As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wi...As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wind power(WP).Due to the randomness of WP output,higher requirements are put forward for the voltage stability of each node of the regional power grid,and various reactive power compensation devices(RPCDs)need to be rationally configured to meet the stable operation requirements of the system.This paper proposes an optimal configuration method for multi-type RPCDs in regional power grids with a high proportion of WP.The RPCDs are located according to the proposed static voltage stability index(VSI)and dynamicVSI based on dynamic voltage drop area,and the optimal configuration model of RPCDs is constructed with the lowest construction cost as the objective function to determine the installed capacity of various RPCDs.Finally,the corresponding regional power grid model for intensive access to WFs is constructed on the simulation platform to verify the effectiveness of the proposed method.展开更多
In urban water ecological restoration projects,the selection and configuration of wetland plants are crucial for water quality improvement,ecological diversity enhancement,and landscape beautification.Different plants...In urban water ecological restoration projects,the selection and configuration of wetland plants are crucial for water quality improvement,ecological diversity enhancement,and landscape beautification.Different plants have different characteristics,and a scientific and rational selection and optimization of plant species is needed.This paper proposes an optimized plant selection and configuration scheme for urban water ecological restoration based on the ecological characteristics and pollutant removal performance of wetland plants.It analyzes the diversity,removal mechanisms,and configuration modes of wetland plants,taking into account ecology,aesthetics,and cost-effectiveness,to provide scientific evidence for wetland plant configuration and support water environment management decision-making.展开更多
To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model...To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.展开更多
Aim To obtain an optimizing range of the main configuration parameters of double swirls combustion system (DSCS) Methods To analyze the influence of DS combustion cham-ber configuration parameters on fuel spray and mi...Aim To obtain an optimizing range of the main configuration parameters of double swirls combustion system (DSCS) Methods To analyze the influence of DS combustion cham-ber configuration parameters on fuel spray and mixing by means of the fuel jet developmentperiphery charts obtained by the high speed photography with a modeling test device deve-loped by authors,and to examine it by the tests on a single cylinder diesel engine.Resultsand Conclusion The mixing process can be divided into four phases.The optimizing range of the ration of the inner chamber diameter to the cylinder bore,d2/D,is 0.4-0.7; and the outerchamber diameter,d1 the height of the circular ridge to the piston top face,h1,the radius of outer/inner chamber circle,R1,R2 ,the max depth of outer/inner chamber bowl,H1,H2,etc. are also important展开更多
An extended crowding genetic algorithm (ECGA) is introduced for solvingoptimal pump configuration problem, which was presented by T. Westerlund in 1994. This problem hasbeen found to be non-convex, and the objective f...An extended crowding genetic algorithm (ECGA) is introduced for solvingoptimal pump configuration problem, which was presented by T. Westerlund in 1994. This problem hasbeen found to be non-convex, and the objective function contained several local optima and globaloptimality could not be ensured by all the traditional MINLP optimization method. The concepts ofspecies conserving and composite encoding are introduced to crowding genetic algorithm (CGA) formaintain the diversity of population more effectively and coping with the continuous and/or discretevariables in MINLP problem. The solution of three-levels pump configuration got from DICOPT++software (OA algorithm) is also given. By comparing with the solutions obtained from DICOPT++, ECPmethod, and MIN-MIN method, the ECGA algorithm proved to be very effective in finding the globaloptimal solution of multi-levels pump configuration via using the problem-specific information.展开更多
In order to improve the in-flight characteristics of the atomizing droplets during high velocity wire arc spraying (HVAS), some changes have been operated on the original design of the HVAS gun configuration. A compar...In order to improve the in-flight characteristics of the atomizing droplets during high velocity wire arc spraying (HVAS), some changes have been operated on the original design of the HVAS gun configuration. A comparative study was carried out to investigate the microstructure and properties of the coatings produced by the original design spraying gun and the modified one, using 3Cr13 wires of 3 mm in diameter. The characteristics of their jets were examined during spraying. The results indicate that, the included angle between the two wires and the distance from the nozzle to the meeting point of the two vires may have a strong influence on the characteristics of the in-flight droplets and then the coatings. The jet divergence is found to be lower than that of the original one (about 12° against 25°). By modified gun, the adhesion strength, the microhardness and porosity of the coating deposited by modified gun are increased by 39% and 9% respectively. And the porosity of the coatings is decreased by 57%.展开更多
