This work proposes a numerical investigation on the effects of damage on the structural response of Reinforced Concrete(RC)bridge structures commonly adopted in highway and railway networks.An effective three-dimensio...This work proposes a numerical investigation on the effects of damage on the structural response of Reinforced Concrete(RC)bridge structures commonly adopted in highway and railway networks.An effective three-dimensional FE-based numerical model is developed to analyze the bridge’s structural response under several damage scenarios,including the effects of moving vehicle loads.In particular,the longitudinal and transversal beams are modeled through solid finite elements,while horizontal slabs are made of shell elements.Damage phenomena are also incorporated in the numerical model according to a smeared approach consistent with Continuum Damage Mechanics(CDM).In such a context,the proposed method utilizes an advanced and efficient computational strategy for reproducing Vehicle-Bridge Interaction(VBI)effects based on a moving mesh technique consistent with the Arbitrary Lagrangian-Eulerian(ALE)formulation.The proposed model adopts a moving mesh interface for tracing the positions of the contact points between the vehicle’s wheels and the bridge slabs.Such modeling strategy avoids using extremely refined discretization for structural members,thus drastically reducing computational efforts.Vibrational analyses in terms of damage scenarios are presented to verify how the presence of damage affects the natural frequencies of the structural system.In addition,a comprehensive investigation regarding the response of the bridge under moving vehicles is developed,also providing results in terms of Dynamic Amplification Factor(DAFs)for typical design bridge variables.展开更多
The laser-cladding technique for welding of bridge wires is reported for the first time.The essen- tial feature of this technique different from the cur- rent methods is the realization of mutual melting of workpieces...The laser-cladding technique for welding of bridge wires is reported for the first time.The essen- tial feature of this technique different from the cur- rent methods is the realization of mutual melting of workpieces.Thus the stability of products is im- proved in an order of magnitude.The main points of the technique and the microanalyses of the weld- ing spot and other features are given.The technique presented is a novel method of welding between tiny piece and workpiece of different sizes and proper- ties.展开更多
Ilio-inguinal lymph node dissection(IILD) is a commonly performed surgical procedure for a number of malignant conditions involving mainly the male and female genitalia, and the skin; however the postoperative morbidi...Ilio-inguinal lymph node dissection(IILD) is a commonly performed surgical procedure for a number of malignant conditions involving mainly the male and female genitalia, and the skin; however the postoperative morbidity of IILD, due to high frequency of flap necrosis, wound infection and seroma formation, has always been a major concern for the surgeons. The aim of the study is to highlight a modified skin bridge technique of IILD using two parallel curvilinear incisions to minimize postoperative skin flap necrosis. This technique was successfully employed in 38 IILD during May 2012 to November 2013. None of the patient had flap necrosis. Two patients developed seroma while another two patients had superficial surgical site infection; they were managed conservatively. Modified skin bridge technique for IILD is an effective method to minimize flap necrosis without compromising the oncological safety.展开更多
Based on Edong Yangtze River Bridge, which is the second longest hybrid girder cable stayed bridge with 926 m long main span, the influencing factors and crucial techniques of the main span closure method for long spa...Based on Edong Yangtze River Bridge, which is the second longest hybrid girder cable stayed bridge with 926 m long main span, the influencing factors and crucial techniques of the main span closure method for long span hybrid girder cable stayed bridge are studied. After theoretical analysis, numerical evaluation and practical test, the loading assistant closure method is employed in Edong Yangtze River Bridge. The loading assistant closure method, with better thermal adaptability and less influence on bridge line and the forced status, can meet the requirements of the unstressed state control method. Based on the mentioned advantages, the loading assistant closure method is applicable to long span hybrid girder cable stayed bridges. The conclusion can provide a reference for the further design of the similar brid^es.展开更多
To evaluate the effect of treating long cracks with the impact crack-closure retrofit(ICR)technique,three rib-to-deck welded specimens with a crack length of about 100 mm were tested.The metallographic structure,crack...To evaluate the effect of treating long cracks with the impact crack-closure retrofit(ICR)technique,three rib-to-deck welded specimens with a crack length of about 100 mm were tested.The metallographic structure,crack section,crack propagation life,and stress variation were analyzed.Finite-element models were also developed,and some optimal values of certain parameters are suggested according to the simulated results.The results show that new crack sources are generated on both sides of the ICR-treated region because of the stress distribution.The fatigue lives of cracked specimens with long cracks are significantly improved by the technique.Considerable residual compressive stress is also induced,and so it is suggested that the optimal impact angle to be applied to real bridges should be 70°.The stress at the weld root is distributed uniformly with the crack closed,and the optimal crack-closure depth is 4 mm.To evaluate the effect of different crack-closure depths in tests,it is recommended that a hot-spot stress method which is extrapolated by three reference points should be adopted.展开更多
