By computing and classifying the data of gully offset obtained from field surveys along the Tianjingshan fault zone and estimating the ages of three types of gullies,the strike-slip rates along the fault zone are disc...By computing and classifying the data of gully offset obtained from field surveys along the Tianjingshan fault zone and estimating the ages of three types of gullies,the strike-slip rates along the fault zone are discussed in different time intervals and fault segments.The results suggest that the intensity of activity along the fault zone is not strong,but the differences between different time intervals and fault segments since the late Pleistocene have been obvious.The average rates range from 0.23 mm/a to 1.62 mm/a.The largest average rate is 1.40 mm/a,which occurred in the early and middle of late Pleistocene along the western segment of the fault zone.Since the late stage of the late Pleistocene,the center of faulting activity of the fault zone has shifted to the middle segment,and the average slip rates range have changed from 1.30 mm/a to 1.63 mm/a.展开更多
Segmental perforation is widely used for horizontal wells. However,the flow of fluid in porous media is a complex problem. Using the Fourier transform,principle of potential superposition,trigonometric function transf...Segmental perforation is widely used for horizontal wells. However,the flow of fluid in porous media is a complex problem. Using the Fourier transform,principle of potential superposition,trigonometric function transform,asymptotic analyses,a pressure solution of a pseudo steady-state flow model in 3D circular-boxed media has been established. Comparing with the productivity of vertical wells,an equivalence radius model can be obtained. Based on the model,a method of evaluating the productivity of segmental perforation horizontal well is presented by means of principle of superposition. It shows that the equivalence radius is different for various positions of horizontal wells; the output of both ends of horizontal wells is greater than the others under the same length of perforation interval; it is more important to obtain high productivity by increasing the length of perforation interval than enlarging the spacing between perforation intervals. The result of this research can be used to ascertain the yield of each perforated interval.展开更多
This paper analyzes the gas source of the horizontally sectioned fully mechanized caving face in the steeply inclined and extra-thick seam of Adaohai Coal Mine, and numerically simulates the stress distribution and pr...This paper analyzes the gas source of the horizontally sectioned fully mechanized caving face in the steeply inclined and extra-thick seam of Adaohai Coal Mine, and numerically simulates the stress distribution and pressure relief of the lower section coal after the upper section working face is mined. It theoretically analyzed the reasonable layout of the drainage boreholes, and designed the drainage borehole layout accordingly. In the upper and lower section of the working face, the actual drainage effect of the boreholes was inspected, and the air exhaust gas volume in the working face was statistically analyzed. It was confirmed that the layout of boreholes was reasonable, the gas control effect of working face was greatly improved and fully met the needs of safe mining. The control effect was greatly improved and the need for safe mining was fully met, and thus a gas drainage technology suitable for the coal seam storage conditions and mining technology of the Adaohai Coal Mine was found. That is to say: the gas emission from the working face of the section mining mainly comes from its lower coal body. Pre-draining the lower coal body of the section and depressurizing gas interception and drainage are the key to effectively solve the problem of gas emission from the working face. Drainage boreholes in the working face of the section should be arranged at high and low positions. The high-level boreholes are located about 2 m from the top of the working face, and the high-level boreholes are about 9 m away from the top of the working face. Through the pre drainage of high and low-level boreholes in advance and the interception and pressure relief drainage, the gas control in the horizontal sublevel fully mechanized caving mining face in steep and extra thick coal seam can realize a virtuous cycle.展开更多
基金This project was sponsored by the State Seismological Bureau (85-02-3-3), China
文摘By computing and classifying the data of gully offset obtained from field surveys along the Tianjingshan fault zone and estimating the ages of three types of gullies,the strike-slip rates along the fault zone are discussed in different time intervals and fault segments.The results suggest that the intensity of activity along the fault zone is not strong,but the differences between different time intervals and fault segments since the late Pleistocene have been obvious.The average rates range from 0.23 mm/a to 1.62 mm/a.The largest average rate is 1.40 mm/a,which occurred in the early and middle of late Pleistocene along the western segment of the fault zone.Since the late stage of the late Pleistocene,the center of faulting activity of the fault zone has shifted to the middle segment,and the average slip rates range have changed from 1.30 mm/a to 1.63 mm/a.
基金supported by the China National 973 Program (Grant No. 2003CB214602)
文摘Segmental perforation is widely used for horizontal wells. However,the flow of fluid in porous media is a complex problem. Using the Fourier transform,principle of potential superposition,trigonometric function transform,asymptotic analyses,a pressure solution of a pseudo steady-state flow model in 3D circular-boxed media has been established. Comparing with the productivity of vertical wells,an equivalence radius model can be obtained. Based on the model,a method of evaluating the productivity of segmental perforation horizontal well is presented by means of principle of superposition. It shows that the equivalence radius is different for various positions of horizontal wells; the output of both ends of horizontal wells is greater than the others under the same length of perforation interval; it is more important to obtain high productivity by increasing the length of perforation interval than enlarging the spacing between perforation intervals. The result of this research can be used to ascertain the yield of each perforated interval.
文摘This paper analyzes the gas source of the horizontally sectioned fully mechanized caving face in the steeply inclined and extra-thick seam of Adaohai Coal Mine, and numerically simulates the stress distribution and pressure relief of the lower section coal after the upper section working face is mined. It theoretically analyzed the reasonable layout of the drainage boreholes, and designed the drainage borehole layout accordingly. In the upper and lower section of the working face, the actual drainage effect of the boreholes was inspected, and the air exhaust gas volume in the working face was statistically analyzed. It was confirmed that the layout of boreholes was reasonable, the gas control effect of working face was greatly improved and fully met the needs of safe mining. The control effect was greatly improved and the need for safe mining was fully met, and thus a gas drainage technology suitable for the coal seam storage conditions and mining technology of the Adaohai Coal Mine was found. That is to say: the gas emission from the working face of the section mining mainly comes from its lower coal body. Pre-draining the lower coal body of the section and depressurizing gas interception and drainage are the key to effectively solve the problem of gas emission from the working face. Drainage boreholes in the working face of the section should be arranged at high and low positions. The high-level boreholes are located about 2 m from the top of the working face, and the high-level boreholes are about 9 m away from the top of the working face. Through the pre drainage of high and low-level boreholes in advance and the interception and pressure relief drainage, the gas control in the horizontal sublevel fully mechanized caving mining face in steep and extra thick coal seam can realize a virtuous cycle.