ARINC653 systems, which have been widely used in avionics industry, are an important class of safety-critical applications. Partitions are the core concept in the Arinc653 system architecture. Due to the existence of ...ARINC653 systems, which have been widely used in avionics industry, are an important class of safety-critical applications. Partitions are the core concept in the Arinc653 system architecture. Due to the existence of partitions, the system designer must allocate adequate time slots statically to each partition in the design phase. Although some time slot allocation policies could be borrowed from task scheduling policies, no existing literatures give an optimal allocation policy. In this paper, we present a partition configuration policy and prove that this policy is optimal in the sense that if this policy fails to configure adequate time slots to each partition, nor do other policies. Then, by simulation, we show the effects of different partition configuration policies on time slot allocation of partitions and task response time, respectively.展开更多
The high-energy consumption and high construction density of 5G base stations have greatly increased the demand for backup energy storage batteries.To maximize overall benefits for the investors and operators of base ...The high-energy consumption and high construction density of 5G base stations have greatly increased the demand for backup energy storage batteries.To maximize overall benefits for the investors and operators of base station energy storage,we proposed a bi-level optimization model for the operation of the energy storage,and the planning of 5G base stations considering the sleep mechanism.A multi-base station cooperative system composed of 5G acer stations was considered as the research object,and the outer goal was to maximize the net profit over the complete life cycle of the energy storage.Furthermore,the power and capacity of the energy storage configuration were optimized.The inner goal included the sleep mechanism of the base station,and the optimization of the energy storage charging and discharging strategy,for minimizing the daily electricity expenditure of the 5G base station system.Additionally,genetic algorithm and mixed integer programming were used to solve the bi-level optimization model,analyze the numerical example test comparison of the three types of batteries and the net income of the configuration,and finally verify the validity of the model.Furthermore,the sleep mechanism,the charging and discharging strategy for energy consumption,and the economic benefits for the operators were investigated to provide reference for the 5G base station energy storage configuration.展开更多
This article investigates the optimal observation configuration of unmanned aerial vehicles(UAVs) based on angle and range measurements, and generalizes predecessors' researches in two dimensions into three dimens...This article investigates the optimal observation configuration of unmanned aerial vehicles(UAVs) based on angle and range measurements, and generalizes predecessors' researches in two dimensions into three dimensions. The relative geometry of the UAVs-target will significantly affect the state estimation performance of the target, the cost function based on the Fisher information matrix(FIM) is used to derive the FIM determinant of UAVs' observation in three-dimensional space, and the optimal observation geometric configuration that maximizes the determinant of the FIM is obtained. It is shown that the optimal observation configuration of the UAVs-target is usually not unique, and the optimal observation configuration is proved for two UAVs and three UAVs in three-dimension. The long-range over-the-horizon target tracking is simulated and analyzed based on the analysis of optimal observation configuration for two UAVs. The simulation results show that the theoretical analysis and control algorithm can effectively improve the positioning accuracy of the target. It can provide a helpful reference for the design of over-the-horizon target localization based on UAVs.展开更多
The production process plan design and configurations of reconfigurable machine tool (RMT) interact with each other. Reasonable process plans with suitable configurations of RMT help to improve product quality and r...The production process plan design and configurations of reconfigurable machine tool (RMT) interact with each other. Reasonable process plans with suitable configurations of RMT help to improve product quality and reduce production cost. Therefore, a cooperative strategy is needed to concurrently solve the above issue. In this paper, the cooperative optimization model for RMT configurations and production process plan is presented. Its objectives take into account both impacts of process and configuration. Moreover, a novel genetic algorithm is also developed to provide optimal or near-optimal solutions: firstly, its chromosome is redesigned which is composed of three parts, operations, process plan and configurations of RMTs, respectively; secondly, its new selection, crossover and mutation operators are also developed to deal with the process constraints from operation processes (OP) graph, otherwise these operators could generate illegal solutions violating the limits; eventually the optimal configurations for RMT under optimal process plan design can be obtained. At last, a manufacturing line case is applied which is composed of three RMTs. It is shown from the case that the optimal process plan and configurations of RMT are concurrently obtained, and the production cost decreases 6.28% and nonmonetary performance increases 22%. The proposed method can figure out both RMT configurations and production process, improve production capacity, functions and equipment utilization for RMT.展开更多