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c...Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.展开更多
In the background of the construction of Sutong Yangtze River Bridge(short as Sutong Bridge),the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced.Some key construct...In the background of the construction of Sutong Yangtze River Bridge(short as Sutong Bridge),the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced.Some key construction techniques,such as outspreading cable on deck,installing cable at pylon,pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.展开更多
Long-span bridges are special structures that require advanced analysis techniques to examine their performance. This paper presents a procedure developed to model the Confederation Bridge using 3-D beam elements. The...Long-span bridges are special structures that require advanced analysis techniques to examine their performance. This paper presents a procedure developed to model the Confederation Bridge using 3-D beam elements. The model was validated using the data collected before the opening of the bridge to the public. The bridge was instrumented to conduct fullscale static and dynamic tests. The static tests were to measure the deflection of the bridge pier while the dynamic tests to measure the free vibrations of the pier due to a sudden release of the static load. Confederation Bridge is one of the longest reinforced concrete bridges in the world. It connects the province of Prince Edward Island and the province of New Brunswick in Canada. Due to its strategic location and vital role as a transportation link between these two provinces, it was designed using higher safety factors than those for typical highway bridges. After validating the present numerical model, a procedure was developed to evaluate the performance of similar bridges subjected to traffic and seismic loads. It is of interest to note that the foundation stiffness and the modulus of elasticity of the concrete have significant effects on the structural responses of the Confederation Bridge.展开更多
We fabricate different-sized Al/AlO_x/Al Josephson junctions by using a simple bridge-free technique, in which only single-layer E-beam resist polymethyl methacrylate(PMMA) is exposed at low accelerate voltage(belo...We fabricate different-sized Al/AlO_x/Al Josephson junctions by using a simple bridge-free technique, in which only single-layer E-beam resist polymethyl methacrylate(PMMA) is exposed at low accelerate voltage(below 30 kV) and the size of junction can be varied in a large range. Compared with the bridge technique, this fabrication process is very robust because it can avoid collapsing the bridge during fabrication. This makes the bridge-free technique more popular to meet different requirements for Josephson junction devices especially for superconducting quantum bits.展开更多
The construction of municipal roads and bridges is an important foundation for the smooth traveling and transportation.However,if there a reduction in the subgrade and pavement part,the safety and the comfort of the d...The construction of municipal roads and bridges is an important foundation for the smooth traveling and transportation.However,if there a reduction in the subgrade and pavement part,the safety and the comfort of the driver will be seriously affected,therefore,reasonable measures should be taken on time to tackle the related issues.The significance of subgrade and pavement construction in the subsidence section,the key points of the construction,and the appropriate control measures that are should be taken in the actual construction,was discussed in this paper.Further,this paper analyzes the availability of the subgrade and pavement construction technology for the municipal roads and bridges,to provide a reference for engineers.展开更多
In recent days, the multilevel inverter technology is widely applied to domestic and industrial applications for medium voltage conversion. But, the power quality issues of the multilevel inverter limit the usage of m...In recent days, the multilevel inverter technology is widely applied to domestic and industrial applications for medium voltage conversion. But, the power quality issues of the multilevel inverter limit the usage of much sensitive equipment like medical instruments. The lower distortion level of the output voltage and current can generate a quality sinusoidal output voltage in inverters and they can be used for many applications. The harmonics can cause major problems in equipments due to the nonlinear loads connected with the power system. So, it is necessary to minimize the losses to raise its overall efficiency. In this paper, a new topology of seven level asymmetrical cascaded H-bridge multilevel inverter with a Fuzzy logic controller had been implemented to reduce the Total Harmonic Distortion (THD) and to improve the overall performance of the inverter. The proposed model is well suited for use with a solar PV application. In this topology, only six IGBT switches are used with three different voltage ratings of PV modules (1:2:4). The lower number of semiconductor switches leads to minimizing overall di/dt ratings and voltage stress on each switches and switching losses. The gate pulses generated by Sinusoidal Pulse Width Modulation (SPWM) technique with a Fuzzy logic controller are also introduced. A buck-boost converter is used to maintain the constant PV voltage level integrated by an MPPT technique followed by Perturb and Observer algorithm is also implemented. The MPPT is used to harness the maximum power of solar radiations under its various climatic conditions. The new topology is evaluated by a Matlab/Simulink model and compared with a hardware model. The results proved that the THD achieved by this topology is 1.66% and realized that it meets the IEEE harmonic standards.展开更多
基金supported by Ministry of University and Research(MUR)through the Research Grant“PRIN 2020 No.2020EBLPLS”“Programma Operativo Nazionale(PON)2014-2020”.
