To improve the inference efficiency of convolutional neural networks(CNN),the existing neural networks mainly adopt heuristic and dynamic programming algorithms to realize parallel scheduling among operators.Heuristic...To improve the inference efficiency of convolutional neural networks(CNN),the existing neural networks mainly adopt heuristic and dynamic programming algorithms to realize parallel scheduling among operators.Heuristic scheduling algorithms can generate local optima easily,while the dynamic programming algorithm has a long convergence time for complex structural models.This paper mainly studies the parallel scheduling between operators and proposes an inter-operator parallelism schedule(IOPS)scheduling algorithm that guarantees the minimum similar execution delay.Firstly,a graph partitioning algorithm based on the largest block is designed to split the neural network model into multiple subgraphs.Then,the operators that meet the conditions is replaced according to the defined operator replacement rules.Finally,the optimal scheduling method based on backtracking is used to schedule the computational graph.Network models such as Inception-v3,ResNet-50,and RandWire are selected for testing.The experimental results show that the algorithm designed in this paper can achieve a 1.6×speedup compared with the existing sequential execution methods.展开更多
Sewage source heat pump unit operates under partial load most of the time, and study on the law of coefficient of performance (COP) of the unit varying with load ratio can provide basis for the heat pump units running...Sewage source heat pump unit operates under partial load most of the time, and study on the law of coefficient of performance (COP) of the unit varying with load ratio can provide basis for the heat pump units running in high efficiency. A mathematical model determining COP, evaporation temperature and condensation temperature of a single unit was proposed. Under the condition of uniform load distribution, the model was established according to different ways of bearing partial load with the same type multiple units but different parallel operation models, and the operation characteristics of units were analyzed as well. Results show that the single screw water-source heat pump can maintain high COP only at 60%—100% load ratio, COP decreases sharply with the decrease of load ratio, and the units with parallel operation are controlled by the load ratio of a single unit according to the reduction of total load which can keep the average COP at high level within a wide load range.展开更多
A series-parallel hydraulic hybrid system applied to public buses is put forward,and parameters of key components are analyzed and determined.Energy management strategy based on logic threshold is designed which is ai...A series-parallel hydraulic hybrid system applied to public buses is put forward,and parameters of key components are analyzed and determined.Energy management strategy based on logic threshold is designed which is aimed at efficient operation of the overall system considering the operational characteristic of the components and taking the curves of engine,hydraulic pump/motor and hydraulic pump as the main design basis;regenerative control strategy which makes regenerative brake system and frictional brake system work harmoniously is designed to raise recovery rate of regenerative brake energy.System dynamic modeling and simulation results show that the energy control strategy designed here is able to adapt system to changes of working condition and switch the operating mode reasonably.The regenerative braking control strategy is effective in raising the utilization of energy and improving fuel economy.展开更多
This paper presents an investigation on a voltage and frequency controller (VFC), which functions as an improved elec-tronic load controller (IELC) for parallel operated isolated asynchronous generators (IAGs) in an a...This paper presents an investigation on a voltage and frequency controller (VFC), which functions as an improved elec-tronic load controller (IELC) for parallel operated isolated asynchronous generators (IAGs) in an autonomous hydro power generation system. In such type of hydro scheme whole generating system is isolated from the grid and supply electricity to the remote communities. The single point operation of these generators is realized, in such a manner that excitation capacitors, speeds, load, voltage, currents of generators remain constant under various operating conditions. The proposed controller consists of a 3-leg IGBT (Insulated Gate Bipolar Transistor) based voltage source converter (VSC) and a DC chopper with an auxiliary load at the DC bus of the VSC. The IELC controls the reactive and active powers simultaneously for controlling the voltage and frequency under varying consumer loads. Along with voltage and frequency control through single point operation of IAGs driven by uncontrolled pico hydro turbines, the IELC meets the power quality standard an IEEE-519 and it keeps the total harmonic distortion (THD) of the terminal voltage and currents within the limit of 5%. Here the proposed electrical system along with its controller is modeled in MATLAB along with Simulink and PSB (Power System Block-set) toolboxes. Simulation results are presented to demonstrate the capability of proposed controller for an isolated generating system.展开更多
基金Supported by the National Key Research and Development Project of China(No.2020AAA0104603)the National Natural Science Foundation of China(No.61834005,61772417)the Shaanxi Province Key R&D Plan(No.2021GY-029).
