The skip-stop operation strategy (SOS) is rarely applied to Chinese urban rail transit networks because it is a simple scheme and a less universally popular transportation service. However, the SOS has performance a...The skip-stop operation strategy (SOS) is rarely applied to Chinese urban rail transit networks because it is a simple scheme and a less universally popular transportation service. However, the SOS has performance advantages, in that the total trip time can be reduced depending on the number of skipped stations, crowds of passengers can be rapidly evacuated at congested stations in peak periods, and the cost to transit companies is reduced. There is a contradiction between reducing the trip time under the SOS and increasing the passengers' waiting times under an all-stop scheme. Given this situation, the three objectives of our study were to minimize the waiting and trip times of all passengers and the travel times of trains. A comprehensive estimation model is presented for the SOS. The mechanism through which the trip time for all passengers is affected by the SOS is analyzed in detail. A 0-I integer programming formulation is established for the three objectives, and is solved using a tabu search algorithm. Finally, an example is presented to demonstrate that the estimation method for the SOS is capable of optimizing the timetable and operation schemes for a Chinese urban rail transit network.展开更多
Based on the framework of method of successive averages(MSA), a modified stochastic user-equilibrium assignment algorithm was proposed, which can be used to calculate the passenger flow distribution of urban rail tran...Based on the framework of method of successive averages(MSA), a modified stochastic user-equilibrium assignment algorithm was proposed, which can be used to calculate the passenger flow distribution of urban rail transit(URT) under network operation. In order to describe the congestion's impact to passengers' route choices, a generalized cost function with in-vehicle congestion was set up. Building on the k-th shortest path algorithm, a method for generating choice set with time constraint was embedded, considering the characteristics of network operation. A simple but efficient route choice model, which was derived from travel surveys for URT passengers in China, was introduced to perform the stochastic network loading at each iteration in the algorithm. Initial tests on the URT network in Shanghai City show that the methodology, with rational calculation time, promises to compute more precisely the passenger flow distribution of URT under network operation, compared with those practical algorithms used in today's China.展开更多
With the rapid development of urban rail transit,the traditional operation and maintenance methods mainly rely on manpower,and the pressure on equipment operation and maintenance is increasing,and the low work efficie...With the rapid development of urban rail transit,the traditional operation and maintenance methods mainly rely on manpower,and the pressure on equipment operation and maintenance is increasing,and the low work efficiency,high intensity and high operating costs have always been the main problems at this stage.Through BIM visualization technology can effectively solve those problems,the operation and maintenance mode of urban rail signal equipment at this stage is discussed,the integration and visualization of BIM technology are used to make the judgments and early warnings on the maintenance of urban rail signal equipment,and play a positive and important role in operation and maintenance work,this research result can provide ideas and references for urban rail transit operation and maintenance in the new era.展开更多
Mobile block system is a new type of block technology based on the theory of interval block. This article focuses on the analysis of safety key points, the efficient use of emergency time, the maximum efficiency of mo...Mobile block system is a new type of block technology based on the theory of interval block. This article focuses on the analysis of safety key points, the efficient use of emergency time, the maximum efficiency of mobilizers, to reduce the loss of emergency incidents and casualties.展开更多
The basic conditions of Urban rail transit line test operation are mainly based on Basic condition for trial operation of urban rail transit (GB/T30013-2013) the basic conditions of the relevant provisions, but the ...The basic conditions of Urban rail transit line test operation are mainly based on Basic condition for trial operation of urban rail transit (GB/T30013-2013) the basic conditions of the relevant provisions, but the status and standard of trial operation of the basic conditions for assessment of the operating departments are still inadequate, during the three mouth of trial running operations, the specific work of trial operation and exercise are not clear about what this study focuses. This study emphasizes on the methods of operation assessment, through the Analysis Hierarchy Process (AHP) to make the commissioning work carry out smoothly and effectively, making the running exercise Rally, and the emergency and safety follow-up operation process can be quickly handled properly, and it is also helpful to the sustainable development of urban raft transit.展开更多