A thruster configuration and optimization method for GEO satellite is proposed in this paper.All thrusters are installed on the back panel of satellite,which is not only compatible with the design of satellite subdivi...A thruster configuration and optimization method for GEO satellite is proposed in this paper.All thrusters are installed on the back panel of satellite,which is not only compatible with the design of satellite subdivision structure,but also able to provide a large installation room for the payloads and components carried by the satellite.Chemical thruster and electric thruster were selected because they have complementary advantages and can effectively reduce propellant consumption.The working mode and tasks of the thruster were analyzed in detail for thruster configuration,which was optimized in order to minimize propellant consumption.Lastly,a GEO satellite thruster was configured and optimized using this method,with results showing that the method is feasible and effective,and consequently has value for engineering applications.展开更多
Line configuration and balancing is to select the type of line and allot a given set of operations as well as machines to a sequence of workstations to realize high-efficiency production. Most of the current researche...Line configuration and balancing is to select the type of line and allot a given set of operations as well as machines to a sequence of workstations to realize high-efficiency production. Most of the current researches for machining line configuration and balancing problems are related to dedicated transfer lines with dedicated machine workstations. With growing trends towards great product variety and fluctuations in market demand, dedicated transfer lines are being replaced with flexible machining line composed of identical CNC machines. This paper deals with the line configuration and balancing problem for flexible machining lines. The objective is to assign operations to workstations and find the sequence of execution, specify the number of machines in each workstation while minimizing the line cycle time and total number of machines. This problem is subject to precedence, clustering, accessibility and capacity constraints among the features, operations, setups and workstations. The mathematical model and heuristic algorithm based on feature group strategy and polychromatic sets theory are presented to find an optimal solution. The feature group strategy and polychromatic sets theory are used to establish constraint model. A heuristic operations sequencing and assignment algorithm is given. An industrial case study is carried out, and multiple optimal solutions in different line configurations are obtained. The case studying results show that the solutions with shorter cycle time and higher line balancing rate demonstrate the feasibility and effectiveness of the proposed algorithm. This research proposes a heuristic line configuration and balancing algorithm based on feature group strategy and polychromatic sets theory which is able to provide better solutions while achieving an improvement in computing time.展开更多
Spares inventory configuration optimization is an effective way to improve readiness and reduce life cycle cost of equipment.Through analyzing two-echelon spares support system,the METRIC model basic theory was used.A...Spares inventory configuration optimization is an effective way to improve readiness and reduce life cycle cost of equipment.Through analyzing two-echelon spares support system,the METRIC model basic theory was used.An inventory configuration optimization model of two-echelon spares support system was proposed which took the spares expected shortfall as the object and made the minimum repairable parts expected shortfall instead of the maximum spares supportability as the objective function.Marginal efficiency analysis algorithm was applied to optimizing the spares configuration and generating a rational spares inventory configuration.Finally,several examples are given to verify the model.展开更多
Electrical power companies are using more underground cables rather than overhead lines to distribute power to their customers. In practice, cables are generally installed in some compact ductbanks. Since the cost of ...Electrical power companies are using more underground cables rather than overhead lines to distribute power to their customers. In practice, cables are generally installed in some compact ductbanks. Since the cost of underground cables is very expensive, using the entire space of a ductbank is extremely important. But such usage is limited due to the overheating of cables. Overheating is generally caused by overload, which means the carrying current exceeds the ampacity of a cable. The ampacity of a cable depends on not only the material and design of a cable but also the distance between different cables. Thus the configuration of cables determines the total ampacity value and the potential use of a ductbank. In this paper, the best configuration based on ampacity is achieved for a three-row, five-column ductbank that is buried at a depth of one meter below the earth’s surface. Both balanced and unbalanced scenarios are considered, and all cables have two available types to be selected.展开更多
