期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Research on the adjustment model of ventilation characteristic parameters based on integrated method of circuit and path
1
作者 Ting-gui JIA Shu-gang WANG +1 位作者 Guo-na QU Jian LIU 《Journal of Coal Science & Engineering(China)》 2013年第1期33-37,共5页
Ventilation characteristic parameters are the base of ventilation network solution; however, they are apt to be affected by operating errors, reading errors, airflow stability, and other factors, and it is difficult t... Ventilation characteristic parameters are the base of ventilation network solution; however, they are apt to be affected by operating errors, reading errors, airflow stability, and other factors, and it is difficult to obtain accurate results. In order to check the ventilation characteristic parameters of mines more accurately, the integrated method of circuit and path is adopted to overcome the drawbacks caused by the traditional path method or circuit method in the digital debugging process of ventilation system, which can improve the large local error or the inconsistency between the airflow direction and the actual situation caused by inaccuracy of the ventilation characteristic parameters or checking in the ventilation network solution. The results show that this method can effectively reduce the local error and prevent the pseudo-airflow reversal phenomenon; in addition, the solution results are consistent with the actual situation of mines, and the effect is obvious. 展开更多
关键词 path method circuit method ventilation network adjustment model ventilation characteristic parameter
下载PDF
Ventilation control of tunnel drilling dust based on numerical simulation 被引量:8
2
作者 JIANG Zhong-an WANG Ya-peng MEN Li-guo 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第5期1342-1356,共15页
In order to control the dust pollution produced by air leg rock drill in the trolley area during the excavation of long-distance single ended tunnel,the full-scale physical model of working face was established by usi... In order to control the dust pollution produced by air leg rock drill in the trolley area during the excavation of long-distance single ended tunnel,the full-scale physical model of working face was established by using FLUENT software,and the numerical simulation analysis of tunnel drilling ventilation and dust removal parameters was carried out.The results show that it is difficult to control the dust pollution of the face by conventional ventilation,and the drilling dust is distributed in the range of 10 m from the face;after the introduction of the long pressure and short suction ventilation scheme,when the ratio of compressed air volume to exhaust air volume is 0.72,the height of the pressure fan is 2.5 m,the distance between the pressure fan and the palm face is 20 m,and the exhaust fan is 12 m away from the palm,the dust concentration control efficiency of the working face is increased by about 60%.Therefore,in the similar long-distance single head tunnel construction,it is appropriate to adopt the dust removal method of long-distance short suction and exhaust fan to ensure the working environment. 展开更多
关键词 dust pollution working environment numerical simulation ventilation parameters
下载PDF
Correlation of Inferior Vena Cava Respiratory Variability Index with Central Venous Pressure and Hemodynamic Parameters in Ventilated Pigs with Septic Shock 被引量:3
3
作者 LIU Xiao Lei TAO Yong Kang +5 位作者 YAN Sheng Tao QI Zhi Wei LU Hai Tao WANG Hai Feng GU Cheng Dong ZHANG Guo Qiang 《Biomedical and Environmental Sciences》 SCIE CAS CSCD 2013年第6期500-503,共4页
Septic shock is a common critical condition, for which effective early fluid resuscitation is the therapeutic focus. According to the 2008 international guidelines for management of severe sepsis and septic shock, res... Septic shock is a common critical condition, for which effective early fluid resuscitation is the therapeutic focus. According to the 2008 international guidelines for management of severe sepsis and septic shock, resuscitation should achieve a central venous pressure (CVP) of 8-12 mmHg within the first 6 h. However, it is still uncertain about the sensitivity and specificity of CVP in reflecting the cardiac preload. Ultrasonography is a simple, rapid, non-invasive, and repeatable method for the measurement of sensitivity and specificity of CVP and has thus gradually attracted the increasing attention of physicians. It was reported that ultrasonography can show the inferior vena cava diameter, respiratory variability index, and blood volume in patients with sepsis or heart failure. 展开更多
关键词 CVP SVV Correlation of Inferior Vena Cava Respiratory Variability Index with Central Venous Pressure and Hemodynamic parameters in Ventilated Pigs with Septic Shock
下载PDF
Stability of multiple fans in mine ventilation networks 被引量:6
4
作者 El-Nagdy K.A. 《International Journal of Mining Science and Technology》 SCIE EI 2013年第4期558-560,共3页
In large mines,single fan is usually not enough to ventilate all the working areas.Single mine-fan approach cannot be directly applied to multiple-fan networks because the present of multiple pressures and air quantit... In large mines,single fan is usually not enough to ventilate all the working areas.Single mine-fan approach cannot be directly applied to multiple-fan networks because the present of multiple pressures and air quantities associated with each fan in the network.Accordingly,each fan in a multiple-fan system has its own mine characteristic curve,or a subsystem curve.Under some consideration,the conventional concept of a mine characteristic curve of a single-fan system can be directly extended to that of a particular fan within a multiple-fan system.In this paper the mutual effect of the fans on each other and their effect on the stability of the ventilation network were investigated by Hardy Cross algorithm combined with a switching-parameters technique.To show the validity and reliability of this algorithm,the stability of the ventilation system of Abu-Tartur Mine(one of the largest underground mine in Egypt)has been studied. 展开更多
关键词 Mine ventilation Multiple fan ventilated network Hardy Cross algorithm Switching parameters technique Abu-Tartur Mine
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部