Purpose–Under the constraints of given passenger service level and coupling travel demand with train departure time,this study optimizes the train operational plan in an urban rail corridor to minimize the numbers of...Purpose–Under the constraints of given passenger service level and coupling travel demand with train departure time,this study optimizes the train operational plan in an urban rail corridor to minimize the numbers of train trips and rolling stocks considering the time-varying demand of urban rail passenger flow.Design/methodology/approach–The authors optimize the train operational plan in a special network layout,i.e.an urban rail corridor with dead-end terminal yard,by decomposing it into two sub-problems:train timetable optimization and rolling stock circulation optimization.As for train timetable optimization,the authors propose a schedule-based passenger flow assignment method,construct the corresponding timetabling optimization model and design the bi-directional coordinated sequential optimization algorithm.For the optimization of rolling stock circulation,the authors construct the corresponding optimization assignment model and adopt the Hungary algorithm for solving the model.Findings–The case study shows that the train operational plan developed by the study’s approach meets requirements on the passenger service quality and reduces the operational cost to the maximum by minimizing the numbers of train trips and rolling stocks.Originality/value–The example verifies the efficiency of the model and algorithm.展开更多
Telephone occlusion method is a backup manual occlusion method during an urban rail transit signal equipment failure, which ensures that metro operated safely and orderly. Through the results of several telephone occl...Telephone occlusion method is a backup manual occlusion method during an urban rail transit signal equipment failure, which ensures that metro operated safely and orderly. Through the results of several telephone occlusion exercises, find out the shortcomings oftclcphone occlusion method and optimizing it.展开更多
The determination and optimization of Automatic Train Operation(ATO) control strategy is one of the most critical technologies for urban rail train operation. The practical ATO optimal control strategy must consider m...The determination and optimization of Automatic Train Operation(ATO) control strategy is one of the most critical technologies for urban rail train operation. The practical ATO optimal control strategy must consider many goals of the train operation, such as safety, accuracy, comfort, energy saving and so on. This paper designs a set of efficient and universal multi-objective control strategy. Firstly, based on the analysis of urban rail transit and its operating environment, the multi-objective optimization model considering all the indexes of train operation is established by using multi-objective optimization theory. Secondly, Non-dominated Sorting Genetic Algorithm II(NSGA-II) is used to solve the model, and the optimal speed curve of train running is generated.Finally, the intelligent controller is designed by the combination of fuzzy controller algorithm and the predictive control algorithm, which can control and optimize the train operation in real time. Then the robustness of the control system can ensure and the requirements for multi-objective in train operation can be satisfied.展开更多
The electricity consumption of the urban metro system can be mainly divided into the following two categories:the electricity consumption for train traction(E_(t))and the electricity consumption for station operation(...The electricity consumption of the urban metro system can be mainly divided into the following two categories:the electricity consumption for train traction(E_(t))and the electricity consumption for station operation(E_(s)).Although understanding the hourly fluctuation characteristics of E_(t) and E_(s) contributes to renewable energy inte-gration and achieving carbon emission reduction of the metro system,the hourly fluctuation characteristics have been poorly reported in the literature.Thus,a typical underground non-transfer metro station of a city’s metro system in the North China Plain is selected in this study,and E_(t) and E_(s) were monitored to portray their hourly fluctuation characteristics.Results reveal that the hourly E_(t) shows a significant intraday“U”shape on weekdays,indicating two symmetric peaks in morning and evening rush hours.While the hourly E_(s) shows an intraday“flat”shape,indicating it is nearly free from the effect of rush hour.Moreover,it is statistically proved that the train frequency is the core influencing factor resulting in the intraday fluctuation of hourly E_(t).In the case study,when the train frequency increases from the mean(20 trains per hour)to maximum(32 trains per hour),the hourly E_(t) will increase by 53.4%.展开更多
Recent innovations in transport technology are now providing mobility that is cheaper, autonomous, electric, and with improved ride quality. While much of the world’s attention has been on how this can be applied to ...Recent innovations in transport technology are now providing mobility that is cheaper, autonomous, electric, and with improved ride quality. While much of the world’s attention has been on how this can be applied to cars, there have been rapid adoption of these and other technologies in High Speed Rail and Metro Rail systems that run between and across cities. This paper shows how such innovations have now been applied to create the next generation of urban transit system called a Trackless Tram. Trackless Trams are effectively the same as traditional light rail except they run on rubber tyres avoiding disruption from construction for Light Rail, but they retain the electric propulsion (with batteries) and have high ride quality due to rail-type