Industrial robots are increasingly being used in machining tasks because of their high flexibility and intelligence.However,the low structural stiffness of a robot significantly affects its positional accuracy and the...Industrial robots are increasingly being used in machining tasks because of their high flexibility and intelligence.However,the low structural stiffness of a robot significantly affects its positional accuracy and the machining quality of its operation equipment.Studying robot stiffness characteristics and optimization methods is an effective method of improving the stiffness performance of a robot.Accordingly,aiming at the poor accuracy of stiffness modeling caused by approximating the stiffness of each joint as a constant,a variable stiffness identification method is proposed based on space gridding.Subsequently,a task-oriented axial stiffness evaluation index is proposed to quantitatively assess the stiffness performance in the machining direction.In addition,by analyzing the redundant kinematic characteristics of the robot machining system,a configuration optimization method is further developed to maximize the index.For numerous points or trajectory-processing tasks,a configuration smoothing strategy is proposed to rapidly acquire optimized configurations.Finally,experiments on a KR500 robot were conducted to verify the feasibility and validity of the proposed stiffness identification and configuration optimization methods.展开更多
This paper presents a method for optimizing the configuration of a multilimbed robot (the robot with both arms and legs) which works with a big load. A least-effort criterion is proposed as the base of optimization. W...This paper presents a method for optimizing the configuration of a multilimbed robot (the robot with both arms and legs) which works with a big load. A least-effort criterion is proposed as the base of optimization. When the applying Cartesian force and the task point are given, the best configuration of the robot will be easily found through a series of imaginary motions of the robot and some simple computations. The imaginary motion varies with the working environment related to the construction of the robot, the task point and the force direction. The working environment could be predicted by the proposed inequalities, so that the way of motion could be decided in advance.展开更多
Dielectric barrier discharge (DBD) has been widely employed in ozone generation.However,the technology still exhibits relatively low energy yield (E_(Y)) referring to its theoretical value.In this work,E_(Y)of ozone g...Dielectric barrier discharge (DBD) has been widely employed in ozone generation.However,the technology still exhibits relatively low energy yield (E_(Y)) referring to its theoretical value.In this work,E_(Y)of ozone generation was improved by optimizing the mesh number,electrode length,and dielectric material in a coaxial DBD reactor with two wire mesh electrodes.Meanwhile,the discharge characteristics were investigated to elucidate the effect of reactor configuration on E_(Y).Results showed that the discharge characteristics were improved by increasing the mesh number,electrode length,and relative permittivity.When the mesh number was increased from 40 to 100,an improvement of approximately 48%in E_(Y) was obtained.Additionally,higher E_(Y) values were obtained using corundum as the dielectric material relative to polytetrafluoroethylene and quartz.Ultimately,E_(Y) in the optimal DBD reactor could reach 326.77 g·(k W·h)^(-1).Compared with the reported DBD reactor,the coaxial DBD reactor with the mesh electrode and the dielectric material of corundum could effectively improve E_(Y),which lays a foundation for the design of high-efficiency coaxial DBD reactor.展开更多
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p...Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.展开更多
To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of re...To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.展开更多
This paper proposed a new type of combined cooling heating and power(CCHP)system,including the parabolic trough solar thermal(PTST)power generation and gas turbine power generation.The thermal energy storage subsystem...This paper proposed a new type of combined cooling heating and power(CCHP)system,including the parabolic trough solar thermal(PTST)power generation and gas turbine power generation.The thermal energy storage subsystem in the PTST unit provides both thermal energy and electrical energy.Based on the life cycle method,the configuration optimization under eight operation strategies is studied with the economy,energy,and environment indicators.The eight operation strategies include FEL,FEL-EC,FEL-TES,FEL-TES&EC,FTL,FTL-EC,FTL-TES,and FTL-TES&EC.The feasibility of each strategy is verified by taking a residential building cluster as an example.The indicators under the optimal configuration of each strategy are compared with that of the separate production(SP)system.The results showed that the PTST-CCHP system improves the environment and energy performance by changing the ratio of thermal energy and electric energy.The environment and energy indicators of FEL-TES&EC are superior to those of FTL-TES&EC in summer,and the results are just the opposite in winter.The initial annual investment of the PTST-CCHP system is higher than that of the SP system,but its economic performance is better than that of the SP system with the increase of life-cycle.展开更多
基金supported by the Science and Technology Project of State Grid Corporation Headquarters(No.5100-202323008A-1-1-ZN).
