期刊文献+
共找到3,659篇文章
< 1 2 183 >
每页显示 20 50 100
The forecasting efficiency under different selected regions by Pattern Informatics Method and seismic potential estimation in the North-South Seismic Zone
1
作者 Weixi Tian Yongxian Zhang 《Earthquake Science》 2024年第4期368-382,共15页
In 2022,four earthquakes with M_(S)≥6.0 including the Menyuan M_(S)6.9 and Luding M_(S)6.8 earthquakes occurred in the North-South Seismic Zone(NSSZ),which demonstrated high and strong seismicity.Pattern Informatics(... In 2022,four earthquakes with M_(S)≥6.0 including the Menyuan M_(S)6.9 and Luding M_(S)6.8 earthquakes occurred in the North-South Seismic Zone(NSSZ),which demonstrated high and strong seismicity.Pattern Informatics(PI)method,as an effective long and medium term earthquake forecasting method,has been applied to the strong earthquake forecasting in Chinese mainland and results have shown the positive performance.The earthquake catalog with magnitude above M_(S)3.0 since 1970 provided by China Earthquake Networks Center was employed in this study and the Receiver Operating Characteristic(ROC)method was applied to test the forecasting efficiency of the PI method in each selected region related to the North-South Seismic Zone systematically.Based on this,we selected the area with the best ROC testing result and analyzed the evolution process of the PI hotspot map reflecting the small seismic activity pattern prior to the Menyuan M_(S)6.9 and Luding M_(S)6.8 earthquakes.A“forward”forecast for the area was carried out to assess seismic risk.The study shows the following.1)PI forecasting has higher forecasting efficiency in the selected study region where the difference of seismicity in any place of the region is smaller.2)In areas with smaller differences of seismicity,the activity pattern of small earthquakes prior to the Menyuan M_(S)6.9 and Luding M_(S)6.8 earthquakes can be obtained by analyzing the spatio-temporal evolution process of the PI hotspot map.3)The hotspot evolution in and around the southern Tazang fault in the study area is similar to that prior to the strong earthquakes,which suggests the possible seismic hazard in the future.This study could provide some ideas to the seismic hazard assessment in other regions with high seismicity,such as Japan,Californi,Turkey,and Indonesia. 展开更多
关键词 Luding M_(S)6.8 and Menyuan M_(S)6.9 earthquake Pattern Informatics method North-South Seismic Zone earthquake forecasting seismic activity pattern.
下载PDF
Scientific Advances and Weather Services of the China Meteorological Administration’s National Forecasting Systems during the Beijing 2022 Winter Olympics
2
作者 Guo DENG Xueshun SHEN +23 位作者 Jun DU Jiandong GONG Hua TONG Liantang DENG Zhifang XU Jing CHEN Jian SUN Yong WANG Jiangkai HU Jianjie WANG Mingxuan CHEN Huiling YUAN Yutao ZHANG Hongqi LI Yuanzhe WANG Li GAO Li SHENG Da LI Li LI Hao WANG Ying ZHAO Yinglin LI Zhili LIU Wenhua GUO 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 2024年第5期767-776,共10页
Since the Beijing 2022 Winter Olympics was the first Winter Olympics in history held in continental winter monsoon climate conditions across complex terrain areas,there is a deficiency of relevant research,operational... Since the Beijing 2022 Winter Olympics was the first Winter Olympics in history held in continental winter monsoon climate conditions across complex terrain areas,there is a deficiency of relevant research,operational techniques,and experience.This made providing meteorological services for this event particularly challenging.The China Meteorological Administration(CMA)Earth System Modeling and Prediction Centre,achieved breakthroughs in research on short-and medium-term deterministic and ensemble numerical predictions.Several key technologies crucial for precise winter weather services during the Winter Olympics were developed.A comprehensive framework,known as the Operational System for High-Precision Weather Forecasting for the Winter Olympics,was established.Some of these advancements represent the highest level of capabilities currently available in China.The meteorological service provided to the Beijing 2022 Games also exceeded previous Winter Olympic Games in both variety and quality.This included achievements such as the“100-meter level,minute level”downscaled spatiotemporal resolution and forecasts spanning 1 to 15 days.Around 30 new technologies and over 60 kinds of products that align with the requirements of the Winter Olympics Organizing Committee were developed,and many of these techniques have since been integrated into the CMA’s operational national forecasting systems.These accomplishments were facilitated by a dedicated weather forecasting and research initiative,in conjunction with the preexisting real-time operational forecasting systems of the CMA.This program represents one of the five subprograms of the WMO’s high-impact weather forecasting demonstration project(SMART2022),and continues to play an important role in their Regional Association(RA)II Research Development Project(Hangzhou RDP).Therefore,the research accomplishments and meteorological service experiences from this program will be carried forward into forthcoming highimpact weather forecasting activities.This article provides an overview and assessment of this program and the operational national forecasting systems. 展开更多
