.In the condition of nonlinear failure criterion,the critical clear distancesof twin shallow tunnels were obtained by analyzing the change of surrounding pressure.A reliability model was established based on limit state equation,and the failure probability was solved by virtue of Monte Carlo method.Safety factor and corresponding clear distance of different safety levels were obtained by introducing a target reliability index.The scope of clear distance for different safety levels is described,which can be used as a supplement and improvement to the design codes of tunnels.展开更多
In big and crowded cities with limited urban areas, it is sometimes necessary to build twin tunnels to overcome transportation problems. In a city like Riyadh in Saudi Arabia, tunneling becomes very essential to solve...In big and crowded cities with limited urban areas, it is sometimes necessary to build twin tunnels to overcome transportation problems. In a city like Riyadh in Saudi Arabia, tunneling becomes very essential to solve effectively traffic conjunctions and associated problems. The city started to construct big tunneling projects and it is expected in the near future to start building twin tunnels. If the design and construction process of twin tunnels are not understood and considered, damage to the tunnel lining or excessive ground surface settlement may take place. In this study, the interaction between adjacent tunnels excavated through soils in Saudi Arabia has been investigated using FE analysis and the range of the encountered soil properties. The investigation considered the effect of spacing between the twin tunnels and ground conditions on tunnel behavior. The analysis focused on the effect of constructing twin tunnels on ground surface settlement, contact pressure between lining and ground, and change in tunnel diameter. Based on the results obtained, it was observed that as the compressibility ratio, c, and spacing between tunnels decreased, the interaction effect between tunnels increased. For compressibility ratio of 0.01, the excavation of the new tunnel caused an increase in the lining deformation of the old one in the range of 0.1% to 0.3%. Furthermore, the excavation of the new tunnel leads to an increase in the contact pressure at the crown of the old one by 7% - 9%. At the spring line level, the excavation of the new tunnel had almost no effect on the far side of the old one. On the other hand, and for low compressibility ratio, the new tunnel excavation significantly affected contact pressure at the near side of the old one. For an expected tunnel life of 100 years, the results show an increase in the normalized contact pressure at the crown of the old tunnel due to the excavation of the new one in the range of 2% - 7% for compressibility ratio ranging between 0.01 - 0.1, respectively.展开更多
Based on nonlinear Mohr-Coulomb failure criterion, the analytical solutions of stability number and supporting force on twin shallow tunnels were derived using upper bound theorem of limit analysis. The optimized solu...Based on nonlinear Mohr-Coulomb failure criterion, the analytical solutions of stability number and supporting force on twin shallow tunnels were derived using upper bound theorem of limit analysis. The optimized solutions were obtained by the technique of sequential quadratic programming. When nonlinear coefficient equals 1 and internal friction angle equals 0, the nonlinear Mohr-Coulomb failure criterion degenerates into linear failure criterion. The calculated results of stability number in this work were compared with previous results, and the agreement verifies the effectiveness of the present method. Under the condition of nonlinear Mohr-Coulomb failure criterion, the results show that the supporting force on twin shallow tunnels obviously increases when the nonlinear coefficient, burial depth, ground load or pore water pressure coefficients increase. When the clear distance is 0.5to 1.0 times the diameter of tunnel, the supporting force of twin shallow tunnels reaches its maximum value, which means that the tunnels are the easiest to collapse. While the clear distance increases to 3.5 times the diameter of tunnel, the calculation for twin shallow tunnels can be carried out by the method for independent single shallow tunnel. Therefore, 3.5 times the diameter of tunnel serves as a critical value to determine whether twin shallow tunnels influence each other. In designing twin shallow tunnels,appropriate clear distance value must be selected according to its change rules and actual topographic conditions, meanwhile, the influences of nonlinear failure criterion of soil materials and pore water must be completely considered. During the excavation process, supporting system should be intensified at the positions of larger burial depth or ground load to avoid collapses.展开更多
Tunnelling related hazards are very common in the Himalayan terrain and a number of such instances have been reported. Several twin tunnels are being planned for transportation purposes which will require good underst...Tunnelling related hazards are very common in the Himalayan terrain and a number of such instances have been reported. Several twin tunnels are being planned for transportation purposes which will require good understanding for prediction of tunnel deformation and surface settlement during the engineering life of the structure. The deformational behaviour, design of sequential excavation and support of any jointed rock mass are challenging during underground construction. We have raised several commonly assumed issues while performing stability analysis of underground opening at shallow depth. For this purpose, Kainchi-mod Nerchowck twin tunnels(Himachal Pradesh, India) are taken for in-depth analysis of the stability of two asymmetric tunnels to address the influence of topography, twin tunnel dimension and geometry. The host rock encountered during excavation is composed mainly of moderately to highly jointed grey sandstone, maroon sandstone and siltstones. In contrast to equidimensional tunnels where the maximum subsidence is observed vertically above the centreline of the tunnel, the result from the present study shows shifting of the maximum subsidence away from the tunnel centreline. The maximum subsidence of 0.99 mm is observed at 4.54 m left to the escape tunnel centreline whereas the maximum subsidence of 3.14 mm is observed at 8.89 m right to the main tunnel centreline. This shifting clearly indicates the influence of undulating topography and inequidimensional noncircular tunnel.展开更多