文摘This work proposes a numerical investigation on the effects of damage on the structural response of Reinforced Concrete(RC)bridge structures commonly adopted in highway and railway networks.An effective three-dimensional FE-based numerical model is developed to analyze the bridge’s structural response under several damage scenarios,including the effects of moving vehicle loads.In particular,the longitudinal and transversal beams are modeled through solid finite elements,while horizontal slabs are made of shell elements.Damage phenomena are also incorporated in the numerical model according to a smeared approach consistent with Continuum Damage Mechanics(CDM).In such a context,the proposed method utilizes an advanced and efficient computational strategy for reproducing Vehicle-Bridge Interaction(VBI)effects based on a moving mesh technique consistent with the Arbitrary Lagrangian-Eulerian(ALE)formulation.The proposed model adopts a moving mesh interface for tracing the positions of the contact points between the vehicle’s wheels and the bridge slabs.Such modeling strategy avoids using extremely refined discretization for structural members,thus drastically reducing computational efforts.Vibrational analyses in terms of damage scenarios are presented to verify how the presence of damage affects the natural frequencies of the structural system.In addition,a comprehensive investigation regarding the response of the bridge under moving vehicles is developed,also providing results in terms of Dynamic Amplification Factor(DAFs)for typical design bridge variables.
文摘The laser-cladding technique for welding of bridge wires is reported for the first time.The essen- tial feature of this technique different from the cur- rent methods is the realization of mutual melting of workpieces.Thus the stability of products is im- proved in an order of magnitude.The main points of the technique and the microanalyses of the weld- ing spot and other features are given.The technique presented is a novel method of welding between tiny piece and workpiece of different sizes and proper- ties.
文摘Ilio-inguinal lymph node dissection(IILD) is a commonly performed surgical procedure for a number of malignant conditions involving mainly the male and female genitalia, and the skin; however the postoperative morbidity of IILD, due to high frequency of flap necrosis, wound infection and seroma formation, has always been a major concern for the surgeons. The aim of the study is to highlight a modified skin bridge technique of IILD using two parallel curvilinear incisions to minimize postoperative skin flap necrosis. This technique was successfully employed in 38 IILD during May 2012 to November 2013. None of the patient had flap necrosis. Two patients developed seroma while another two patients had superficial surgical site infection; they were managed conservatively. Modified skin bridge technique for IILD is an effective method to minimize flap necrosis without compromising the oncological safety.
文摘Based on Edong Yangtze River Bridge, which is the second longest hybrid girder cable stayed bridge with 926 m long main span, the influencing factors and crucial techniques of the main span closure method for long span hybrid girder cable stayed bridge are studied. After theoretical analysis, numerical evaluation and practical test, the loading assistant closure method is employed in Edong Yangtze River Bridge. The loading assistant closure method, with better thermal adaptability and less influence on bridge line and the forced status, can meet the requirements of the unstressed state control method. Based on the mentioned advantages, the loading assistant closure method is applicable to long span hybrid girder cable stayed bridges. The conclusion can provide a reference for the further design of the similar brid^es.
基金Projects(51478163,51678216)supported by the National Natural Science Foundation of ChinaProject(2017Y09)supported by the Transport Science Research Project of Jiangsu Province,China
文摘To evaluate the effect of treating long cracks with the impact crack-closure retrofit(ICR)technique,three rib-to-deck welded specimens with a crack length of about 100 mm were tested.The metallographic structure,crack section,crack propagation life,and stress variation were analyzed.Finite-element models were also developed,and some optimal values of certain parameters are suggested according to the simulated results.The results show that new crack sources are generated on both sides of the ICR-treated region because of the stress distribution.The fatigue lives of cracked specimens with long cracks are significantly improved by the technique.Considerable residual compressive stress is also induced,and so it is suggested that the optimal impact angle to be applied to real bridges should be 70°.The stress at the weld root is distributed uniformly with the crack closed,and the optimal crack-closure depth is 4 mm.To evaluate the effect of different crack-closure depths in tests,it is recommended that a hot-spot stress method which is extrapolated by three reference points should be adopted.
