特高压(ultra high voltage,UHV)换流站阀厅的金属屋面系统在风荷载作用下易发生屋面表层风揭事故。为深入探讨该类建筑屋面的风压极值特性,基于风洞试验分别探讨了大气边界层(atmospheric-boundary-layer,ABL)风、壁面射流、均匀湍流...特高压(ultra high voltage,UHV)换流站阀厅的金属屋面系统在风荷载作用下易发生屋面表层风揭事故。为深入探讨该类建筑屋面的风压极值特性,基于风洞试验分别探讨了大气边界层(atmospheric-boundary-layer,ABL)风、壁面射流、均匀湍流三种风场作用下的屋面风压特性,比较了平均风剖面、风速、风向、湍流强度等因素对屋面风压的影响。结果表明:阀厅屋盖迎风前缘负风压最大,且控制风向角在45°左右;壁面射流风场下平均风压系数与脉动风压系数均超过大气边界层风场的结果;风速对阀厅屋盖的负风压系数均值和极值影响较小,而湍流度对风压系数的极值影响较大;大气边界风场时,JGJ/T 481—2019《屋盖结构风荷载标准》的最不利风压系数建议值偏于安全;而在壁面射流风场下,阀厅屋盖全风向最不利风压系数在所有区域都大于JGJ/T 481—2019的建议值,设计中应加以重视。展开更多
The condition monitoring and fault diagnosis have been identified as the key to achieving higher availabilities of wind turbines.Numerous studies show that the open-circuit fault is a significant contributor to the fa...The condition monitoring and fault diagnosis have been identified as the key to achieving higher availabilities of wind turbines.Numerous studies show that the open-circuit fault is a significant contributor to the failures of wind turbine converter.However,the multiple faults combinations and the influence of wind speed changes abruptly,grid voltage sags and noise interference have brought great challenges to fault diagnosis.Accordingly,concerning the open-circuit fault of converters in direct-driven PMSG wind turbine,a diagnostic method for multiple open-circuit faults is proposed in this paper,which is divided into two tasks:The first one is the fault detection and the second one is the fault localization.The detection method is based on the relative current residuals after exponential transformation and on an adaptive threshold,and the localization method is based on the average values of fault phase currents.The scheduled diagnosis method is available to both the generator-side converter and the grid-side converter,allowing to detect and locate single and double open-circuit faults.For validating this,robustness test and multiple open-circuit faults diagnosis are presented in a 2-MW direct-driven PMSG wind turbine system,the results validate the reliability and effectiveness of the proposed method.展开更多
Multi input and multi output converters are becoming popular because they are cost effective and compact. This paper proposes a multi input multi output converter for Grid-Solar power integration for uninterrupted pow...Multi input and multi output converters are becoming popular because they are cost effective and compact. This paper proposes a multi input multi output converter for Grid-Solar power integration for uninterrupted power supply. The proposed converter uses four winding transformer with two primary windings and two secondary windings. The grid supply is connected to the first winding of transformer through rectifier-inverter for controlled power transfer. The solar energy is inverted and applied to the second winding of primary. Two output ports are considered. The circuit is designed to get zero current switching during turn-off and zero voltage switching during turn-on to alleviate the switching losses. The simulation results for the proposed configuration are presented in this paper.展开更多
文摘特高压(ultra high voltage,UHV)换流站阀厅的金属屋面系统在风荷载作用下易发生屋面表层风揭事故。为深入探讨该类建筑屋面的风压极值特性,基于风洞试验分别探讨了大气边界层(atmospheric-boundary-layer,ABL)风、壁面射流、均匀湍流三种风场作用下的屋面风压特性,比较了平均风剖面、风速、风向、湍流强度等因素对屋面风压的影响。结果表明:阀厅屋盖迎风前缘负风压最大,且控制风向角在45°左右;壁面射流风场下平均风压系数与脉动风压系数均超过大气边界层风场的结果;风速对阀厅屋盖的负风压系数均值和极值影响较小,而湍流度对风压系数的极值影响较大;大气边界风场时,JGJ/T 481—2019《屋盖结构风荷载标准》的最不利风压系数建议值偏于安全;而在壁面射流风场下,阀厅屋盖全风向最不利风压系数在所有区域都大于JGJ/T 481—2019的建议值,设计中应加以重视。
基金supported by the Key Research and Development Program of Hunan Province,China under Grant 2018GK2073the Natural Science Foundation of Hunan Province,China under Grant 2019JJ50154+1 种基金the National Natural Science Foundation of China under Grant 51875199Major Technological Achievements in the Transformation of the Strategic Emerging Industry of Hunan Province of China under Grant 2018GK4024.
文摘The condition monitoring and fault diagnosis have been identified as the key to achieving higher availabilities of wind turbines.Numerous studies show that the open-circuit fault is a significant contributor to the failures of wind turbine converter.However,the multiple faults combinations and the influence of wind speed changes abruptly,grid voltage sags and noise interference have brought great challenges to fault diagnosis.Accordingly,concerning the open-circuit fault of converters in direct-driven PMSG wind turbine,a diagnostic method for multiple open-circuit faults is proposed in this paper,which is divided into two tasks:The first one is the fault detection and the second one is the fault localization.The detection method is based on the relative current residuals after exponential transformation and on an adaptive threshold,and the localization method is based on the average values of fault phase currents.The scheduled diagnosis method is available to both the generator-side converter and the grid-side converter,allowing to detect and locate single and double open-circuit faults.For validating this,robustness test and multiple open-circuit faults diagnosis are presented in a 2-MW direct-driven PMSG wind turbine system,the results validate the reliability and effectiveness of the proposed method.
文摘Multi input and multi output converters are becoming popular because they are cost effective and compact. This paper proposes a multi input multi output converter for Grid-Solar power integration for uninterrupted power supply. The proposed converter uses four winding transformer with two primary windings and two secondary windings. The grid supply is connected to the first winding of transformer through rectifier-inverter for controlled power transfer. The solar energy is inverted and applied to the second winding of primary. Two output ports are considered. The circuit is designed to get zero current switching during turn-off and zero voltage switching during turn-on to alleviate the switching losses. The simulation results for the proposed configuration are presented in this paper.