关键词 Beijing Winter Olympic Games CMA national forecasting system data assimilation ensemble forecast bias correction and downscaling machine learning-based fusion methods
下载PDF
Application of Kalman Filter Method in the Forecast of Temperature in Nanchang
3
作者 Feifei WU Xiaoyou LONG +1 位作者 Chuanshi TANG Landi ZHONG 《Meteorological and Environmental Research》 2024年第4期32-35,共4页
A temperature forecasting model was created firstly based on the Kalman filter method,and then used to predict the highest and lowest temperature in Nanchang station from October 27 to November 1,2017.Finally,accordin... A temperature forecasting model was created firstly based on the Kalman filter method,and then used to predict the highest and lowest temperature in Nanchang station from October 27 to November 1,2017.Finally,according to the empirical forecasting method,guidance forecasts were established for the northern,central,and southern parts of Nanchang City.After inspection,it was found that the temperature prediction model established based on the Kalman filter method in Nanchang station had good prediction performance,and especially in the 24-hour forecast,it had advantages over the European Center.The accuracy of low temperature forecast was better than that of high temperature forecast. 展开更多
关键词 Kalman filter method Temperature forecast Nanchang City
下载PDF
Comparison of the City Water Consumption Short-Term Forecasting Methods 被引量:7
4
作者 刘洪波 张宏伟 《Transactions of Tianjin University》 EI CAS 2002年第3期211-215,共5页
There are a lot of methods in city water consumption short-term forecasting both inside and outside the country. But among these methods there exist many advantages and shortcomings in model establishing, solving and ... There are a lot of methods in city water consumption short-term forecasting both inside and outside the country. But among these methods there exist many advantages and shortcomings in model establishing, solving and predicting accuracy, speed, applicability. This article draws lessons from other realm mature methods after many years′ study. It′s systematically studied and compared to predict the water consumption in accuracy, speed, effect and applicability among the time series triangle function method, artificial neural network method, gray system theories method, wavelet analytical method. 展开更多
关键词 city water consumption short-term forecasting method comparison APPLICABILITY
下载PDF
Microseismic monitoring and forecasting of dynamic disasters in underground hydropower projects in southwest China:A review 被引量:3
5
作者 Biao Li Nuwen Xu +4 位作者 Peiwei Xiao Yong Xia Xiang Zhou Gongkai Gu Xingguo Yang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第8期2158-2177,共20页
The underground hydropower projects in Southwest China is characterized by large excavation sizes,high geostresses,complicated geological conditions and multiple construction processes.Various disasters such as collap... The underground hydropower projects in Southwest China is characterized by large excavation sizes,high geostresses,complicated geological conditions and multiple construction processes.Various disasters such as collapses,large deformations,rockbursts are frequently encountered,resulting in serious casualties and huge economic losses.This review mainly presents some representative results on microseismic(MS)monitoring and forecasting for disasters in hydropower underground engineering.First,a set of new denoising,spectral analysis,and location methods were developed for better identification and location of MS signals.Then,the tempo-spatial characteristics of MS events were analyzed to understand the relationship between field construction and damages of surrounding rocks.Combined with field construction,geological data,numerical simulation and parametric analysis of MS sources,the focal mechanism of MS events was revealed.A damage constitutive model considering MS fracturing size was put forward and feedback analysis considering the MS damage of underground surrounding rocks was conducted.Next,an MS multi-parameter based risk assessment and early warning method for dynamic disasters were proposed.The technology for control of the damage and deformation of underground surrounding rocks was proposed for underground caverns.Finally,two typical underground powerhouses were selected as case studies.These achievements can provide significant references for prevention and control of dynamic disasters for underground engineering with similar complicated geological conditions. 展开更多
