Frequency deviation can be used as an indicator of imbalance between supply and demand. When generation is insufficient, it can cause frequency decline in a power system operation. Implementing under frequency load sh...Frequency deviation can be used as an indicator of imbalance between supply and demand. When generation is insufficient, it can cause frequency decline in a power system operation. Implementing under frequency load shedding (UFLS) is one of the common methods to overcome this problem. This paper proposes a novel approach for adaptive load shedding. The concept is an extension of shared and targeted load shedding using reserve margin. The optimal system configuration is then selected from those candidates to fulfill operational objectives. Operational constraints related to system parameters, threshold frequency, total of load shed and control area including line capacity are considered. An example using four sub-areas connected to an external system shows that the proposed regional coordination as an adaptive UFLS is feasible.展开更多
为解决互联水电系统负荷频率控制(load frequencycontrol,LFC)问题,及保持互联电网系统频率、联络线功率及区域控制误差(area control error,ACE)的稳定,根据闭环系统谐振峰值与系统响应最大峰值之间的关系,构建一个与系统参数及控...为解决互联水电系统负荷频率控制(load frequencycontrol,LFC)问题,及保持互联电网系统频率、联络线功率及区域控制误差(area control error,ACE)的稳定,根据闭环系统谐振峰值与系统响应最大峰值之间的关系,构建一个与系统参数及控制器参数都相关的优化问题,通过该问题的求解获得控制器参数与系统参数之间的数学关系,针对水轮发电系统非最小相位特性,通过串加比例–微分(proportional-derivative,PD)控制方式降低系统阶次,设计尼科尔斯(Nichols)曲线的比例–积分–微分(proportional-integral-derivative,PID)控制器。基于模型参数扰动和负荷干扰的仿真结果表明:尼科尔斯PID控制器能快速调整系统频率偏差、联络线功率偏差及ACE为0,具有良好的鲁棒性能和抗负荷干扰性能,系统过渡过程性能明显优于传统PID调节器结果。展开更多
Severe disturbances in a power network can cause the system frequency to exceed the safe operating range.As the last defensive line for system emergency control,under frequency load shedding(UFLS)is an important metho...Severe disturbances in a power network can cause the system frequency to exceed the safe operating range.As the last defensive line for system emergency control,under frequency load shedding(UFLS)is an important method for preventing a wide range of frequency excursions.This paper proposes a hierarchical UFLS scheme of“centralized real-time decision-making and decentralized real-time control”for inter-connected systems.The centralized decision-layer of the scheme takes into account the importance of the load based on the equivalent transformation of kinetic energy(KE)and potential energy(PE)in the transient energy function(TEF),while the load PE is used to determine the load shedding amount(LSA)allocation in different loads after faults in real-time.At the same time,the influence of inertia loss is considered in the calculation of unbalanced power,and the decentralized control center is used to implement the one-stage UFLS process to compensate for the unbalanced power.Simulations are carried out on the modified New England 10-generator 39-bus system and 197-bus system in China to verify the performance of the proposed scheme.The results show that,compared with other LSA allocation indicators,the proposed alloca-tion indicators can achieve better fnadir and td.At the same time,compared with other multi-stage UFLS schemes,the proposed scheme can obtain the maximum fnadir with a smaller LSA in scenarios with high renewable energy sources(RES)penetration.展开更多
In order to analyze the effect of different loading frequencies on the fatigue performance for asphalt mixture,the changing law of asphalt mixture strengths with loading speed was revealed by strength tests under diff...In order to analyze the effect of different loading frequencies on the fatigue performance for asphalt mixture,the changing law of asphalt mixture strengths with loading speed was revealed by strength tests under different loading speeds.Fatigue equations of asphalt mixtures based on the nominal stress ratio and real stress ratio were established using fatigue tests under different loading frequencies.It was revealed that the strength of the asphalt mixture is affected by the loading speed greatly.It was also discovered that the fatigue equation based on the nominal stress ratio will change with the change of the fatigue loading speed.There is no uniqueness.But the fatigue equation based on the real stress ratio doesn't change with the loading frequency.It has the uniqueness.The results indicate the fatigue equation based on the real stress ratio can realize the normalization of the asphalt mixture fatigue equation under different loading frequencies.It can greatly benefit the analysis of the fatigue characteristics under different vehicle speeds for asphalt pavement.展开更多