文摘As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wind power(WP).Due to the randomness of WP output,higher requirements are put forward for the voltage stability of each node of the regional power grid,and various reactive power compensation devices(RPCDs)need to be rationally configured to meet the stable operation requirements of the system.This paper proposes an optimal configuration method for multi-type RPCDs in regional power grids with a high proportion of WP.The RPCDs are located according to the proposed static voltage stability index(VSI)and dynamicVSI based on dynamic voltage drop area,and the optimal configuration model of RPCDs is constructed with the lowest construction cost as the objective function to determine the installed capacity of various RPCDs.Finally,the corresponding regional power grid model for intensive access to WFs is constructed on the simulation platform to verify the effectiveness of the proposed method.
基金2023 Beilin District Science and Technology Plan Project(Project No.GX2339)the 2024 Xi’an Science and Technology Plan Project(Project No.24GXFW0065).
文摘In urban water ecological restoration projects,the selection and configuration of wetland plants are crucial for water quality improvement,ecological diversity enhancement,and landscape beautification.Different plants have different characteristics,and a scientific and rational selection and optimization of plant species is needed.This paper proposes an optimized plant selection and configuration scheme for urban water ecological restoration based on the ecological characteristics and pollutant removal performance of wetland plants.It analyzes the diversity,removal mechanisms,and configuration modes of wetland plants,taking into account ecology,aesthetics,and cost-effectiveness,to provide scientific evidence for wetland plant configuration and support water environment management decision-making.
基金The National Natural Science Foundation of China(No.51377021)the Science and Technology Project of State Grid Corporation of China(No.SGTJDK00DWJS1600014)
文摘To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.
文摘Aim To obtain an optimizing range of the main configuration parameters of double swirls combustion system (DSCS) Methods To analyze the influence of DS combustion cham-ber configuration parameters on fuel spray and mixing by means of the fuel jet developmentperiphery charts obtained by the high speed photography with a modeling test device deve-loped by authors,and to examine it by the tests on a single cylinder diesel engine.Resultsand Conclusion The mixing process can be divided into four phases.The optimizing range of the ration of the inner chamber diameter to the cylinder bore,d2/D,is 0.4-0.7; and the outerchamber diameter,d1 the height of the circular ridge to the piston top face,h1,the radius of outer/inner chamber circle,R1,R2 ,the max depth of outer/inner chamber bowl,H1,H2,etc. are also important
基金This project is supported by Provincial Science Foundation of Hebei (No.01213553).
文摘An extended crowding genetic algorithm (ECGA) is introduced for solvingoptimal pump configuration problem, which was presented by T. Westerlund in 1994. This problem hasbeen found to be non-convex, and the objective function contained several local optima and globaloptimality could not be ensured by all the traditional MINLP optimization method. The concepts ofspecies conserving and composite encoding are introduced to crowding genetic algorithm (CGA) formaintain the diversity of population more effectively and coping with the continuous and/or discretevariables in MINLP problem. The solution of three-levels pump configuration got from DICOPT++software (OA algorithm) is also given. By comparing with the solutions obtained from DICOPT++, ECPmethod, and MIN-MIN method, the ECGA algorithm proved to be very effective in finding the globaloptimal solution of multi-levels pump configuration via using the problem-specific information.
基金Project (50235030) supported by the National Natural Science Foundation of China
文摘In order to improve the in-flight characteristics of the atomizing droplets during high velocity wire arc spraying (HVAS), some changes have been operated on the original design of the HVAS gun configuration. A comparative study was carried out to investigate the microstructure and properties of the coatings produced by the original design spraying gun and the modified one, using 3Cr13 wires of 3 mm in diameter. The characteristics of their jets were examined during spraying. The results indicate that, the included angle between the two wires and the distance from the nozzle to the meeting point of the two vires may have a strong influence on the characteristics of the in-flight droplets and then the coatings. The jet divergence is found to be lower than that of the original one (about 12° against 25°). By modified gun, the adhesion strength, the microhardness and porosity of the coating deposited by modified gun are increased by 39% and 9% respectively. And the porosity of the coatings is decreased by 57%.