关键词 MS monitoring forecasting method Control technology Dynamic disaster Underground engineering
下载PDF
Physics-Informed AI Surrogates for Day-Ahead Wind Power Probabilistic Forecasting with Incomplete Data for Smart Grid in Smart Cities 被引量:1
6
作者 Zeyu Wu Bo Sun +2 位作者 Qiang Feng Zili Wang Junlin Pan 《Computer Modeling in Engineering & Sciences》 SCIE EI 2023年第10期527-554,共28页
Due to the high inherent uncertainty of renewable energy,probabilistic day-ahead wind power forecasting is crucial for modeling and controlling the uncertainty of renewable energy smart grids in smart cities.However,t... Due to the high inherent uncertainty of renewable energy,probabilistic day-ahead wind power forecasting is crucial for modeling and controlling the uncertainty of renewable energy smart grids in smart cities.However,the accuracy and reliability of high-resolution day-ahead wind power forecasting are constrained by unreliable local weather prediction and incomplete power generation data.This article proposes a physics-informed artificial intelligence(AI)surrogates method to augment the incomplete dataset and quantify its uncertainty to improve wind power forecasting performance.The incomplete dataset,built with numerical weather prediction data,historical wind power generation,and weather factors data,is augmented based on generative adversarial networks.After augmentation,the enriched data is then fed into a multiple AI surrogates model constructed by two extreme learning machine networks to train the forecasting model for wind power.Therefore,the forecasting models’accuracy and generalization ability are improved by mining the implicit physics information from the incomplete dataset.An incomplete dataset gathered from a wind farm in North China,containing only 15 days of weather and wind power generation data withmissing points caused by occasional shutdowns,is utilized to verify the proposed method’s performance.Compared with other probabilistic forecastingmethods,the proposed method shows better accuracy and probabilistic performance on the same incomplete dataset,which highlights its potential for more flexible and sensitive maintenance of smart grids in smart cities. 展开更多
关键词 Physics-informed method probabilistic forecasting wind power generative adversarial network extreme learning machine day-ahead forecasting incomplete data smart grids
下载PDF
A Literature Review of Wind Forecasting Methods 被引量:7
7
作者 Wen-Yeau Chang 《Journal of Power and Energy Engineering》 2014年第4期161-168,共8页
In this paper, an overview of new and current developments in wind forecasting is given where the focus lies upon principles and practical implementations. High penetration of wind power in the electricity system prov... In this paper, an overview of new and current developments in wind forecasting is given where the focus lies upon principles and practical implementations. High penetration of wind power in the electricity system provides many challenges to the power system operators, mainly due to the unpredictability and variability of wind power generation. Although wind energy may not be dispatched, an accurate forecasting method of wind speed and power generation can help the power system operators reduce the risk of unreliability of electricity supply. This paper gives a literature survey on the categories and major methods of wind forecasting. Based on the assessment of wind speed and power forecasting methods, the future development direction of wind forecasting is proposed. 展开更多
关键词 LITERATURE SURVEY WIND forecasting CATEGORIES WIND SPEED and Power forecasting methodS
下载PDF
Applying the Dynamic Two-Step Method to Forecast Remaining Oil Distribution of Lower Series ,Xiaermen Oilfield 被引量:2
8
作者 周红 汤传意 李增辉 《Journal of China University of Geosciences》 SCIE CSCD 2006年第1期65-70,共6页