基金National Science and Technology Support Program of China ( No. 2009BAG15B02)
文摘Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.
基金National Science and Technology Support Program of China(No.2006BAG04B02)
文摘In the background of the construction of Sutong Yangtze River Bridge(short as Sutong Bridge),the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced.Some key construction techniques,such as outspreading cable on deck,installing cable at pylon,pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.
文摘Long-span bridges are special structures that require advanced analysis techniques to examine their performance. This paper presents a procedure developed to model the Confederation Bridge using 3-D beam elements. The model was validated using the data collected before the opening of the bridge to the public. The bridge was instrumented to conduct fullscale static and dynamic tests. The static tests were to measure the deflection of the bridge pier while the dynamic tests to measure the free vibrations of the pier due to a sudden release of the static load. Confederation Bridge is one of the longest reinforced concrete bridges in the world. It connects the province of Prince Edward Island and the province of New Brunswick in Canada. Due to its strategic location and vital role as a transportation link between these two provinces, it was designed using higher safety factors than those for typical highway bridges. After validating the present numerical model, a procedure was developed to evaluate the performance of similar bridges subjected to traffic and seismic loads. It is of interest to note that the foundation stiffness and the modulus of elasticity of the concrete have significant effects on the structural responses of the Confederation Bridge.
基金Project supported by the National Key Research and Development Program of China(Grant No.2016YFA0301802)the National Natural Science Foundation of China(Grant Nos.11474152,91321310,11274156,11504165,and 61521001)
文摘We fabricate different-sized Al/AlO_x/Al Josephson junctions by using a simple bridge-free technique, in which only single-layer E-beam resist polymethyl methacrylate(PMMA) is exposed at low accelerate voltage(below 30 kV) and the size of junction can be varied in a large range. Compared with the bridge technique, this fabrication process is very robust because it can avoid collapsing the bridge during fabrication. This makes the bridge-free technique more popular to meet different requirements for Josephson junction devices especially for superconducting quantum bits.
文摘The construction of municipal roads and bridges is an important foundation for the smooth traveling and transportation.However,if there a reduction in the subgrade and pavement part,the safety and the comfort of the driver will be seriously affected,therefore,reasonable measures should be taken on time to tackle the related issues.The significance of subgrade and pavement construction in the subsidence section,the key points of the construction,and the appropriate control measures that are should be taken in the actual construction,was discussed in this paper.Further,this paper analyzes the availability of the subgrade and pavement construction technology for the municipal roads and bridges,to provide a reference for engineers.
文摘In recent days, the multilevel inverter technology is widely applied to domestic and industrial applications for medium voltage conversion. But, the power quality issues of the multilevel inverter limit the usage of much sensitive equipment like medical instruments. The lower distortion level of the output voltage and current can generate a quality sinusoidal output voltage in inverters and they can be used for many applications. The harmonics can cause major problems in equipments due to the nonlinear loads connected with the power system. So, it is necessary to minimize the losses to raise its overall efficiency. In this paper, a new topology of seven level asymmetrical cascaded H-bridge multilevel inverter with a Fuzzy logic controller had been implemented to reduce the Total Harmonic Distortion (THD) and to improve the overall performance of the inverter. The proposed model is well suited for use with a solar PV application. In this topology, only six IGBT switches are used with three different voltage ratings of PV modules (1:2:4). The lower number of semiconductor switches leads to minimizing overall di/dt ratings and voltage stress on each switches and switching losses. The gate pulses generated by Sinusoidal Pulse Width Modulation (SPWM) technique with a Fuzzy logic controller are also introduced. A buck-boost converter is used to maintain the constant PV voltage level integrated by an MPPT technique followed by Perturb and Observer algorithm is also implemented. The MPPT is used to harness the maximum power of solar radiations under its various climatic conditions. The new topology is evaluated by a Matlab/Simulink model and compared with a hardware model. The results proved that the THD achieved by this topology is 1.66% and realized that it meets the IEEE harmonic standards.