Global energy demand is growing rapidly owing to industrial growth and urbanization.Alternative energy sources are driven by limited reserves and rapid depletion of conventional energy sources(e.g.,fossil fuels).Solar...Global energy demand is growing rapidly owing to industrial growth and urbanization.Alternative energy sources are driven by limited reserves and rapid depletion of conventional energy sources(e.g.,fossil fuels).Solar photovol-taic(PV),as a source of electricity,has grown in popularity over the last few dec-ades because of their clean,noise-free,low-maintenance,and abundant availability of solar energy.There are two types of maximum power point track-ing(MPPT)techniques:classical and evolutionary algorithm-based techniques.Precise and less complex perturb and observe(P&O)and incremental conduc-tance(INC)approaches are extensively employed among classical techniques.This study used afield-programmable gate array(FPGA)-based hardware arrange-ment for a grid-connected photovoltaic(PV)system.The PV panels,MPPT con-trollers,and battery management systems are all components of the proposed system.In the developed hardware prototype,various modes of operation of the grid-connected PV system were examined using P&O and incremental con-ductance MPPT approaches.展开更多
This paper presents the development and performance capability of a comprehensive Low voltage ride through (LVRT) control scheme that makes use of both the DC chopper and the current limiting based on the required rea...This paper presents the development and performance capability of a comprehensive Low voltage ride through (LVRT) control scheme that makes use of both the DC chopper and the current limiting based on the required reactive power during fault time. The study is conducted on an 8.5 MW single stage PV power plant (PVPP) connected to the Rwandan grid. In the event of fault disturbance, this control scheme helps to overcome the problems of excessive DC-link voltage by fast activation of the DC chopper operation. At the same instance, AC current is limited to the maximum rating of the inverter as a function of the injected reactive current. This helps overcome AC-over- current that may possibly lead to damage or disconnection of the inverter. The control scheme also ensures voltage support and power balance through the injection of reactive current as per grid code requirements. Selected simulations using MATLAB are carried out in the events of different kinds of fault caused voltage dips. Results demonstrate the effectiveness of the proposed LVRT control scheme.展开更多
This paper assesses 4 years of operation of a 1.75 kW roof top solar PV system installed in a Sydney suburban house. The system consists of 10 PV panels, a DC/AC inverter, and a grid connected gross meter. Solar elect...This paper assesses 4 years of operation of a 1.75 kW roof top solar PV system installed in a Sydney suburban house. The system consists of 10 PV panels, a DC/AC inverter, and a grid connected gross meter. Solar electricity delivered to grid is verified with the results from a computer simulation package (PVSYST) by adopting the installed component specifications, operation conditions, and weather data of the site. The results show high consistency between the values of energy delivered to the grid measured by the energy company and the energy estimated by system simulation. New system performance indicator is developed and called the optimum performance compliance ratio (PCR). It is a measure of the compliance of the output of the designed PV system with the output which would be produced by the same system with a solar tracker. This indicator provides system designers, contractors and energy providers with the actual capacity of the system that they can offer the end-users.展开更多
This paper presents the results of research on the application of inverter in the grid connected solar photovoltaics (PV) system. The main content of the article is to control the three-phase grid connected inverter t...This paper presents the results of research on the application of inverter in the grid connected solar photovoltaics (PV) system. The main content of the article is to control the three-phase grid connected inverter to meet the requirement of controlling the reactive power to zero at a node of the distribution network while maximizing the active power transmitted to the grid. The control circuits are synthesized on the dq coordinate system and verified on the simulation model by Matlab/Simulink. Both simulation and experimental prototype on 5 kW inverter, being connected to low voltage grid, have been built to show the good results and the practical readiness for implementation.展开更多
