The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the ...The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics.展开更多
In-situ conversion processing (ICP) of shale oil underground at the depth ranging from 300 m to 3 000 m is a physical and chemical process caused by using horizontal drilling and electric heating technology, which con...In-situ conversion processing (ICP) of shale oil underground at the depth ranging from 300 m to 3 000 m is a physical and chemical process caused by using horizontal drilling and electric heating technology, which converts heavy oil, bitumen and various organic matter into light oil and gas in a large scale, which can be called"underground refinery". ICP has several advantages as in CO2capture, recoverable resource potential and the quality of hydrocarbon output. Based on the geothermal evolution mechanism of organic materials established by Tissot et al., this study reveals that in the nonmarine organic-rich shale sequence, the amount of liquid hydrocarbon maintaining in the shale is as high as 25%in the liquid hydrocarbon window stage (R o less than 1.0%), and the unconverted organic materials (low mature-immature organic materials) in the shale interval can reach 40%to 100%. The conditions of organic-rich shale suitable for underground in-situ conversion of shale oil should be satisfied in the following aspects, TOC higher than 6%, R o ranging between 0.5%and 1%, concentrated thickness of organic-rich shale greater than 15 meters, burial depth less than 3 000 m, covering area bigger than 50 km2, good sealing condition in both up-and down-contacting sequences and water content smaller than 5%, etc. The shale oil resource in China’s onshore region is huge. It is estimated with this paper that the technical recoverable resource reaches 70-90 billion tons of oil and 60-65 trillion cubic meters of gas. The ICP of shale oil underground is believed to be a fairway to find big oil in the source kitchen in the near future. And it is also believed to be a milestone to keep China long-term stability of oil and gas sufficient supply by putting ICP of shale oil underground into real practice in the future.展开更多
To provide a more accurate evaluation of the scale of deep underground resources,a new pressure coring system was carefully developed and its strength and safety of the engineering were verified by theoretical analyse...To provide a more accurate evaluation of the scale of deep underground resources,a new pressure coring system was carefully developed and its strength and safety of the engineering were verified by theoretical analyses and numerical simulation.The designed pressure coring system can obtain cores with length of 3 m and diameter of 50 mm at 70 MPa.The results of the ball-drop operation experiment demonstrate that differential motion assembly can effectively cut a safety pin by applying a tensile force of 4852 N,and it can lift the core tube through the center pole to complete a series of mechanical actions to seal the pressure.Additionally,by maintaining pressures at 70 MPa for 30 min,the pressure sealing capacity of the system was proven.Furthermore,a core sample with a diameter of 50 mm was obtained through a core drilling experiment and the coring performance of the pressure coring system was verified.This study can not only enrich the existing onshore coring technology but also provide a theoretical guide and design criteria for the development of similar pressure coring systems to meet the demand for deeper underground exploration.展开更多
A study of reaction mechanisms and chemical kinetics of pressurized pyrolysis of Chinese Liushuhe oil shale in the presence of water were conducted using an autoclave for simulating and modeling in-situ underground th...A study of reaction mechanisms and chemical kinetics of pressurized pyrolysis of Chinese Liushuhe oil shale in the presence of water were conducted using an autoclave for simulating and modeling in-situ underground thermal degradation.It was found that the oil shale was first pyrolyzed to form pyrobitumen,shale oil,shale gas and residue,then the pyrobitumen was further pyrolyzed to form more shale oil,shale gas,and residue.It means that there are two consecutive and parallel reactions.With increasing temperature,the pyrobitumen yield,as intermediate,first reached a maximum,then decreased to approximately zero.The kinetics results show that both these reactions are first order.The activation energy of pyrobitumen formation from oil shale is lower than that of shale oil formation from pyrobitumen.展开更多
文摘The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics.
基金Supported by the International Cooperation Project of China National Petroleum Corporation(2015D-4810-02)China National Science and Technology Major Project(2016ZX05046)
文摘In-situ conversion processing (ICP) of shale oil underground at the depth ranging from 300 m to 3 000 m is a physical and chemical process caused by using horizontal drilling and electric heating technology, which converts heavy oil, bitumen and various organic matter into light oil and gas in a large scale, which can be called"underground refinery". ICP has several advantages as in CO2capture, recoverable resource potential and the quality of hydrocarbon output. Based on the geothermal evolution mechanism of organic materials established by Tissot et al., this study reveals that in the nonmarine organic-rich shale sequence, the amount of liquid hydrocarbon maintaining in the shale is as high as 25%in the liquid hydrocarbon window stage (R o less than 1.0%), and the unconverted organic materials (low mature-immature organic materials) in the shale interval can reach 40%to 100%. The conditions of organic-rich shale suitable for underground in-situ conversion of shale oil should be satisfied in the following aspects, TOC higher than 6%, R o ranging between 0.5%and 1%, concentrated thickness of organic-rich shale greater than 15 meters, burial depth less than 3 000 m, covering area bigger than 50 km2, good sealing condition in both up-and down-contacting sequences and water content smaller than 5%, etc. The shale oil resource in China’s onshore region is huge. It is estimated with this paper that the technical recoverable resource reaches 70-90 billion tons of oil and 60-65 trillion cubic meters of gas. The ICP of shale oil underground is believed to be a fairway to find big oil in the source kitchen in the near future. And it is also believed to be a milestone to keep China long-term stability of oil and gas sufficient supply by putting ICP of shale oil underground into real practice in the future.
基金the Shenzhen National Science Fund for Distinguished Young Scholars(No.RCJC20210706091948015)National Science Fund for Distinguished Young Scholars(No.52225403)the National Natural Science Foundation of China(No.51827901).
文摘To provide a more accurate evaluation of the scale of deep underground resources,a new pressure coring system was carefully developed and its strength and safety of the engineering were verified by theoretical analyses and numerical simulation.The designed pressure coring system can obtain cores with length of 3 m and diameter of 50 mm at 70 MPa.The results of the ball-drop operation experiment demonstrate that differential motion assembly can effectively cut a safety pin by applying a tensile force of 4852 N,and it can lift the core tube through the center pole to complete a series of mechanical actions to seal the pressure.Additionally,by maintaining pressures at 70 MPa for 30 min,the pressure sealing capacity of the system was proven.Furthermore,a core sample with a diameter of 50 mm was obtained through a core drilling experiment and the coring performance of the pressure coring system was verified.This study can not only enrich the existing onshore coring technology but also provide a theoretical guide and design criteria for the development of similar pressure coring systems to meet the demand for deeper underground exploration.
基金financial support from the National Science and Technology Major Project of China(Grant No. 2008ZX05018)Taishan Scholar Constructive Engineering Foundation of Shandong province(No. ts20120518)
文摘A study of reaction mechanisms and chemical kinetics of pressurized pyrolysis of Chinese Liushuhe oil shale in the presence of water were conducted using an autoclave for simulating and modeling in-situ underground thermal degradation.It was found that the oil shale was first pyrolyzed to form pyrobitumen,shale oil,shale gas and residue,then the pyrobitumen was further pyrolyzed to form more shale oil,shale gas,and residue.It means that there are two consecutive and parallel reactions.With increasing temperature,the pyrobitumen yield,as intermediate,first reached a maximum,then decreased to approximately zero.The kinetics results show that both these reactions are first order.The activation energy of pyrobitumen formation from oil shale is lower than that of shale oil formation from pyrobitumen.