High-capacity, post-tensioned anchors have found wide-spread use, originally in initial dam design and construction, and more recently in the strengthening and rehabilitation of concrete dams to meet modern design and...High-capacity, post-tensioned anchors have found wide-spread use, originally in initial dam design and construction, and more recently in the strengthening and rehabilitation of concrete dams to meet modern design and safety standards. Despite the advances that have been made in rock mechanics and rock engineering during the last 80 years in which post-tensioned anchors have been used in dam en- gineering, some aspects of the rock engineering design of high-capacity rock anchors for dams have changed relatively little over the last 30 or 40 years. This applies, in particular, to the calculations usually carried out to establish the grouted embedment lengths required for deep, post-tensioned anchors. These calculations usually make simplified assumptions about the distribution and values of rock-grout interface shear strengths, the shape of the volume of rock likely to be involved in uplift failure under the influence of a system of post-tensioned anchors, and the mechanism of that failure. The resulting designs are generally conservative. It is concluded that these aspects of the rock engineering design of large, post- tensioned rock anchors for dams can be significantly improved by making greater use of modern, comprehensive, numerical analyses in conjunction with three-dimensional (3D) models of the rock mass structure, realistic rock and rock mass properties, and the results of prototype anchor tests in the rock mass concerned.展开更多
The construction of fully closed check dam (CD) is a conventional flood prevention mechanism implemented on rivers. Fully closed CDs trap large amounts of sediments in rivers to stabilize the river slopes and control ...The construction of fully closed check dam (CD) is a conventional flood prevention mechanism implemented on rivers. Fully closed CDs trap large amounts of sediments in rivers to stabilize the river slopes and control erosion. However, fully closed CDs cannot selectively trap sediment and may easily overflow, causing them to losing their ability to mediate and hold sediments. Previous studies proposed the concept of “breathable CDs”. The researcher introduced metal slit dam (SD) that could be assembled and disassembled quickly and conveniently. Once a CD reaches maximum capacity, operators must ensure that the water channels of the dam are free from blockage. Moreover, they must inspect the internal accumulation conditions of the dam periodically or immediately following heavy typhoon rains. When necessary, either the sediment buildup in the upriver blockage must be cleared, or the transverse structure of the dam must be removed to allow fine particles to be discharged along with a moderate amount of water. These actions can free up the sediment-storing capacity of the dam for the next heavy typhoon rains. In addition, operators should also inspect the damages inflicted on the dam, such as erosion, wear and tear, and deformation conditions. Damaged components should be disassembled and repaired if possible, or recycled and reused. The present study performed channel tests to simulate closed CDs, SDs, steel pipe dam (SPDs), and steel pipe plus slit dam (SPSDs) for 50-year and 100-year frequency floods. Results were then analyzed to determine the sediment trapping (ST) effects of various CDs, the effects of “adjustable CDs”, and the changes of moderated riverbeds.展开更多
An overview of the GeoSafe 2016 Symposium topic is provided using the example of large concrete dams for purposes of illustration.It is essential that the risks associated with large dams be evaluated rigorously and m...An overview of the GeoSafe 2016 Symposium topic is provided using the example of large concrete dams for purposes of illustration.It is essential that the risks associated with large dams be evaluated rigorously and managed proactively at all stages of their lives so that the risk of failure remains As Low As Reasonably Practicable(ALARP).Rock engineering features of large concrete dams that require particular attention,assessment and monitoring during the investigation,design,construction,initial filling,inservice operation,and subsequent repair and upgrade stages of the lives of concrete dams are identified and illustrated by examples from recorded experiences.A number of major concrete dam failures,including that of the St.Francis dam,California,U.S.A.,in 1928,have led to significant developments in rock mechanics and rock engineering knowledge and techniques,as well as in dam design and review processes.More recent advances include a range of analytical,numerical modelling,probabilistic,reliability,failure mode and risk assessment approaches.展开更多