The distribution of remaining oil is often described qualitatively. The remaining oil distributed in the whole reservoir is calculated according to the characteristics of the space distribution of the saturation of re... The distribution of remaining oil is often described qualitatively. The remaining oil distributed in the whole reservoir is calculated according to the characteristics of the space distribution of the saturation of remaining oil. Logging data are required to accomplish this. However, many such projects cannot be completed. Since the old study of remaining oil distribution could not be quantified efficiently, the "dynamic two-step method" is presented. Firstly, the water cut of every flow unit in one well at one time is calculated according to the comprehensive water cut of a single well at one time. Secondly, the remaining oil saturation of the flow unit of the well at one time is calculated based on the water cut of the flow unit at a given time. The results show that "dynamic two-step method" has characteristics of simplicity and convenience, and is especially suitable for the study of remaining oil distribution at high water-cut stage. The distribution of remaining oil presented banding and potato form, remaining oil was relatively concentrated in faultage neighborhood and imperfect well netting position, and the net thickness of the place was great. This proposal can provide an effective way to forecast remaining oil distribution and enhance oil recovery, especially applied at the high water-cut stage. 展开更多
关键词 dynamic two-step method flow unit quantitative forecast remaining oil
下载PDF
Hourly traffic flow forecasting using a new hybrid modelling method 被引量:8
9
作者 LIU Hui ZHANG Xin-yu +2 位作者 YANG Yu-xiang LI Yan-fei YU Cheng-qing 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第4期1389-1402,共14页
Short-term traffic flow forecasting is a significant part of intelligent transportation system.In some traffic control scenarios,obtaining future traffic flow in advance is conducive to highway management department t... Short-term traffic flow forecasting is a significant part of intelligent transportation system.In some traffic control scenarios,obtaining future traffic flow in advance is conducive to highway management department to have sufficient time to formulate corresponding traffic flow control measures.In hence,it is meaningful to establish an accurate short-term traffic flow method and provide reference for peak traffic flow warning.This paper proposed a new hybrid model for traffic flow forecasting,which is composed of the variational mode decomposition(VMD)method,the group method of data handling(GMDH)neural network,bi-directional long and short term memory(BILSTM)network and ELMAN network,and is optimized by the imperialist competitive algorithm(ICA)method.To illustrate the performance of the proposed model,there are several comparative experiments between the proposed model and other models.The experiment results show that 1)BILSTM network,GMDH network and ELMAN network have better predictive performance than other single models;2)VMD can significantly improve the predictive performance of the ICA-GMDH-BILSTM-ELMAN model.The effect of VMD method is better than that of EEMD method and FEEMD method.To conclude,the proposed model which is made up of the VMD method,the ICA method,the BILSTM network,the GMDH network and the ELMAN network has excellent predictive ability for traffic flow series. 展开更多
关键词 traffic flow forecasting intelligent transportation system imperialist competitive algorithm variational mode decomposition group method of data handling bi-directional long and short term memory ELMAN
下载PDF
Hybrid LEAP modeling method for long-term energy demand forecasting of regions with limited statistical data 被引量:3
10
作者 CHEN Rui RAO Zheng-hua LIAO Sheng-ming 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第8期2136-2148,共13页
An accurate long-term energy demand forecasting is essential for energy planning and policy making. However, due to the immature energy data collecting and statistical methods, the available data are usually limited i... An accurate long-term energy demand forecasting is essential for energy planning and policy making. However, due to the immature energy data collecting and statistical methods, the available data are usually limited in many regions. In this paper, on the basis of comprehensive literature review, we proposed a hybrid model based on the long-range alternative energy planning (LEAP) model to improve the accuracy of energy demand forecasting in these regions. By taking Hunan province, China as a typical case, the proposed hybrid model was applied to estimating the possible future energy demand and energy-saving potentials in different sectors. The structure of LEAP model was estimated by Sankey energy flow, and Leslie matrix and autoregressive integrated moving average (ARIMA) models were used to predict the population, industrial structure and transportation turnover, respectively. Monte-Carlo method was employed to evaluate the uncertainty of forecasted results. The results showed that the hybrid model combined with scenario analysis provided a relatively accurate forecast for the long-term energy demand in regions with limited statistical data, and the average standard error of probabilistic distribution in 2030 energy demand was as low as 0.15. The prediction results could provide supportive references to identify energy-saving potentials and energy development pathways. 展开更多
