[Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used ...[Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used as matrix,the biological grid integrated vertical flow constructed wetland system was built to strengthen treatment for black and malodorous river,and the activities of urease and phosphatase of two fillers in different functional areas of constructed wetland were tested to study the film formation property of two fillers in different functional areas.[Result]Both urease and phosphatase activities on biofilm of soft filler were significantly higher than on biofilm of honeycomb stone filler;indicating that choosing soft filler was more advantageous to the growth of biofilm;and urease activity had significant correlation with total nitrogen removal rate,while phosphatase activity had no significant correlation with total phosphorus removal rate.[Conclusion]This study provided evidences for utilizing the activities of urease and phosphatase to evaluate the purification effect of black and malodorous river and choose appropriate filler.展开更多
[Objective] The aim was to al eviate the constructed wetland clogging problems and to explore to the effects of hydraulic loading on wetland clogging. [Method] The experiment, through artificial soil columns, simulate...[Objective] The aim was to al eviate the constructed wetland clogging problems and to explore to the effects of hydraulic loading on wetland clogging. [Method] The experiment, through artificial soil columns, simulated vertical flow arti-ficial wetland, set four hydraulic load level at 50, 100, 150 and 200 cm/d, to identify the impact of hydraulic loading on wetland clogging and to explore the factors run-ning threshold. [Result] The results show that the different levels of hydraulic loading have greater impact; in the constructed wetland clogging process under high hy-draulic loading of 200 cm/d, the effective life was only six months, and the single factor can be speculated that the threshold of the hydraulic load should be at 100-150 cm/d; system can last for six months at low hydraulic loading and last for three months at medium hydraulic load. [Conclusion] The research provides references for wetland clogging experiments in future.展开更多
基金Supported by National Major Science and Technology Projects(2009ZX07317-006)National Major Science and Technology Projects(2009ZX07317-009)~~
文摘[Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used as matrix,the biological grid integrated vertical flow constructed wetland system was built to strengthen treatment for black and malodorous river,and the activities of urease and phosphatase of two fillers in different functional areas of constructed wetland were tested to study the film formation property of two fillers in different functional areas.[Result]Both urease and phosphatase activities on biofilm of soft filler were significantly higher than on biofilm of honeycomb stone filler;indicating that choosing soft filler was more advantageous to the growth of biofilm;and urease activity had significant correlation with total nitrogen removal rate,while phosphatase activity had no significant correlation with total phosphorus removal rate.[Conclusion]This study provided evidences for utilizing the activities of urease and phosphatase to evaluate the purification effect of black and malodorous river and choose appropriate filler.
基金Supported by National Natural Science Foundation of China(41071214)~~
文摘[Objective] The aim was to al eviate the constructed wetland clogging problems and to explore to the effects of hydraulic loading on wetland clogging. [Method] The experiment, through artificial soil columns, simulated vertical flow arti-ficial wetland, set four hydraulic load level at 50, 100, 150 and 200 cm/d, to identify the impact of hydraulic loading on wetland clogging and to explore the factors run-ning threshold. [Result] The results show that the different levels of hydraulic loading have greater impact; in the constructed wetland clogging process under high hy-draulic loading of 200 cm/d, the effective life was only six months, and the single factor can be speculated that the threshold of the hydraulic load should be at 100-150 cm/d; system can last for six months at low hydraulic loading and last for three months at medium hydraulic load. [Conclusion] The research provides references for wetland clogging experiments in future.