基金supported by the National Natural Science Foundation of China under Grant No. 90718019the National High-Tech Research and Development Plan of China under Grant No. 2007AA010304
文摘ARINC653 systems, which have been widely used in avionics industry, are an important class of safety-critical applications. Partitions are the core concept in the Arinc653 system architecture. Due to the existence of partitions, the system designer must allocate adequate time slots statically to each partition in the design phase. Although some time slot allocation policies could be borrowed from task scheduling policies, no existing literatures give an optimal allocation policy. In this paper, we present a partition configuration policy and prove that this policy is optimal in the sense that if this policy fails to configure adequate time slots to each partition, nor do other policies. Then, by simulation, we show the effects of different partition configuration policies on time slot allocation of partitions and task response time, respectively.
基金supported by the State Grid Science and Technology Project(KJ21-1-56).
文摘The high-energy consumption and high construction density of 5G base stations have greatly increased the demand for backup energy storage batteries.To maximize overall benefits for the investors and operators of base station energy storage,we proposed a bi-level optimization model for the operation of the energy storage,and the planning of 5G base stations considering the sleep mechanism.A multi-base station cooperative system composed of 5G acer stations was considered as the research object,and the outer goal was to maximize the net profit over the complete life cycle of the energy storage.Furthermore,the power and capacity of the energy storage configuration were optimized.The inner goal included the sleep mechanism of the base station,and the optimization of the energy storage charging and discharging strategy,for minimizing the daily electricity expenditure of the 5G base station system.Additionally,genetic algorithm and mixed integer programming were used to solve the bi-level optimization model,analyze the numerical example test comparison of the three types of batteries and the net income of the configuration,and finally verify the validity of the model.Furthermore,the sleep mechanism,the charging and discharging strategy for energy consumption,and the economic benefits for the operators were investigated to provide reference for the 5G base station energy storage configuration.
基金supported by the National Natural Science Foundation of China(61703419)。
文摘This article investigates the optimal observation configuration of unmanned aerial vehicles(UAVs) based on angle and range measurements, and generalizes predecessors' researches in two dimensions into three dimensions. The relative geometry of the UAVs-target will significantly affect the state estimation performance of the target, the cost function based on the Fisher information matrix(FIM) is used to derive the FIM determinant of UAVs' observation in three-dimensional space, and the optimal observation geometric configuration that maximizes the determinant of the FIM is obtained. It is shown that the optimal observation configuration of the UAVs-target is usually not unique, and the optimal observation configuration is proved for two UAVs and three UAVs in three-dimension. The long-range over-the-horizon target tracking is simulated and analyzed based on the analysis of optimal observation configuration for two UAVs. The simulation results show that the theoretical analysis and control algorithm can effectively improve the positioning accuracy of the target. It can provide a helpful reference for the design of over-the-horizon target localization based on UAVs.
基金supported by National Natural Science Foundation of China (Grant Nos. 51005169, 50875187, 50975209)Shanghai Municipal Natural Science Foundation of China (Grant No. 10ZR1432300)+1 种基金International Science & Technology Cooperation Program of China (Grant No. 2012DFG72210)Zhejiang Provincial Key International Science & Technology Cooperation Program of China (Grant No. 2011C14025)
文摘The production process plan design and configurations of reconfigurable machine tool (RMT) interact with each other. Reasonable process plans with suitable configurations of RMT help to improve product quality and reduce production cost. Therefore, a cooperative strategy is needed to concurrently solve the above issue. In this paper, the cooperative optimization model for RMT configurations and production process plan is presented. Its objectives take into account both impacts of process and configuration. Moreover, a novel genetic algorithm is also developed to provide optimal or near-optimal solutions: firstly, its chromosome is redesigned which is composed of three parts, operations, process plan and configurations of RMTs, respectively; secondly, its new selection, crossover and mutation operators are also developed to deal with the process constraints from operation processes (OP) graph, otherwise these operators could generate illegal solutions violating the limits; eventually the optimal configurations for RMT under optimal process plan design can be obtained. At last, a manufacturing line case is applied which is composed of three RMTs. It is shown from the case that the optimal process plan and configurations of RMT are concurrently obtained, and the production cost decreases 6.28% and nonmonetary performance increases 22%. The proposed method can figure out both RMT configurations and production process, improve production capacity, functions and equipment utilization for RMT.
