Exergy Analysis and Thermal Optimization of a Double-Turbine Regeneration System in a Ultra-Supercritical Double-Reheat Unit 被引量:2
1
作者 Shidan Chi Tao Luan +2 位作者 Yan Liang Xundong Hu Yan Gao 《Fluid Dynamics & Materials Processing》 EI 2021年第1期71-80,共10页
Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat ... Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat degree ofextraction steam in an ultra-supercritical (USC) double-reheat unit is considered. Using a 1000 MW power plantas an example, two systems (case 1 and case 2) are proposed, both working in combination with a regenerativesteam turbine. The thermal performances of these two systems are compared with that of the original systemthrough a heat balance method and an exergy balance strategy. The results reveal that the two coupled systemscan significantly reduce the superheat degree of extraction steam, turbine heat rate, and coal consumption of theunit and improve the energy utilization efficiency. These results will provide useful theoretical guidance to futureinvestigators wishing to address the general problem relating to energy conservation and modelling of the coupledextraction steam regenerative system of USC double-reheat units. 展开更多
关键词 ultra-supercritical unit exergy loss thermal performance regenerative steam turbine superheat degree
下载PDF
Multi-model Predictive Control of Ultra-supercritical Coal-fired Power Unit 被引量:6
2
作者 王国良 阎威武 +2 位作者 陈世和 张曦 邵惠鹤 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2014年第7期782-787,共6页
The control of ultra-supercritical(USC) power unit is a difficult issue for its characteristic of the nonlinearity, large dead time and coupling of the unit. In this paper, model predictive control(MPC) based on multi... The control of ultra-supercritical(USC) power unit is a difficult issue for its characteristic of the nonlinearity, large dead time and coupling of the unit. In this paper, model predictive control(MPC) based on multi-model and double layered optimization is introduced for coordinated control of USC unit. The linear programming(LP) combined with quadratic programming(QP) is used in steady optimization for computation of the ideal value of dynamic optimization. Three inputs(i.e. valve opening, coal flow and feedwater flow) are employed to control three outputs(i.e. load, main steam temperature and main steam pressure). The step response models for the dynamic matrix control(DMC) are constructed using the three inputs and the three outputs. Piecewise models are built at selected operation points. Double-layered multi-model predictive controller is implemented in simulation with satisfactory performance. 展开更多
关键词 ultra-supercritical power unit Coordinated control Multi-model constrained predictive control
下载PDF
Vibration of 1000-MW Ultra-Supercritical Turbine-Generator Unit with Simens Technology
3
作者 Zhang Xueyan Zhang Weijun Ge Xiang He Guoan 《Electricity》 2012年第5期48-54,58,共8页
The layout features of unit shafting and their effects on vibration, as well as evaluation criteria, were introduced for a 1000-MW ultra-supercritical turbine-generator unit with Simens technology. Based on vibration ... The layout features of unit shafting and their effects on vibration, as well as evaluation criteria, were introduced for a 1000-MW ultra-supercritical turbine-generator unit with Simens technology. Based on vibration diagnosis and treatment for more than 10 units, some typical vibration faults were summarized, such as the vibration fluctuation of the high pressure (HP) rotor, abnormal vibration increases of the No.3 bearing pedestal and large vibration of the exciter rotor during its critical speed range. The vibration characteristics and the causes of faults and countermeasures were analyzed. Three applications for further illustration were given. The vibration fault identification method, control measures, and applications can provide a reference for vibration diagnoses and treatment of same type units. 展开更多
关键词 1 000-MW ultra-supercritical unit VIBRATION single bearing support rotor (thermal) unbalance rotor dynamic (thermal) balance
下载PDF
Energy-Saving Optimization Study on 700℃ Double Reheat Advanced Ultra-Supercritical Coal-Fired Power Generation System
4
作者 WANG Jing DUAN Liqiang +3 位作者 YANG Jinfu YANG Ming JING Yutian TIAN Liguo 《Journal of Thermal Science》 SCIE EI CAS CSCD 2023年第1期30-43,共14页
700°C double reheat advanced ultra-supercritical power generation technology is one of the most important development directions for the efficient and clean utilization of coal.To solve the great exergy loss prob... 700°C double reheat advanced ultra-supercritical power generation technology is one of the most important development directions for the efficient and clean utilization of coal.To solve the great exergy loss problem caused by the high superheat degrees of regenerative steam extractions in 700°C double reheat advanced ultra-supercritical power generation system,two optimization systems are proposed in this paper.System 1 is integrated with the back pressure extraction steam turbine,and system 2 is simultaneously integrated with both the outside steam cooler and back pressure extraction steam turbine.The system performance models are built by the Ebsilon Professional software.The performances of optimized systems are analyzed by the unit consumption method.The off-design performances of optimization systems are analyzed.The results show that:the standard power generation coal consumption rates of optimization systems 1 and 2 are decreased by 1.88 g·(kW·h)^(–1),2.97 g·(kW·h)^(–1)compared with that of the 700°C reference system;the average superheat degrees of regenerative steam extractions of optimized systems 1 and 2 are decreased by 122.2°C,140.7°C(100%turbine heat acceptance condition),respectively.The comparison results also show that the performance of the optimized system 2 is better than those of the optimized system 1 and the 700°C reference system.The power generation standard coal consumption rate and the power generation efficiency of the optimized system 2 are about 232.08 g·(kW·h)^(–1)and 52.96%(100%turbine heat acceptance condition),respectively. 展开更多
关键词 700℃ advanced ultra-supercritical(A-USC) double reheat cycle extraction steam superheat degree unit consumption method system optimization