China has made many strides in large-scale development and centralized integration of wind power in recent years.The wind power penetration of some regions has reached a high level,which brings significant challenges ...China has made many strides in large-scale development and centralized integration of wind power in recent years.The wind power penetration of some regions has reached a high level,which brings significant challenges for power system dispatch due to the inherent variability and uncertainty of wind resources.To increase the dispatch capabilities of wind power generation,the spatial smoothing effect among adjacent wind farms needs to be fully utilized.This paper presents the concept of hierarchical coordinated dispatch for wind power based on a new concept of a virtual power generator.The spatial smoothing effect of wind power is analyzed first.Next,the virtual power generator method of a wind farm cluster is defined and established.Then,the hierarchical coordinated dispatch mode is compared with an existing wind power dispatch mode for individual wind farms.Finally,the proposed concept is implemented on a simulation case to demonstrate applicability and effectiveness.展开更多
The photovoltaic virtual synchronous generator(PV-VSG)solves the problem of lack of inertia in the PV power-generation system.The existing PV plants without energy storage are required to participate in the power grid...The photovoltaic virtual synchronous generator(PV-VSG)solves the problem of lack of inertia in the PV power-generation system.The existing PV plants without energy storage are required to participate in the power grid’s frequency modulation(FM),but existing PV-VSGs with energy storage have high requirements for coordinated control.Therefore,the active power reserve PV-VSG(APR-PV-VSG)is studied.Based on the different methods to obtain the maximum power point(MPP),the peer-to-peer and master-slave APR-PV-VSG strategies are proposed.The PV inverters are deviated from the MPP to reserve active power,which is used as the virtual inertia and primary FM power.These methods equip the PV power station with FM capability.The effectiveness of the proposed control strategies is verified by simulation results.展开更多
基金supported in part by Chinese National Key Technologies R&D Program(2013BAA01B03)National Natural Science Foundation of China(51190101)industrial project of State Grid Corporation of China(No.NY71-13-043).
文摘China has made many strides in large-scale development and centralized integration of wind power in recent years.The wind power penetration of some regions has reached a high level,which brings significant challenges for power system dispatch due to the inherent variability and uncertainty of wind resources.To increase the dispatch capabilities of wind power generation,the spatial smoothing effect among adjacent wind farms needs to be fully utilized.This paper presents the concept of hierarchical coordinated dispatch for wind power based on a new concept of a virtual power generator.The spatial smoothing effect of wind power is analyzed first.Next,the virtual power generator method of a wind farm cluster is defined and established.Then,the hierarchical coordinated dispatch mode is compared with an existing wind power dispatch mode for individual wind farms.Finally,the proposed concept is implemented on a simulation case to demonstrate applicability and effectiveness.
基金Supported by the Joint Funds of the National Natural Science Foundation of China(U1766207).
文摘The photovoltaic virtual synchronous generator(PV-VSG)solves the problem of lack of inertia in the PV power-generation system.The existing PV plants without energy storage are required to participate in the power grid’s frequency modulation(FM),but existing PV-VSGs with energy storage have high requirements for coordinated control.Therefore,the active power reserve PV-VSG(APR-PV-VSG)is studied.Based on the different methods to obtain the maximum power point(MPP),the peer-to-peer and master-slave APR-PV-VSG strategies are proposed.The PV inverters are deviated from the MPP to reserve active power,which is used as the virtual inertia and primary FM power.These methods equip the PV power station with FM capability.The effectiveness of the proposed control strategies is verified by simulation results.