This paper addresses a terminal sliding mode control(T-SMC) method for load frequency control(LFC) in renewable power systems with generation rate constraints(GRC).A two-area interconnected power system with wind turb...This paper addresses a terminal sliding mode control(T-SMC) method for load frequency control(LFC) in renewable power systems with generation rate constraints(GRC).A two-area interconnected power system with wind turbines is taken into account for simulation studies. The terminal sliding mode controllers are assigned in each area to achieve the LFC goal. The increasing complexity of the nonlinear power system aggravates the effects of system uncertainties. Radial basis function neural networks(RBF NNs) are designed to approximate the entire uncertainties. The terminal sliding mode controllers and the RBF NNs work in parallel to solve the LFC problem for the renewable power system. Some simulation results illustrate the feasibility and validity of the presented scheme.展开更多
风电的大规模并网导致系统等效惯量下降、不确定性增加,给电力系统的负荷频率控制(loadfrequency control,LFC)带来新的挑战。考虑到柔性直流输电系统(voltage source converter based high voltage DC,VSC-HVDC)具有的潜在调频能力,对...风电的大规模并网导致系统等效惯量下降、不确定性增加,给电力系统的负荷频率控制(loadfrequency control,LFC)带来新的挑战。考虑到柔性直流输电系统(voltage source converter based high voltage DC,VSC-HVDC)具有的潜在调频能力,对此展开研究,针对风电场经VSC-HVDC并网的情形提出了一种虚拟同步发电机(virtual synchronous generator,VSG)变参数负荷频率控制策略。首先,在风电场经VSC-HVDC并网的LFC模型及拓扑结构分析基础上,为了提高VSC-HVDC的可控性,对换流器的控制环节进行了VSG控制方法的设计;然后,对VSG控制参数与频率变化的关联性进行分析,并基于分数阶梯度下降法(fractional-order gradient descent method,FOGDM),利用频率的分数阶导数提取频率深层变化特征,以优化VSG控制参数;在此基础上,考虑到系统的不确定性,设计触发机制对VSG变参数优化模式进行调整,以降低VSG参数的变换频次,提高系统频率控制的针对性。仿真结果表明:所提控制方法能有效改善电网负荷频率控制效果,具有良好的适应性。展开更多
Under-frequency load shedding (UFLS) is used in the power industry to rescue systems facing extreme disturbances to avoid system collapse. Traditionally, many computations are repeated to seek the proper power syste...Under-frequency load shedding (UFLS) is used in the power industry to rescue systems facing extreme disturbances to avoid system collapse. Traditionally, many computations are repeated to seek the proper power system settings such that the UFLS provides the desired good performance for selected scenarios. An adaptive UFLS method based on the genetic algorithm was developed to automate the finding of optimal parameters to minimize the repetitive trial-error calculations. Simulations demonstrate that the method has better performance than previous schemes and reduces the time and effort of the repetitive simulations.展开更多
文摘Frequency deviation can be used as an indicator of imbalance between supply and demand. When generation is insufficient, it can cause frequency decline in a power system operation. Implementing under frequency load shedding (UFLS) is one of the common methods to overcome this problem. This paper proposes a novel approach for adaptive load shedding. The concept is an extension of shared and targeted load shedding using reserve margin. The optimal system configuration is then selected from those candidates to fulfill operational objectives. Operational constraints related to system parameters, threshold frequency, total of load shed and control area including line capacity are considered. An example using four sub-areas connected to an external system shows that the proposed regional coordination as an adaptive UFLS is feasible.
基金supported by National Natural Science Foundation of China(61533013,61273144)Scientific Technology Research and Development Plan Project of Tangshan(13130298B)Scientific Technology Research and Development Plan Project of Hebei(z2014070)
文摘为解决互联水电系统负荷频率控制(load frequencycontrol,LFC)问题,及保持互联电网系统频率、联络线功率及区域控制误差(area control error,ACE)的稳定,根据闭环系统谐振峰值与系统响应最大峰值之间的关系,构建一个与系统参数及控制器参数都相关的优化问题,通过该问题的求解获得控制器参数与系统参数之间的数学关系,针对水轮发电系统非最小相位特性,通过串加比例–微分(proportional-derivative,PD)控制方式降低系统阶次,设计尼科尔斯(Nichols)曲线的比例–积分–微分(proportional-integral-derivative,PID)控制器。基于模型参数扰动和负荷干扰的仿真结果表明:尼科尔斯PID控制器能快速调整系统频率偏差、联络线功率偏差及ACE为0,具有良好的鲁棒性能和抗负荷干扰性能,系统过渡过程性能明显优于传统PID调节器结果。
基金supported in part by the National Key R&D Program of China“Response-driven intelligent enhanced analysis and control for bulk power system stability”under Grant 2021YFB2400800.