The impact of Bapco 5 MW solar PV grid-connected project on Bahrain’s outlook for clean energy and energy-mix production was analyzed since solar electricity obtained from PV installation is considered as a non-linea...The impact of Bapco 5 MW solar PV grid-connected project on Bahrain’s outlook for clean energy and energy-mix production was analyzed since solar electricity obtained from PV installation is considered as a non-linear system. Several positive impacts were counted. These impacts were on business, economy, environment, research, green jobs creation and rooftop installation and other large-scale installation. This project had attracted public, investors, developers to invest in similar projects in the Kingdom of Bahrain;especially it is an environmentally friendly and smart technology. This innovative smart grid-connected 5 MW solar PV power plant is enough to electrify 500 houses @ 10 kW and had answered lots of frustrating questions such as the effect of dust on PV performance, need of man-made cleaning compared to naturally cleaned PV panels, reliability of the system, greenhouse gases reduction and pay-back period.展开更多
In this paper, the performance of grid connected PV system that is installed in Super Mega Factory is presented. The output parameters of 4 kW PV is collected and analyzed. Then, according to the results the weak poin...In this paper, the performance of grid connected PV system that is installed in Super Mega Factory is presented. The output parameters of 4 kW PV is collected and analyzed. Then, according to the results the weak points of the system were found and the theoretical output power was compared. After that we try to get the maximum output power making the correction of collector angle and place suitable panel position.展开更多
This document presents the evaluation and the monitoring of the performances of the first grid-connected photovoltaic system installed in the Center of Studies and Researches on the Renewable Energies (CERER) inaugura...This document presents the evaluation and the monitoring of the performances of the first grid-connected photovoltaic system installed in the Center of Studies and Researches on the Renewable Energies (CERER) inaugurated on December 4th, 2012 by the governmental authorities of Senegal and Tenerife. This mini power plant of 3.15 kWc is a perfect example of the political will of the government which is to reduce the production cost of the electricity, with the diversification of the sources of production, and the greater use of the other sources such as the natural gas, the coal, the renewable energies. The evaluation of the performances of the installation is realized by using the indicators of efficiency and performance as the photovoltaic surface yield, the ratio of photovoltaic performance, the photovoltaic specific yield, and the losses of captures. The obtained results show that a big part of the energy shone during the period of observation was not able to be used further to circumstances such as the losses of conductivity, the heat losses or for example the defects on components. The analysis also shows that a large part of the produced energy is not injected because of the dilapidation of the network, the defects of landing but especially one disjunction sees frequently at the level of the point of injection.展开更多
The energy assessment of the PV power systems is carried out by using different types of performance indicators that benchmark the output of these systems against the PV panel maximum output at hypothetical operation ...The energy assessment of the PV power systems is carried out by using different types of performance indicators that benchmark the output of these systems against the PV panel maximum output at hypothetical operation conditions. In this paper, a comparative analysis of six types of performance indicators is conducted and a new performance indicator which considers PV panel slope and orientation is proposed. The proposed indicator is benchmarking the PV system actual output against the maximum output of the same system if it would operate in two axis tracking mode. The proposed performance indicator is used to develop a friendly user calculator of PV system output that can be used by, energy providers and PV system installers to evaluate the output of the PV grid connect network. The advantage of the developed calculator is high-lighted by a case study that estimates energy capacity of different residential rooftop PV systems installed in a residential suburb in Sydney.展开更多
Integration of Solar Photovoltaic (PV) generation into an existing distribution system has many impacts on the system, with the power flow being one of the major issues. This impact is not generic for any network, but...Integration of Solar Photovoltaic (PV) generation into an existing distribution system has many impacts on the system, with the power flow being one of the major issues. This impact is not generic for any network, but it may manifest itself either positively or negatively, depending on the grid configuration, interface control modes, operation mode, and load profile. Grid-connected PV systems have three control options of the local voltage controller of the interface DC-AC converter. These control modes are Power Factor control, voltage control, and Droop Voltage control. This paper aims at evaluating and comparing the impacts of those control modes on the grid power flow. A set of evaluation criteria and indices is defined and mathematically formulated. Based on the requirements of the used program (Power Factory Dig Silent V14.1.3), a computation plan (algorithm) has been proposed. The algorithm has been applied to a typical weak network and a wide range of simulations has been carried out. Simulation results have been thoroughly discussed and important findings have been concluded.展开更多
