Summary This paper analyses the turbine bypass system design and operation mode for domestically made 300 MW unit with technology imported, and put forward some suggestions about whether bypass system is needed. 1.0 I...Summary This paper analyses the turbine bypass system design and operation mode for domestically made 300 MW unit with technology imported, and put forward some suggestions about whether bypass system is needed. 1.0 Introduction The domestically made WH Co, patent 300 MW unit is produced according to the technology of American Westinghouse (WH) Corporation. The original展开更多
Objective To describe the preoperative factors of prolonged intensive care unit length of stay after coronary artery bypass grafting. Methods From 1997 to 2009, 1318 patients underwent isolated CABG in our hospital. R...Objective To describe the preoperative factors of prolonged intensive care unit length of stay after coronary artery bypass grafting. Methods From 1997 to 2009, 1318 patients underwent isolated CABG in our hospital. Retrospective analysis was performed on these cases. Univariate and multivariate analyses展开更多
Objective The rate of post-operative complications has been increased with the changes in patients’age,prolonged duration,more severe and diffused lesions,and more patients with complications in recent years. We try ...Objective The rate of post-operative complications has been increased with the changes in patients’age,prolonged duration,more severe and diffused lesions,and more patients with complications in recent years. We try to identify the risk factors associated with prolonged stay in the intensive care unit (ICU) after coronary artery bypass graft surgery (CABG) . Methods 1623 patients who received CABG surgery in Beijing Anzhen Hospital展开更多
汽轮发电机组甩负荷试验目的为测取甩负荷后最高飞升转速变化曲线,通过对调节系统的动态特性分析考核汽机数字电液调节系统(digital electro-hydraulic control system,DEH)在甩负荷时的控制性能,通过对中国首台套超临界双抽背压式汽轮...汽轮发电机组甩负荷试验目的为测取甩负荷后最高飞升转速变化曲线,通过对调节系统的动态特性分析考核汽机数字电液调节系统(digital electro-hydraulic control system,DEH)在甩负荷时的控制性能,通过对中国首台套超临界双抽背压式汽轮机组甩100%负荷试验结果进行分析,提出了在甩100%负荷过程中关键的控制点,尤其是甩负荷过程中的旁路控制、燃料控制、主蒸汽压力控制、给水控制、转速控制等方面进行充分分析研究,并进行了100%甩负荷试验,最终实现了在甩全负荷工况下的供热,各参数均良好,对热网产生的波动很小,有效提高了事故工况下的保障供热能力。本机组甩负荷后,转速飞升最大值3113 r/min,动态超调量3.77%,实现了超临界再热型双抽背压机组100%甩负荷试验一次成功,也为超临界双抽背压机组供热稳定性提高了良好的技术支撑。展开更多
文摘Summary This paper analyses the turbine bypass system design and operation mode for domestically made 300 MW unit with technology imported, and put forward some suggestions about whether bypass system is needed. 1.0 Introduction The domestically made WH Co, patent 300 MW unit is produced according to the technology of American Westinghouse (WH) Corporation. The original
文摘Objective To describe the preoperative factors of prolonged intensive care unit length of stay after coronary artery bypass grafting. Methods From 1997 to 2009, 1318 patients underwent isolated CABG in our hospital. Retrospective analysis was performed on these cases. Univariate and multivariate analyses
文摘Objective The rate of post-operative complications has been increased with the changes in patients’age,prolonged duration,more severe and diffused lesions,and more patients with complications in recent years. We try to identify the risk factors associated with prolonged stay in the intensive care unit (ICU) after coronary artery bypass graft surgery (CABG) . Methods 1623 patients who received CABG surgery in Beijing Anzhen Hospital
文摘汽轮发电机组甩负荷试验目的为测取甩负荷后最高飞升转速变化曲线,通过对调节系统的动态特性分析考核汽机数字电液调节系统(digital electro-hydraulic control system,DEH)在甩负荷时的控制性能,通过对中国首台套超临界双抽背压式汽轮机组甩100%负荷试验结果进行分析,提出了在甩100%负荷过程中关键的控制点,尤其是甩负荷过程中的旁路控制、燃料控制、主蒸汽压力控制、给水控制、转速控制等方面进行充分分析研究,并进行了100%甩负荷试验,最终实现了在甩全负荷工况下的供热,各参数均良好,对热网产生的波动很小,有效提高了事故工况下的保障供热能力。本机组甩负荷后,转速飞升最大值3113 r/min,动态超调量3.77%,实现了超临界再热型双抽背压机组100%甩负荷试验一次成功,也为超临界双抽背压机组供热稳定性提高了良好的技术支撑。