Characterizing the permeability variation in fractured rocks is important in various subsurface applications,but how the permeability evolves in the foundation rocks of high dams during operation remains poorly unders...Characterizing the permeability variation in fractured rocks is important in various subsurface applications,but how the permeability evolves in the foundation rocks of high dams during operation remains poorly understood.This permeability change is commonly evidenced by a continuous decrease in the amount of discharge(especially for dams on sediment-laden rivers),and can be attributed to fracture clogging and/or hydromechanical coupling.In this study,the permeability evolution of fractured rocks at a high arch dam foundation during operationwas evaluated by inverse modeling based on the field timeseries data of both pore pressure and discharge.A procedure combining orthogonal design,transient flow modeling,artificial neural network,and genetic algorithm was adopted to efficiently estimate the hydraulic conductivity values in each annual cycle after initial reservoir filling.The inverse results show that the permeability of the dam foundation rocks follows an exponential decay annually during operation(i.e.K/K0=0.97e^(-0.59t)+0.03),with good agreement between field observations and numerical simulations.The significance of the obtained permeability decay function was manifested by an assessment of the long-term seepage control performance and groundwater flow behaviors at the dam site.The proposed formula is also of merit for characterizing the permeability change in riverbed rocks induced by sediment transport and deposition.展开更多
Dam construction is an important engineering measure in dealing with the relationship between water and human being. However, with dam construction, some disadvantages to the river basin may be caused, including flow ...Dam construction is an important engineering measure in dealing with the relationship between water and human being. However, with dam construction, some disadvantages to the river basin may be caused, including flow flux of downstream changed, flooded area reduced, river species and other organisms changed and substance sedimentation. Furthermore, it brings some diseases to human being and human residential areas reduced too. Based on the basic principles of ecohydralic engineering, some countermeasures to minimize the negative effects on rivers were put forward. They are reservoir ecological regulation, ecohydraulic engineering construction and comprehensive water pollution treatment.展开更多
Siltation gradient and siltation length are important parameters for designing gravity check dams for debris flows,which directly affect the accuracy of estimates of interception capacity.At present,siltation gradient...Siltation gradient and siltation length are important parameters for designing gravity check dams for debris flows,which directly affect the accuracy of estimates of interception capacity.At present,siltation gradient calculations are based primarily on empirical values,and range from 0.4 to 0.95 times the channel slope coefficient.The middle reaches of the Bailong River are one of the four areas in China that are most severely affected by debris flow hazards.Gravity dams are widely employed in this mountainous area.However,field studies of their capacity are lacking.In this paper,the operations of check dams were investigated.Based on field investigation results and theoretical analysis,calculations for siltation gradient,siltation length,and dam storage capacity are established.The impact of debris flow density,channel slope,and particle size weight percentages are discussed.The calculations show that the theoretical values for siltation gradient are consistent with measured values with 83.6% accuracy;and theoretical values of siltation length are consistent with measured values with 91.6% accuracy.The results of this research are an important reference for optimal height and spacing of dams,estimation of dam storage capacity,and disaster prevention.展开更多
针对尾矿坝在线监测重建设、轻利用的现状,基于尾矿坝位移在线监测时间序列,通过多步逆向云变换算法(Multi-step Backward Cloud Transformation Algorithm Based on Sampling with Replacement,MBCT-SR)改进云模型,根据“3E_(n)原则”...针对尾矿坝在线监测重建设、轻利用的现状,基于尾矿坝位移在线监测时间序列,通过多步逆向云变换算法(Multi-step Backward Cloud Transformation Algorithm Based on Sampling with Replacement,MBCT-SR)改进云模型,根据“3E_(n)原则”和内外包络曲线确定在线监测位移的正常运行值,从而建立尾矿坝位移分级预警阈值模型,并利用某尾矿坝全球导航卫星(Global Navigation Satellite System,GNSS)技术表面位移在线监测数据进行实例验证。结果表明:该尾矿坝水平方向位移的黄、橙、红预警阈值分别为8.41 mm/d、12.94 mm/d、19.41 mm/d,呈现出坝体中间预警阈值最大、并由中间向两侧减小的空间变化规律;尾矿坝垂直方向位移的黄、橙、红预警阈值分别为16.56 mm/d、25.48 mm/d、38.22 mm/d,且随着子坝的堆积,预警阈值逐渐增大。展开更多
文摘High-capacity, post-tensioned anchors have found wide-spread use, originally in initial dam design and construction, and more recently in the strengthening and rehabilitation of concrete dams to meet modern design and safety standards. Despite the advances that have been made in rock mechanics and rock engineering during the last 80 years in which post-tensioned anchors have been used in dam en- gineering, some aspects of the rock engineering design of high-capacity rock anchors for dams have changed relatively little over the last 30 or 40 years. This applies, in particular, to the calculations usually carried out to establish the grouted embedment lengths required for deep, post-tensioned anchors. These calculations usually make simplified assumptions about the distribution and values of rock-grout interface shear strengths, the shape of the volume of rock likely to be involved in uplift failure under the influence of a system of post-tensioned anchors, and the mechanism of that failure. The resulting designs are generally conservative. It is concluded that these aspects of the rock engineering design of large, post- tensioned rock anchors for dams can be significantly improved by making greater use of modern, comprehensive, numerical analyses in conjunction with three-dimensional (3D) models of the rock mass structure, realistic rock and rock mass properties, and the results of prototype anchor tests in the rock mass concerned.