PV plants are increasing all over the world and they are becoming a distinct part of electric grids.Due to abundance of solar irradiation and almost constant amount of it in certain geographical latitudes,selection of...PV plants are increasing all over the world and they are becoming a distinct part of electric grids.Due to abundance of solar irradiation and almost constant amount of it in certain geographical latitudes,selection of proper capacity of PV plants depends mostly on available places for the site.In this paper,important measures for safe connection of a PV plant in terms of voltage requirements are addressed and several guidelines are introduced for this purpose.In addition,simulation results are included to prove some of the mentioned suggestions.A general algorithm is fi nally proposed to show the directions for safe connection of PV plants.展开更多
文摘Global energy demand is growing rapidly owing to industrial growth and urbanization.Alternative energy sources are driven by limited reserves and rapid depletion of conventional energy sources(e.g.,fossil fuels).Solar photovol-taic(PV),as a source of electricity,has grown in popularity over the last few dec-ades because of their clean,noise-free,low-maintenance,and abundant availability of solar energy.There are two types of maximum power point track-ing(MPPT)techniques:classical and evolutionary algorithm-based techniques.Precise and less complex perturb and observe(P&O)and incremental conduc-tance(INC)approaches are extensively employed among classical techniques.This study used afield-programmable gate array(FPGA)-based hardware arrange-ment for a grid-connected photovoltaic(PV)system.The PV panels,MPPT con-trollers,and battery management systems are all components of the proposed system.In the developed hardware prototype,various modes of operation of the grid-connected PV system were examined using P&O and incremental con-ductance MPPT approaches.
文摘This paper presents the development and performance capability of a comprehensive Low voltage ride through (LVRT) control scheme that makes use of both the DC chopper and the current limiting based on the required reactive power during fault time. The study is conducted on an 8.5 MW single stage PV power plant (PVPP) connected to the Rwandan grid. In the event of fault disturbance, this control scheme helps to overcome the problems of excessive DC-link voltage by fast activation of the DC chopper operation. At the same instance, AC current is limited to the maximum rating of the inverter as a function of the injected reactive current. This helps overcome AC-over- current that may possibly lead to damage or disconnection of the inverter. The control scheme also ensures voltage support and power balance through the injection of reactive current as per grid code requirements. Selected simulations using MATLAB are carried out in the events of different kinds of fault caused voltage dips. Results demonstrate the effectiveness of the proposed LVRT control scheme.
文摘This paper assesses 4 years of operation of a 1.75 kW roof top solar PV system installed in a Sydney suburban house. The system consists of 10 PV panels, a DC/AC inverter, and a grid connected gross meter. Solar electricity delivered to grid is verified with the results from a computer simulation package (PVSYST) by adopting the installed component specifications, operation conditions, and weather data of the site. The results show high consistency between the values of energy delivered to the grid measured by the energy company and the energy estimated by system simulation. New system performance indicator is developed and called the optimum performance compliance ratio (PCR). It is a measure of the compliance of the output of the designed PV system with the output which would be produced by the same system with a solar tracker. This indicator provides system designers, contractors and energy providers with the actual capacity of the system that they can offer the end-users.
文摘This paper presents the results of research on the application of inverter in the grid connected solar photovoltaics (PV) system. The main content of the article is to control the three-phase grid connected inverter to meet the requirement of controlling the reactive power to zero at a node of the distribution network while maximizing the active power transmitted to the grid. The control circuits are synthesized on the dq coordinate system and verified on the simulation model by Matlab/Simulink. Both simulation and experimental prototype on 5 kW inverter, being connected to low voltage grid, have been built to show the good results and the practical readiness for implementation.