1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in leng...1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in length,and 22.6 m in width,with an overburden thickness of about 7.0 m.Fig.1 illustrates the presence of a large underground reinforced concrete stormwater culvert,measuring 11.5 m by 3.6 m,traversing the station’s center.展开更多
Limit analysis of the stability of geomechanical projects is one of the most difficult problems.This work investigates the influences of different parameters in NL failure strength on possible collapsing block shapes ...Limit analysis of the stability of geomechanical projects is one of the most difficult problems.This work investigates the influences of different parameters in NL failure strength on possible collapsing block shapes of single and twin shallow tunnels with considering the effects of surface settlement.Upper bound solutions derived by functional catastrophe theory are used for describing the distinct characteristics of falling blocks of different parts in twin tunnels.Furthermore the analytical solutions of minimum supporting pressures in shallow tunnels are obtained by the help of the variational principle.Lastly,the comparisons are made both in collapsed mechanism and stability factor with different methods.According to the numerical results in this work,the influences of different parameters on the size of collapsing block are presented in the tables and the limit supporting loads are illustrated in the form graphs that account for the surface settlement.展开更多
基金National Natural Science Foundation of China(50378063)EYTP of MOESRF for ROCS,MOE
文摘A series solution of displacement response of the ground surface in the presence of underground twin tunnels subjected to excitation of incident plane SV waves is derived by using Fourier-Bessel series expansion method.The numerical parametric study shows that underground twin tunnels significantly amplify the nearby surface ground motion.It is suggested that the effect of subways on ground motion should be considered when the subways are planned and designed.
基金Project(51378514)supported by the National Natural Science Foundation of China
文摘A method of analyzing the stability of twin shallow tunnels was presented using both limit analysis with nonlinear failure criterion and reliability theory.In the condition of nonlinear failure criterion,the critical clear distancesof twin shallow tunnels were obtained by analyzing the change of surrounding pressure.A reliability model was established based on limit state equation,and the failure probability was solved by virtue of Monte Carlo method.Safety factor and corresponding clear distance of different safety levels were obtained by introducing a target reliability index.The scope of clear distance for different safety levels is described,which can be used as a supplement and improvement to the design codes of tunnels.
文摘In big and crowded cities with limited urban areas, it is sometimes necessary to build twin tunnels to overcome transportation problems. In a city like Riyadh in Saudi Arabia, tunneling becomes very essential to solve effectively traffic conjunctions and associated problems. The city started to construct big tunneling projects and it is expected in the near future to start building twin tunnels. If the design and construction process of twin tunnels are not understood and considered, damage to the tunnel lining or excessive ground surface settlement may take place. In this study, the interaction between adjacent tunnels excavated through soils in Saudi Arabia has been investigated using FE analysis and the range of the encountered soil properties. The investigation considered the effect of spacing between the twin tunnels and ground conditions on tunnel behavior. The analysis focused on the effect of constructing twin tunnels on ground surface settlement, contact pressure between lining and ground, and change in tunnel diameter. Based on the results obtained, it was observed that as the compressibility ratio, c, and spacing between tunnels decreased, the interaction effect between tunnels increased. For compressibility ratio of 0.01, the excavation of the new tunnel caused an increase in the lining deformation of the old one in the range of 0.1% to 0.3%. Furthermore, the excavation of the new tunnel leads to an increase in the contact pressure at the crown of the old one by 7% - 9%. At the spring line level, the excavation of the new tunnel had almost no effect on the far side of the old one. On the other hand, and for low compressibility ratio, the new tunnel excavation significantly affected contact pressure at the near side of the old one. For an expected tunnel life of 100 years, the results show an increase in the normalized contact pressure at the crown of the old tunnel due to the excavation of the new one in the range of 2% - 7% for compressibility ratio ranging between 0.01 - 0.1, respectively.