关键词 energy demand forecasting with limited data hybrid LEAP model ARIMA model Leslie matrix Monte-Carlo method
下载PDF
A New Multidimensional Time Series Forecasting Method Based on the EOF Iteration Scheme 被引量:3
11
作者 张邦林 刘洁 孙照渤 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 1993年第2期243-247,共5页
In this paper a new .mnultidimensional time series forecasting scheme based on the empirical orthogonal function (EOF) stepwise iteration process is introduced. The scheme is tested in a series of forecast experiments... In this paper a new .mnultidimensional time series forecasting scheme based on the empirical orthogonal function (EOF) stepwise iteration process is introduced. The scheme is tested in a series of forecast experiments of Nino3 SST anomalies and Tahiti-Darwin SO index. The results show that the scheme is feasible and ENSO predictable. 展开更多
关键词 SST A New Multidimensional Time Series forecasting method Based on the EOF Iteration Scheme Nino EOF
下载PDF
Application of neural network model coupling with the partial least-squares method for forecasting watre yield of mine 被引量:2
12
作者 陈南祥 曹连海 黄强 《Journal of Coal Science & Engineering(China)》 2005年第1期40-43,共4页
Scientific forecasting water yield of mine is of great significance to the safety production of mine and the colligated using of water resources. The paper established the forecasting model for water yield of mine, co... Scientific forecasting water yield of mine is of great significance to the safety production of mine and the colligated using of water resources. The paper established the forecasting model for water yield of mine, combining neural network with the partial least square method. Dealt with independent variables by the partial least square method, it can not only solve the relationship between independent variables but also reduce the input dimensions in neural network model, and then use the neural network which can solve the non-linear problem better. The result of an example shows that the prediction has higher precision in forecasting and fitting. 展开更多
关键词 water yield of mine partial least square method neural network forecasting model
下载PDF
Comparison of Missing Data Imputation Methods in Time Series Forecasting 被引量:1
13
作者 Hyun Ahn Kyunghee Sun Kwanghoon Pio Kim 《Computers, Materials & Continua》 SCIE EI 2022年第1期767-779,共13页
Time series forecasting has become an important aspect of data analysis and has many real-world applications.However,undesirable missing values are often encountered,which may adversely affect many forecasting tasks.I... Time series forecasting has become an important aspect of data analysis and has many real-world applications.However,undesirable missing values are often encountered,which may adversely affect many forecasting tasks.In this study,we evaluate and compare the effects of imputationmethods for estimating missing values in a time series.Our approach does not include a simulation to generate pseudo-missing data,but instead perform imputation on actual missing data and measure the performance of the forecasting model created therefrom.In an experiment,therefore,several time series forecasting models are trained using different training datasets prepared using each imputation method.Subsequently,the performance of the imputation methods is evaluated by comparing the accuracy of the forecasting models.The results obtained from a total of four experimental cases show that the k-nearest neighbor technique is the most effective in reconstructing missing data and contributes positively to time series forecasting compared with other imputation methods. 展开更多
关键词 Missing data imputation method time series forecasting LSTM
下载PDF
A New Type of Combination Forecasting Method Based on PLS——The Application of It in Cigarette Sales Forecasting 被引量:1
14
作者 Biao Luo Liang Wan +1 位作者 Wei-Wei Yan Jie-Jie Yu 《American Journal of Operations Research》 2012年第3期408-416,共9页
