We address the problem of optimally re-routing the feeders of urban distribution network in Milano,Italy,which presents some peculiarities and significant design challenges.Milano has two separate medium-voltage(MV)di...We address the problem of optimally re-routing the feeders of urban distribution network in Milano,Italy,which presents some peculiarities and significant design challenges.Milano has two separate medium-voltage(MV)distribution networks,previously operated by two different utilities,which grew up independently and incoordinately.This results in a system layout which is inefficient,redundant,and difficult to manage due to different operating procedures.The current utility UNARETI,which is in charge of the overall distribution system,aims at optimally integrating the two MV distribution networks and moving to a new specific layout that offers advantages from the perspectives of reliability and flexibility.We present a mixed-integer programming(MIP)approach for the design of a new network configuration satisfying the so-called 2-step ladder layout required by the planner.The model accounts for the main electrical constraints such as power flow equations,thermal limits of high-voltage(HV)/MV substation transformers,line thermal limits,and the maximum number of customers per feeder.Real power losses are taken into account via a quadratic formulation and a piecewise linear approximation.Computational tests on a small-scale system and on a part of the Milano distribution network are reported.展开更多
介绍了基于地理信息系统(geographic information system,GIS)的上海城市配电网规划计算机辅助决策系统的整体架构和功能设计,通过应用实例展示了系统各模块的功能和主要规划结果。该系统结合电力公司日常规划业务,充分利用现有资源,采...介绍了基于地理信息系统(geographic information system,GIS)的上海城市配电网规划计算机辅助决策系统的整体架构和功能设计,通过应用实例展示了系统各模块的功能和主要规划结果。该系统结合电力公司日常规划业务,充分利用现有资源,采用最新的计算机技术和配电网规划专业技术实现,优化了城市电网规划结果,同时可显著减轻规划人员的工作量。与传统规划软件相比,该系统具有较高的科学性和实用化水平,为最终实现配电网规划工作的信息化、日常化和精细化奠定了基础。展开更多
文摘We address the problem of optimally re-routing the feeders of urban distribution network in Milano,Italy,which presents some peculiarities and significant design challenges.Milano has two separate medium-voltage(MV)distribution networks,previously operated by two different utilities,which grew up independently and incoordinately.This results in a system layout which is inefficient,redundant,and difficult to manage due to different operating procedures.The current utility UNARETI,which is in charge of the overall distribution system,aims at optimally integrating the two MV distribution networks and moving to a new specific layout that offers advantages from the perspectives of reliability and flexibility.We present a mixed-integer programming(MIP)approach for the design of a new network configuration satisfying the so-called 2-step ladder layout required by the planner.The model accounts for the main electrical constraints such as power flow equations,thermal limits of high-voltage(HV)/MV substation transformers,line thermal limits,and the maximum number of customers per feeder.Real power losses are taken into account via a quadratic formulation and a piecewise linear approximation.Computational tests on a small-scale system and on a part of the Milano distribution network are reported.
文摘介绍了基于地理信息系统(geographic information system,GIS)的上海城市配电网规划计算机辅助决策系统的整体架构和功能设计,通过应用实例展示了系统各模块的功能和主要规划结果。该系统结合电力公司日常规划业务,充分利用现有资源,采用最新的计算机技术和配电网规划专业技术实现,优化了城市电网规划结果,同时可显著减轻规划人员的工作量。与传统规划软件相比,该系统具有较高的科学性和实用化水平,为最终实现配电网规划工作的信息化、日常化和精细化奠定了基础。