文摘Severe disturbances in a power network can cause the system frequency to exceed the safe operating range.As the last defensive line for system emergency control,under frequency load shedding(UFLS)is an important method for preventing a wide range of frequency excursions.This paper proposes a hierarchical UFLS scheme of“centralized real-time decision-making and decentralized real-time control”for inter-connected systems.The centralized decision-layer of the scheme takes into account the importance of the load based on the equivalent transformation of kinetic energy(KE)and potential energy(PE)in the transient energy function(TEF),while the load PE is used to determine the load shedding amount(LSA)allocation in different loads after faults in real-time.At the same time,the influence of inertia loss is considered in the calculation of unbalanced power,and the decentralized control center is used to implement the one-stage UFLS process to compensate for the unbalanced power.Simulations are carried out on the modified New England 10-generator 39-bus system and 197-bus system in China to verify the performance of the proposed scheme.The results show that,compared with other LSA allocation indicators,the proposed alloca-tion indicators can achieve better fnadir and td.At the same time,compared with other multi-stage UFLS schemes,the proposed scheme can obtain the maximum fnadir with a smaller LSA in scenarios with high renewable energy sources(RES)penetration.
基金Projects(51208066,51038002)supported by the National Natural Science Foundation of ChinaProject(20114316120001)supported by Specialized Research Fund for the Doctoral Program of Higher Education,China+5 种基金Project(2012-319-825-150)supported by Application and Basic Research Projects of Ministry of Transport ChinaProject(2013K28)supported by Transportation Science and Technology Plan Projects of Henan Province,ChinaProject(201102)supported by Transportation Science and Technology Plan Projects of Hunan Province,ChinaProject(YB2012B031)supported by Funding Projects of Hunan Provincial Outstanding Doctorate Dissertation,ChinaProject(2014gxjgclkf-002)supported by Open Fund of Key Laboratory of Road Structure and Material of Guangxi Province ChinaProject(kfj120101)supported by Open Fund of the Key Laboratory of Highway Engineering(Changsha University of Science and Technology),China
文摘In order to analyze the effect of different loading frequencies on the fatigue performance for asphalt mixture,the changing law of asphalt mixture strengths with loading speed was revealed by strength tests under different loading speeds.Fatigue equations of asphalt mixtures based on the nominal stress ratio and real stress ratio were established using fatigue tests under different loading frequencies.It was revealed that the strength of the asphalt mixture is affected by the loading speed greatly.It was also discovered that the fatigue equation based on the nominal stress ratio will change with the change of the fatigue loading speed.There is no uniqueness.But the fatigue equation based on the real stress ratio doesn't change with the loading frequency.It has the uniqueness.The results indicate the fatigue equation based on the real stress ratio can realize the normalization of the asphalt mixture fatigue equation under different loading frequencies.It can greatly benefit the analysis of the fatigue characteristics under different vehicle speeds for asphalt pavement.
基金supported by National Natural Science Foundation of China(60904008,61273336)the Fundamental Research Funds for the Central Universities(2018MS025)the National Basic Research Program of China(973 Program)(B1320133020)
文摘This paper addresses a terminal sliding mode control(T-SMC) method for load frequency control(LFC) in renewable power systems with generation rate constraints(GRC).A two-area interconnected power system with wind turbines is taken into account for simulation studies. The terminal sliding mode controllers are assigned in each area to achieve the LFC goal. The increasing complexity of the nonlinear power system aggravates the effects of system uncertainties. Radial basis function neural networks(RBF NNs) are designed to approximate the entire uncertainties. The terminal sliding mode controllers and the RBF NNs work in parallel to solve the LFC problem for the renewable power system. Some simulation results illustrate the feasibility and validity of the presented scheme.
文摘风电的大规模并网导致系统等效惯量下降、不确定性增加,给电力系统的负荷频率控制(loadfrequency control,LFC)带来新的挑战。考虑到柔性直流输电系统(voltage source converter based high voltage DC,VSC-HVDC)具有的潜在调频能力,对此展开研究,针对风电场经VSC-HVDC并网的情形提出了一种虚拟同步发电机(virtual synchronous generator,VSG)变参数负荷频率控制策略。首先,在风电场经VSC-HVDC并网的LFC模型及拓扑结构分析基础上,为了提高VSC-HVDC的可控性,对换流器的控制环节进行了VSG控制方法的设计;然后,对VSG控制参数与频率变化的关联性进行分析,并基于分数阶梯度下降法(fractional-order gradient descent method,FOGDM),利用频率的分数阶导数提取频率深层变化特征,以优化VSG控制参数;在此基础上,考虑到系统的不确定性,设计触发机制对VSG变参数优化模式进行调整,以降低VSG参数的变换频次,提高系统频率控制的针对性。仿真结果表明:所提控制方法能有效改善电网负荷频率控制效果,具有良好的适应性。
文摘Under-frequency load shedding (UFLS) is used in the power industry to rescue systems facing extreme disturbances to avoid system collapse. Traditionally, many computations are repeated to seek the proper power system settings such that the UFLS provides the desired good performance for selected scenarios. An adaptive UFLS method based on the genetic algorithm was developed to automate the finding of optimal parameters to minimize the repetitive trial-error calculations. Simulations demonstrate that the method has better performance than previous schemes and reduces the time and effort of the repetitive simulations.