Cigarette market is a kind of monopoly market which is closed loop running, it depends on the plan mechanism to schedule producing, supplying and selling, but the “bullwhip effect” still exists. So it has a fundamen... Cigarette market is a kind of monopoly market which is closed loop running, it depends on the plan mechanism to schedule producing, supplying and selling, but the “bullwhip effect” still exists. So it has a fundamental significance to do sales forecasting work. It needs to considerate the double trend characteristics, history sales data and other main factors that affect cigarette sales. This paper depends on the panel data of A province’s cigarette sales, first we established three single forecasting models, after getting the predicted value of these single models, then using the combination forecasting method which based on PLS to predict the province’s cigarette sales of the next year. The results show that the prediction accuracy is good, which could provide a certain reference to cigarette sales forecasting in A province. 展开更多
关键词 PLS ARMA Time Series method Combination forecasting method SALES forecast
下载PDF
Forecasting available parking space with largest Lyapunov exponents method 被引量:3
15
作者 季彦婕 汤斗南 +2 位作者 郭卫红 BLYTHE T.Phil 王炜 《Journal of Central South University》 SCIE EI CAS 2014年第4期1624-1632,共9页
The techniques to forecast available parking space(APS) are indispensable components for parking guidance systems(PGS). According to the data collected in Newcastle upon Tyne, England, the changing characteristics of ... The techniques to forecast available parking space(APS) are indispensable components for parking guidance systems(PGS). According to the data collected in Newcastle upon Tyne, England, the changing characteristics of APS were studied. Thereafter, aiming to build up a multi-step APS forecasting model that provides richer information than a conventional one-step model, the largest Lyapunov exponents(largest LEs) method was introduced into PGS. By experimental tests conducted using the same dataset, its prediction performance was compared with traditional wavelet neural network(WNN) method in both one-step and multi-step processes. Based on the results, a new multi-step forecasting model called WNN-LE method was proposed, where WNN, which enjoys a more accurate performance along with a better learning ability in short-term forecasting, was applied in the early forecast steps while the Lyapunov exponent prediction method in the latter steps precisely reflect the chaotic feature in latter forecast period. The MSE of APS forecasting for one hour time period can be reduced from 83.1 to 27.1(in a parking building with 492 berths) by using largest LEs method instead of WNN and further reduced to 19.0 by conducted the new method. 展开更多
关键词 available parking space Lyapunov exponents wavelet neural network multi-step forecasting method
下载PDF
Forecasting Methods to Reduce Inventory Level in Supply Chain 被引量:1
16
作者 Tiantian Cai Xiaoshen Li 《Journal of Applied Mathematics and Physics》 2022年第2期301-310,共10页
Based on the two-level supply chain composed of suppliers and retailers, we assume that market demand is subject to an ARIMA(1, 1, 1). The supplier uses the minimum mean square error method (MMSE), the simple moving a... Based on the two-level supply chain composed of suppliers and retailers, we assume that market demand is subject to an ARIMA(1, 1, 1). The supplier uses the minimum mean square error method (MMSE), the simple moving average method (SMA) and the weighted moving average method (WMA) respectively to forecast the market demand. According to the statistical properties of stationary time series, we calculate the mean square error between supplier forecast demand and market demand. Through the simulation, we compare the forecasting effects of the three methods and analyse the influence of the lead-time L and the moving average parameter N on prediction. The results show that the forecasting effect of the MMSE method is the best, of the WMA method is the second, and of the SMA method is the last. The results also show that reducing the lead-time and increasing the moving average parameter improve the prediction accuracy and reduce the supplier inventory level. 展开更多
关键词 Supply Chain forecasting method ARIMA(1 1 1) Model Mean Square Error
下载PDF
A new two-step variational model for multiplicative noise removal with applications to texture images
17
作者 ZHANG Long-hui YAO Wen-juan +2 位作者 SHI Sheng-zhu GUO Zhi-chang ZHANG Da-zhi 《Applied Mathematics(A Journal of Chinese Universities)》 SCIE CSCD 2024年第3期486-501,共16页