文摘The impact of Bapco 5 MW solar PV grid-connected project on Bahrain’s outlook for clean energy and energy-mix production was analyzed since solar electricity obtained from PV installation is considered as a non-linear system. Several positive impacts were counted. These impacts were on business, economy, environment, research, green jobs creation and rooftop installation and other large-scale installation. This project had attracted public, investors, developers to invest in similar projects in the Kingdom of Bahrain;especially it is an environmentally friendly and smart technology. This innovative smart grid-connected 5 MW solar PV power plant is enough to electrify 500 houses @ 10 kW and had answered lots of frustrating questions such as the effect of dust on PV performance, need of man-made cleaning compared to naturally cleaned PV panels, reliability of the system, greenhouse gases reduction and pay-back period.
文摘In this paper, the performance of grid connected PV system that is installed in Super Mega Factory is presented. The output parameters of 4 kW PV is collected and analyzed. Then, according to the results the weak points of the system were found and the theoretical output power was compared. After that we try to get the maximum output power making the correction of collector angle and place suitable panel position.
文摘This document presents the evaluation and the monitoring of the performances of the first grid-connected photovoltaic system installed in the Center of Studies and Researches on the Renewable Energies (CERER) inaugurated on December 4th, 2012 by the governmental authorities of Senegal and Tenerife. This mini power plant of 3.15 kWc is a perfect example of the political will of the government which is to reduce the production cost of the electricity, with the diversification of the sources of production, and the greater use of the other sources such as the natural gas, the coal, the renewable energies. The evaluation of the performances of the installation is realized by using the indicators of efficiency and performance as the photovoltaic surface yield, the ratio of photovoltaic performance, the photovoltaic specific yield, and the losses of captures. The obtained results show that a big part of the energy shone during the period of observation was not able to be used further to circumstances such as the losses of conductivity, the heat losses or for example the defects on components. The analysis also shows that a large part of the produced energy is not injected because of the dilapidation of the network, the defects of landing but especially one disjunction sees frequently at the level of the point of injection.
文摘The energy assessment of the PV power systems is carried out by using different types of performance indicators that benchmark the output of these systems against the PV panel maximum output at hypothetical operation conditions. In this paper, a comparative analysis of six types of performance indicators is conducted and a new performance indicator which considers PV panel slope and orientation is proposed. The proposed indicator is benchmarking the PV system actual output against the maximum output of the same system if it would operate in two axis tracking mode. The proposed performance indicator is used to develop a friendly user calculator of PV system output that can be used by, energy providers and PV system installers to evaluate the output of the PV grid connect network. The advantage of the developed calculator is high-lighted by a case study that estimates energy capacity of different residential rooftop PV systems installed in a residential suburb in Sydney.
文摘Integration of Solar Photovoltaic (PV) generation into an existing distribution system has many impacts on the system, with the power flow being one of the major issues. This impact is not generic for any network, but it may manifest itself either positively or negatively, depending on the grid configuration, interface control modes, operation mode, and load profile. Grid-connected PV systems have three control options of the local voltage controller of the interface DC-AC converter. These control modes are Power Factor control, voltage control, and Droop Voltage control. This paper aims at evaluating and comparing the impacts of those control modes on the grid power flow. A set of evaluation criteria and indices is defined and mathematically formulated. Based on the requirements of the used program (Power Factory Dig Silent V14.1.3), a computation plan (algorithm) has been proposed. The algorithm has been applied to a typical weak network and a wide range of simulations has been carried out. Simulation results have been thoroughly discussed and important findings have been concluded.
文摘PV plants are increasing all over the world and they are becoming a distinct part of electric grids.Due to abundance of solar irradiation and almost constant amount of it in certain geographical latitudes,selection of proper capacity of PV plants depends mostly on available places for the site.In this paper,important measures for safe connection of a PV plant in terms of voltage requirements are addressed and several guidelines are introduced for this purpose.In addition,simulation results are included to prove some of the mentioned suggestions.A general algorithm is fi nally proposed to show the directions for safe connection of PV plants.