bogies, stabilization technologies and precision tracking from the autonomous optical guidance systems—with infrastructure costs reduced to as low as one tenth of a Light Rail system. As with Light Rail, a Trackless Tram System provides a rapid transit option that can harness the fixed route assurance necessary to unlock new land value appreciation that can be leveraged to contribute to construction and running costs whilst creating urban regeneration. The paper considers the niche for Trackless Trams in cities along with its potential for city shaping through the creation of urban re-development along corridors. The paper suggests that the adoption of Trackless Tram Systems is likely to grow rapidly as a genuine alternative to car and bus systems, supplementing and extending the niche occupied by Light Rail Transit (LRT). This appears to be feasible in any medium-sized or larger city, especially in emerging and developing economies, and case studies are outlined for Perth and Thimpu to illustrate its potential.展开更多
基金financed by the National Basic Research Program of China, under project ID 2012CB725403
文摘The skip-stop operation strategy (SOS) is rarely applied to Chinese urban rail transit networks because it is a simple scheme and a less universally popular transportation service. However, the SOS has performance advantages, in that the total trip time can be reduced depending on the number of skipped stations, crowds of passengers can be rapidly evacuated at congested stations in peak periods, and the cost to transit companies is reduced. There is a contradiction between reducing the trip time under the SOS and increasing the passengers' waiting times under an all-stop scheme. Given this situation, the three objectives of our study were to minimize the waiting and trip times of all passengers and the travel times of trains. A comprehensive estimation model is presented for the SOS. The mechanism through which the trip time for all passengers is affected by the SOS is analyzed in detail. A 0-I integer programming formulation is established for the three objectives, and is solved using a tabu search algorithm. Finally, an example is presented to demonstrate that the estimation method for the SOS is capable of optimizing the timetable and operation schemes for a Chinese urban rail transit network.
基金Project(2007AA11Z236) supported by the National High Technology Research and Development Program of ChinaProject(2012M5209O1) supported by China Postdoctoral Science Foundation
文摘Based on the framework of method of successive averages(MSA), a modified stochastic user-equilibrium assignment algorithm was proposed, which can be used to calculate the passenger flow distribution of urban rail transit(URT) under network operation. In order to describe the congestion's impact to passengers' route choices, a generalized cost function with in-vehicle congestion was set up. Building on the k-th shortest path algorithm, a method for generating choice set with time constraint was embedded, considering the characteristics of network operation. A simple but efficient route choice model, which was derived from travel surveys for URT passengers in China, was introduced to perform the stochastic network loading at each iteration in the algorithm. Initial tests on the URT network in Shanghai City show that the methodology, with rational calculation time, promises to compute more precisely the passenger flow distribution of URT under network operation, compared with those practical algorithms used in today's China.
文摘With the rapid development of urban rail transit,the traditional operation and maintenance methods mainly rely on manpower,and the pressure on equipment operation and maintenance is increasing,and the low work efficiency,high intensity and high operating costs have always been the main problems at this stage.Through BIM visualization technology can effectively solve those problems,the operation and maintenance mode of urban rail signal equipment at this stage is discussed,the integration and visualization of BIM technology are used to make the judgments and early warnings on the maintenance of urban rail signal equipment,and play a positive and important role in operation and maintenance work,this research result can provide ideas and references for urban rail transit operation and maintenance in the new era.
文摘Mobile block system is a new type of block technology based on the theory of interval block. This article focuses on the analysis of safety key points, the efficient use of emergency time, the maximum efficiency of mobilizers, to reduce the loss of emergency incidents and casualties.
文摘The basic conditions of Urban rail transit line test operation are mainly based on Basic condition for trial operation of urban rail transit (GB/T30013-2013) the basic conditions of the relevant provisions, but the status and standard of trial operation of the basic conditions for assessment of the operating departments are still inadequate, during the three mouth of trial running operations, the specific work of trial operation and exercise are not clear about what this study focuses. This study emphasizes on the methods of operation assessment, through the Analysis Hierarchy Process (AHP) to make the commissioning work carry out smoothly and effectively, making the running exercise Rally, and the emergency and safety follow-up operation process can be quickly handled properly, and it is also helpful to the sustainable development of urban raft transit.
基金funded by the National Natural Science Foundation of China(71701216,71171200).