Multiplicative noise removal problems have attracted much attention in recent years.Unlike additive noise,multiplicative noise destroys almost all information of the original image,especially for texture images.Motiva... Multiplicative noise removal problems have attracted much attention in recent years.Unlike additive noise,multiplicative noise destroys almost all information of the original image,especially for texture images.Motivated by the TV-Stokes model,we propose a new two-step variational model to denoise the texture images corrupted by multiplicative noise with a good geometry explanation in this paper.In the first step,we convert the multiplicative denoising problem into an additive one by the logarithm transform and propagate the isophote directions in the tangential field smoothing.Once the isophote directions are constructed,an image is restored to fit the constructed directions in the second step.The existence and uniqueness of the solution to the variational problems are proved.In these two steps,we use the gradient descent method and construct finite difference schemes to solve the problems.Especially,the augmented Lagrangian method and the fast Fourier transform are adopted to accelerate the calculation.Experimental results show that the proposed model can remove the multiplicative noise efficiently and protect the texture well. 展开更多
关键词 multiplicative noise removal texture images total variation two-step variational method aug-mented Lagrangian method
下载PDF
Study and application of time series forecasting based on rough set and Kernel method
18
作者 杨淑霞 《Journal of Central South University》 SCIE EI CAS 2008年第S2期336-340,共5页
A support vector machine time series forecasting model based on rough set data preprocessing was proposed by combining rough set attribute reduction and support vector machine regression algorithm. First, remove the r... A support vector machine time series forecasting model based on rough set data preprocessing was proposed by combining rough set attribute reduction and support vector machine regression algorithm. First, remove the redundant attribute for forecasting from condition attribute by rough set method; then use the minimum condition attribute set obtained after the reduction and the corresponding initial data, reform a new training sample set which only retain the important attributes influencing the forecasting accuracy; study and train the support vector machine with the training sample obtained after reduction, and then input the reformed testing sample set according to the minimum condition attribute and corresponding initial data. The model was tested and the mapping relation was got between the condition attribute and forecasting variable. Eventually, power supply and demand were forecasted in this model. The average absolute error rates of power consumption of the whole society and yearly maximum load are respectively 14.21% and 13.23%. It shows that RS-SVM time series forecasting model has high forecasting accuracy. 展开更多
关键词 KERNEL method support VECTOR MACHINE ROUGH SET forecasting
下载PDF
Adaptive Modeling and Forecasting of Time Series by Combining the Methods of Temporal Differences with Neural Networks
19
作者 杨璐 洪家荣 黄梯云 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 1996年第1期94-98,共5页
This paper discusses the modeling method of time series with neural network. In order to improve the adaptability of direct multi-step prediction models, this paper proposes a method of combining the temporal differen... This paper discusses the modeling method of time series with neural network. In order to improve the adaptability of direct multi-step prediction models, this paper proposes a method of combining the temporal differences methods with back-propagation algorithm for updating the parameters continuously on the basis of recent data. This method can make the neural network model fit the recent characteristic of the time series as close as possible, therefore improves the prediction accuracy. We built models and made predictions for the sunspot series. The prediction results of adaptive modeling method are better than that of non-adaptive modeling methods. 展开更多
关键词 ss: NEURAL network TIME SERIES forecasting TEMPORAL DIFFERENCES methodS
下载PDF
TIME SERIES NEURAL NETWORK FORECASTING METHODS
20
作者 文新辉 陈开周 《Journal of Electronics(China)》 1995年第1期1-8,共8页
This paper has discussed the possibility and key problem to construct the neural network time series model, and three time series neural network forecasting methods has been proposed, i. e. a neural network nonlinear ... This paper has discussed the possibility and key problem to construct the neural network time series model, and three time series neural network forecasting methods has been proposed, i. e. a neural network nonlinear time series model, a neural network multi-dimension time series model and a neural network combining predictive model. These three methods are applied to real problems. The results show that these methods are better than the traditional one. Furthermore, the neural network methods are compared with the traditional method, and the constructed model of intellectual information forecasting system is given. 展开更多
关键词 INFORMATION THEORY INFORMATION PROCESSING NEURAL NETWORK forecasting method
下载PDF
上一页 1 2 183 下一页 到第
使用帮助 返回顶部