基金Sponsored by the National Natural Science Foundation of China(Grant No.61333008)
文摘A thruster configuration and optimization method for GEO satellite is proposed in this paper.All thrusters are installed on the back panel of satellite,which is not only compatible with the design of satellite subdivision structure,but also able to provide a large installation room for the payloads and components carried by the satellite.Chemical thruster and electric thruster were selected because they have complementary advantages and can effectively reduce propellant consumption.The working mode and tasks of the thruster were analyzed in detail for thruster configuration,which was optimized in order to minimize propellant consumption.Lastly,a GEO satellite thruster was configured and optimized using this method,with results showing that the method is feasible and effective,and consequently has value for engineering applications.
基金Supported by Shanghai Municipal Science and Technology Commission(Grant No.12JC1408700)National Science and Technology Major Project of the Ministry of Science and Technology of China(Grant Nos.2013ZX04012-071,2011ZX04015-022)
文摘Line configuration and balancing is to select the type of line and allot a given set of operations as well as machines to a sequence of workstations to realize high-efficiency production. Most of the current researches for machining line configuration and balancing problems are related to dedicated transfer lines with dedicated machine workstations. With growing trends towards great product variety and fluctuations in market demand, dedicated transfer lines are being replaced with flexible machining line composed of identical CNC machines. This paper deals with the line configuration and balancing problem for flexible machining lines. The objective is to assign operations to workstations and find the sequence of execution, specify the number of machines in each workstation while minimizing the line cycle time and total number of machines. This problem is subject to precedence, clustering, accessibility and capacity constraints among the features, operations, setups and workstations. The mathematical model and heuristic algorithm based on feature group strategy and polychromatic sets theory are presented to find an optimal solution. The feature group strategy and polychromatic sets theory are used to establish constraint model. A heuristic operations sequencing and assignment algorithm is given. An industrial case study is carried out, and multiple optimal solutions in different line configurations are obtained. The case studying results show that the solutions with shorter cycle time and higher line balancing rate demonstrate the feasibility and effectiveness of the proposed algorithm. This research proposes a heuristic line configuration and balancing algorithm based on feature group strategy and polychromatic sets theory which is able to provide better solutions while achieving an improvement in computing time.
文摘Spares inventory configuration optimization is an effective way to improve readiness and reduce life cycle cost of equipment.Through analyzing two-echelon spares support system,the METRIC model basic theory was used.An inventory configuration optimization model of two-echelon spares support system was proposed which took the spares expected shortfall as the object and made the minimum repairable parts expected shortfall instead of the maximum spares supportability as the objective function.Marginal efficiency analysis algorithm was applied to optimizing the spares configuration and generating a rational spares inventory configuration.Finally,several examples are given to verify the model.
文摘Electrical power companies are using more underground cables rather than overhead lines to distribute power to their customers. In practice, cables are generally installed in some compact ductbanks. Since the cost of underground cables is very expensive, using the entire space of a ductbank is extremely important. But such usage is limited due to the overheating of cables. Overheating is generally caused by overload, which means the carrying current exceeds the ampacity of a cable. The ampacity of a cable depends on not only the material and design of a cable but also the distance between different cables. Thus the configuration of cables determines the total ampacity value and the potential use of a ductbank. In this paper, the best configuration based on ampacity is achieved for a three-row, five-column ductbank that is buried at a depth of one meter below the earth’s surface. Both balanced and unbalanced scenarios are considered, and all cables have two available types to be selected.
基金National Natural Science Foundation of China(Grant No.51875287)National Defense Basic Scientific Research Program of China(Grant No.JCKY2018605C002)Jiangsu Provincial Natural Science Foundation of China(Grant No.BK20190417).