文摘Purpose–Under the constraints of given passenger service level and coupling travel demand with train departure time,this study optimizes the train operational plan in an urban rail corridor to minimize the numbers of train trips and rolling stocks considering the time-varying demand of urban rail passenger flow.Design/methodology/approach–The authors optimize the train operational plan in a special network layout,i.e.an urban rail corridor with dead-end terminal yard,by decomposing it into two sub-problems:train timetable optimization and rolling stock circulation optimization.As for train timetable optimization,the authors propose a schedule-based passenger flow assignment method,construct the corresponding timetabling optimization model and design the bi-directional coordinated sequential optimization algorithm.For the optimization of rolling stock circulation,the authors construct the corresponding optimization assignment model and adopt the Hungary algorithm for solving the model.Findings–The case study shows that the train operational plan developed by the study’s approach meets requirements on the passenger service quality and reduces the operational cost to the maximum by minimizing the numbers of train trips and rolling stocks.Originality/value–The example verifies the efficiency of the model and algorithm.
文摘Telephone occlusion method is a backup manual occlusion method during an urban rail transit signal equipment failure, which ensures that metro operated safely and orderly. Through the results of several telephone occlusion exercises, find out the shortcomings oftclcphone occlusion method and optimizing it.
文摘The determination and optimization of Automatic Train Operation(ATO) control strategy is one of the most critical technologies for urban rail train operation. The practical ATO optimal control strategy must consider many goals of the train operation, such as safety, accuracy, comfort, energy saving and so on. This paper designs a set of efficient and universal multi-objective control strategy. Firstly, based on the analysis of urban rail transit and its operating environment, the multi-objective optimization model considering all the indexes of train operation is established by using multi-objective optimization theory. Secondly, Non-dominated Sorting Genetic Algorithm II(NSGA-II) is used to solve the model, and the optimal speed curve of train running is generated.Finally, the intelligent controller is designed by the combination of fuzzy controller algorithm and the predictive control algorithm, which can control and optimize the train operation in real time. Then the robustness of the control system can ensure and the requirements for multi-objective in train operation can be satisfied.
基金This research was supported by the Science&Technology Project of the State Grid Corporation of China(5400-202219175A-1-1-ZN)Sichuan Science and Technology Planning Project(2019YFSY0009).
文摘The electricity consumption of the urban metro system can be mainly divided into the following two categories:the electricity consumption for train traction(E_(t))and the electricity consumption for station operation(E_(s)).Although understanding the hourly fluctuation characteristics of E_(t) and E_(s) contributes to renewable energy inte-gration and achieving carbon emission reduction of the metro system,the hourly fluctuation characteristics have been poorly reported in the literature.Thus,a typical underground non-transfer metro station of a city’s metro system in the North China Plain is selected in this study,and E_(t) and E_(s) were monitored to portray their hourly fluctuation characteristics.Results reveal that the hourly E_(t) shows a significant intraday“U”shape on weekdays,indicating two symmetric peaks in morning and evening rush hours.While the hourly E_(s) shows an intraday“flat”shape,indicating it is nearly free from the effect of rush hour.Moreover,it is statistically proved that the train frequency is the core influencing factor resulting in the intraday fluctuation of hourly E_(t).In the case study,when the train frequency increases from the mean(20 trains per hour)to maximum(32 trains per hour),the hourly E_(t) will increase by 53.4%.
文摘Recent innovations in transport technology are now providing mobility that is cheaper, autonomous, electric, and with improved ride quality. While much of the world’s attention has been on how this can be applied to cars, there have been rapid adoption of these and other technologies in High Speed Rail and Metro Rail systems that run between and across cities. This paper shows how such innovations have now been applied to create the next generation of urban transit system called a Trackless Tram. Trackless Trams are effectively the same as traditional light rail except they run on rubber tyres avoiding disruption from construction for Light Rail, but they retain the electric propulsion (with batteries) and have high ride quality due to rail-type bogies, stabilization technologies and precision tracking from the autonomous optical guidance systems—with infrastructure costs reduced to as low as one tenth of a Light Rail system. As with Light Rail, a Trackless Tram System provides a rapid transit option that can harness the fixed route assurance necessary to unlock new land value appreciation that can be leveraged to contribute to construction and running costs whilst creating urban regeneration. The paper considers the niche for Trackless Trams in cities along with its potential for city shaping through the creation of urban re-development along corridors. The paper suggests that the adoption of Trackless Tram Systems is likely to grow rapidly as a genuine alternative to car and bus systems, supplementing and extending the niche occupied by Light Rail Transit (LRT). This appears to be feasible in any medium-sized or larger city, especially in emerging and developing economies, and case studies are outlined for Perth and Thimpu to illustrate its potential.