基金Project(2013CB036004)supported by the National Basic Research Program of ChinaProject(51378510)supported by the NationalNatural Science Foundation of ChinaProject(CX2013B077)supported by Hunan Provincial Innovation Foundation for Postgraduate,China
文摘Based on nonlinear Mohr-Coulomb failure criterion, the analytical solutions of stability number and supporting force on twin shallow tunnels were derived using upper bound theorem of limit analysis. The optimized solutions were obtained by the technique of sequential quadratic programming. When nonlinear coefficient equals 1 and internal friction angle equals 0, the nonlinear Mohr-Coulomb failure criterion degenerates into linear failure criterion. The calculated results of stability number in this work were compared with previous results, and the agreement verifies the effectiveness of the present method. Under the condition of nonlinear Mohr-Coulomb failure criterion, the results show that the supporting force on twin shallow tunnels obviously increases when the nonlinear coefficient, burial depth, ground load or pore water pressure coefficients increase. When the clear distance is 0.5to 1.0 times the diameter of tunnel, the supporting force of twin shallow tunnels reaches its maximum value, which means that the tunnels are the easiest to collapse. While the clear distance increases to 3.5 times the diameter of tunnel, the calculation for twin shallow tunnels can be carried out by the method for independent single shallow tunnel. Therefore, 3.5 times the diameter of tunnel serves as a critical value to determine whether twin shallow tunnels influence each other. In designing twin shallow tunnels,appropriate clear distance value must be selected according to its change rules and actual topographic conditions, meanwhile, the influences of nonlinear failure criterion of soil materials and pore water must be completely considered. During the excavation process, supporting system should be intensified at the positions of larger burial depth or ground load to avoid collapses.
基金financial support from Indian Institute of Technology Bombay, India
文摘Tunnelling related hazards are very common in the Himalayan terrain and a number of such instances have been reported. Several twin tunnels are being planned for transportation purposes which will require good understanding for prediction of tunnel deformation and surface settlement during the engineering life of the structure. The deformational behaviour, design of sequential excavation and support of any jointed rock mass are challenging during underground construction. We have raised several commonly assumed issues while performing stability analysis of underground opening at shallow depth. For this purpose, Kainchi-mod Nerchowck twin tunnels(Himachal Pradesh, India) are taken for in-depth analysis of the stability of two asymmetric tunnels to address the influence of topography, twin tunnel dimension and geometry. The host rock encountered during excavation is composed mainly of moderately to highly jointed grey sandstone, maroon sandstone and siltstones. In contrast to equidimensional tunnels where the maximum subsidence is observed vertically above the centreline of the tunnel, the result from the present study shows shifting of the maximum subsidence away from the tunnel centreline. The maximum subsidence of 0.99 mm is observed at 4.54 m left to the escape tunnel centreline whereas the maximum subsidence of 3.14 mm is observed at 8.89 m right to the main tunnel centreline. This shifting clearly indicates the influence of undulating topography and inequidimensional noncircular tunnel.
基金This engineering is a demonstration project for Key Research and Development Project of Guangdong Province under Grant No.2019B111105001part of research related to this engineering was financially supported by the project.
文摘1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in length,and 22.6 m in width,with an overburden thickness of about 7.0 m.Fig.1 illustrates the presence of a large underground reinforced concrete stormwater culvert,measuring 11.5 m by 3.6 m,traversing the station’s center.
基金Project(2017zzts157)supported by the Innovation Foundation for Postgraduate of Central South University,China
文摘Limit analysis of the stability of geomechanical projects is one of the most difficult problems.This work investigates the influences of different parameters in NL failure strength on possible collapsing block shapes of single and twin shallow tunnels with considering the effects of surface settlement.Upper bound solutions derived by functional catastrophe theory are used for describing the distinct characteristics of falling blocks of different parts in twin tunnels.Furthermore the analytical solutions of minimum supporting pressures in shallow tunnels are obtained by the help of the variational principle.Lastly,the comparisons are made both in collapsed mechanism and stability factor with different methods.According to the numerical results in this work,the influences of different parameters on the size of collapsing block are presented in the tables and the limit supporting loads are illustrated in the form graphs that account for the surface settlement.