文摘To improve the inference efficiency of convolutional neural networks(CNN),the existing neural networks mainly adopt heuristic and dynamic programming algorithms to realize parallel scheduling among operators.Heuristic scheduling algorithms can generate local optima easily,while the dynamic programming algorithm has a long convergence time for complex structural models.This paper mainly studies the parallel scheduling between operators and proposes an inter-operator parallelism schedule(IOPS)scheduling algorithm that guarantees the minimum similar execution delay.Firstly,a graph partitioning algorithm based on the largest block is designed to split the neural network model into multiple subgraphs.Then,the operators that meet the conditions is replaced according to the defined operator replacement rules.Finally,the optimal scheduling method based on backtracking is used to schedule the computational graph.Network models such as Inception-v3,ResNet-50,and RandWire are selected for testing.The experimental results show that the algorithm designed in this paper can achieve a 1.6×speedup compared with the existing sequential execution methods.
基金Supported by National Natural Science Foundation of China (No. 50578048)"Heating, Gas, Ventilation and Air Conditioning" Key Laboratory Open Subject in Beijing (No. KF200710)the Postdoctoral Researcher Science Foundation of China (No. 20090450986)
文摘Sewage source heat pump unit operates under partial load most of the time, and study on the law of coefficient of performance (COP) of the unit varying with load ratio can provide basis for the heat pump units running in high efficiency. A mathematical model determining COP, evaporation temperature and condensation temperature of a single unit was proposed. Under the condition of uniform load distribution, the model was established according to different ways of bearing partial load with the same type multiple units but different parallel operation models, and the operation characteristics of units were analyzed as well. Results show that the single screw water-source heat pump can maintain high COP only at 60%—100% load ratio, COP decreases sharply with the decrease of load ratio, and the units with parallel operation are controlled by the load ratio of a single unit according to the reduction of total load which can keep the average COP at high level within a wide load range.
基金Supported by the National Natural Science Foundation of China(No.50875054)Weihai Science and Technology Development Plan Project(No.2012DXGJ13)
文摘A series-parallel hydraulic hybrid system applied to public buses is put forward,and parameters of key components are analyzed and determined.Energy management strategy based on logic threshold is designed which is aimed at efficient operation of the overall system considering the operational characteristic of the components and taking the curves of engine,hydraulic pump/motor and hydraulic pump as the main design basis;regenerative control strategy which makes regenerative brake system and frictional brake system work harmoniously is designed to raise recovery rate of regenerative brake energy.System dynamic modeling and simulation results show that the energy control strategy designed here is able to adapt system to changes of working condition and switch the operating mode reasonably.The regenerative braking control strategy is effective in raising the utilization of energy and improving fuel economy.
文摘This paper presents an investigation on a voltage and frequency controller (VFC), which functions as an improved elec-tronic load controller (IELC) for parallel operated isolated asynchronous generators (IAGs) in an autonomous hydro power generation system. In such type of hydro scheme whole generating system is isolated from the grid and supply electricity to the remote communities. The single point operation of these generators is realized, in such a manner that excitation capacitors, speeds, load, voltage, currents of generators remain constant under various operating conditions. The proposed controller consists of a 3-leg IGBT (Insulated Gate Bipolar Transistor) based voltage source converter (VSC) and a DC chopper with an auxiliary load at the DC bus of the VSC. The IELC controls the reactive and active powers simultaneously for controlling the voltage and frequency under varying consumer loads. Along with voltage and frequency control through single point operation of IAGs driven by uncontrolled pico hydro turbines, the IELC meets the power quality standard an IEEE-519 and it keeps the total harmonic distortion (THD) of the terminal voltage and currents within the limit of 5%. Here the proposed electrical system along with its controller is modeled in MATLAB along with Simulink and PSB (Power System Block-set) toolboxes. Simulation results are presented to demonstrate the capability of proposed controller for an isolated generating system.