文摘Industrial robots are increasingly being used in machining tasks because of their high flexibility and intelligence.However,the low structural stiffness of a robot significantly affects its positional accuracy and the machining quality of its operation equipment.Studying robot stiffness characteristics and optimization methods is an effective method of improving the stiffness performance of a robot.Accordingly,aiming at the poor accuracy of stiffness modeling caused by approximating the stiffness of each joint as a constant,a variable stiffness identification method is proposed based on space gridding.Subsequently,a task-oriented axial stiffness evaluation index is proposed to quantitatively assess the stiffness performance in the machining direction.In addition,by analyzing the redundant kinematic characteristics of the robot machining system,a configuration optimization method is further developed to maximize the index.For numerous points or trajectory-processing tasks,a configuration smoothing strategy is proposed to rapidly acquire optimized configurations.Finally,experiments on a KR500 robot were conducted to verify the feasibility and validity of the proposed stiffness identification and configuration optimization methods.
文摘This paper presents a method for optimizing the configuration of a multilimbed robot (the robot with both arms and legs) which works with a big load. A least-effort criterion is proposed as the base of optimization. When the applying Cartesian force and the task point are given, the best configuration of the robot will be easily found through a series of imaginary motions of the robot and some simple computations. The imaginary motion varies with the working environment related to the construction of the robot, the task point and the force direction. The working environment could be predicted by the proposed inequalities, so that the way of motion could be decided in advance.
基金supported by the National Natural Science Foundation of China (21725601 and 2187081058)。
文摘Dielectric barrier discharge (DBD) has been widely employed in ozone generation.However,the technology still exhibits relatively low energy yield (E_(Y)) referring to its theoretical value.In this work,E_(Y)of ozone generation was improved by optimizing the mesh number,electrode length,and dielectric material in a coaxial DBD reactor with two wire mesh electrodes.Meanwhile,the discharge characteristics were investigated to elucidate the effect of reactor configuration on E_(Y).Results showed that the discharge characteristics were improved by increasing the mesh number,electrode length,and relative permittivity.When the mesh number was increased from 40 to 100,an improvement of approximately 48%in E_(Y) was obtained.Additionally,higher E_(Y) values were obtained using corundum as the dielectric material relative to polytetrafluoroethylene and quartz.Ultimately,E_(Y) in the optimal DBD reactor could reach 326.77 g·(k W·h)^(-1).Compared with the reported DBD reactor,the coaxial DBD reactor with the mesh electrode and the dielectric material of corundum could effectively improve E_(Y),which lays a foundation for the design of high-efficiency coaxial DBD reactor.
基金funded by Major Science and Technology Projects in Gansu Province(19ZD2GA003).
文摘Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.
基金supported by Manage Innovation Project of China Southern Power Grid Co.,Ltd.(No.GZHKJXM20210232).
文摘To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.
基金supported by the National Natural Science Foundation of China(Grant No.51667013)the Research on Scheduling Control Technology of Photothermal Power Generation of The Power System with High Proportion New Energy on The Supply End(Grant No.SGGSKY00FJJS1900273).
文摘This paper proposed a new type of combined cooling heating and power(CCHP)system,including the parabolic trough solar thermal(PTST)power generation and gas turbine power generation.The thermal energy storage subsystem in the PTST unit provides both thermal energy and electrical energy.Based on the life cycle method,the configuration optimization under eight operation strategies is studied with the economy,energy,and environment indicators.The eight operation strategies include FEL,FEL-EC,FEL-TES,FEL-TES&EC,FTL,FTL-EC,FTL-TES,and FTL-TES&EC.The feasibility of each strategy is verified by taking a residential building cluster as an example.The indicators under the optimal configuration of each strategy are compared with that of the separate production(SP)system.The results showed that the PTST-CCHP system improves the environment and energy performance by changing the ratio of thermal energy and electric energy.The environment and energy indicators of FEL-TES&EC are superior to those of FTL-TES&EC in summer,and the results are just the opposite in winter.The initial annual investment of the PTST-CCHP system is higher than that of the SP system,but its economic performance is better than that of the SP system with the increase of life-cycle.