文摘The construction of fully closed check dam (CD) is a conventional flood prevention mechanism implemented on rivers. Fully closed CDs trap large amounts of sediments in rivers to stabilize the river slopes and control erosion. However, fully closed CDs cannot selectively trap sediment and may easily overflow, causing them to losing their ability to mediate and hold sediments. Previous studies proposed the concept of “breathable CDs”. The researcher introduced metal slit dam (SD) that could be assembled and disassembled quickly and conveniently. Once a CD reaches maximum capacity, operators must ensure that the water channels of the dam are free from blockage. Moreover, they must inspect the internal accumulation conditions of the dam periodically or immediately following heavy typhoon rains. When necessary, either the sediment buildup in the upriver blockage must be cleared, or the transverse structure of the dam must be removed to allow fine particles to be discharged along with a moderate amount of water. These actions can free up the sediment-storing capacity of the dam for the next heavy typhoon rains. In addition, operators should also inspect the damages inflicted on the dam, such as erosion, wear and tear, and deformation conditions. Damaged components should be disassembled and repaired if possible, or recycled and reused. The present study performed channel tests to simulate closed CDs, SDs, steel pipe dam (SPDs), and steel pipe plus slit dam (SPSDs) for 50-year and 100-year frequency floods. Results were then analyzed to determine the sediment trapping (ST) effects of various CDs, the effects of “adjustable CDs”, and the changes of moderated riverbeds.
文摘An overview of the GeoSafe 2016 Symposium topic is provided using the example of large concrete dams for purposes of illustration.It is essential that the risks associated with large dams be evaluated rigorously and managed proactively at all stages of their lives so that the risk of failure remains As Low As Reasonably Practicable(ALARP).Rock engineering features of large concrete dams that require particular attention,assessment and monitoring during the investigation,design,construction,initial filling,inservice operation,and subsequent repair and upgrade stages of the lives of concrete dams are identified and illustrated by examples from recorded experiences.A number of major concrete dam failures,including that of the St.Francis dam,California,U.S.A.,in 1928,have led to significant developments in rock mechanics and rock engineering knowledge and techniques,as well as in dam design and review processes.More recent advances include a range of analytical,numerical modelling,probabilistic,reliability,failure mode and risk assessment approaches.
基金The financial supports from the National Key R&D Program of China(Grant No.2018YFC0407001)the National Natural Science Foundation of China(Grant No.51925906)the Research Program of China Three Gorges Corporation(Grant No.XLD/2119)are gratefully acknowledged.
文摘Characterizing the permeability variation in fractured rocks is important in various subsurface applications,but how the permeability evolves in the foundation rocks of high dams during operation remains poorly understood.This permeability change is commonly evidenced by a continuous decrease in the amount of discharge(especially for dams on sediment-laden rivers),and can be attributed to fracture clogging and/or hydromechanical coupling.In this study,the permeability evolution of fractured rocks at a high arch dam foundation during operationwas evaluated by inverse modeling based on the field timeseries data of both pore pressure and discharge.A procedure combining orthogonal design,transient flow modeling,artificial neural network,and genetic algorithm was adopted to efficiently estimate the hydraulic conductivity values in each annual cycle after initial reservoir filling.The inverse results show that the permeability of the dam foundation rocks follows an exponential decay annually during operation(i.e.K/K0=0.97e^(-0.59t)+0.03),with good agreement between field observations and numerical simulations.The significance of the obtained permeability decay function was manifested by an assessment of the long-term seepage control performance and groundwater flow behaviors at the dam site.The proposed formula is also of merit for characterizing the permeability change in riverbed rocks induced by sediment transport and deposition.
文摘Dam construction is an important engineering measure in dealing with the relationship between water and human being. However, with dam construction, some disadvantages to the river basin may be caused, including flow flux of downstream changed, flooded area reduced, river species and other organisms changed and substance sedimentation. Furthermore, it brings some diseases to human being and human residential areas reduced too. Based on the basic principles of ecohydralic engineering, some countermeasures to minimize the negative effects on rivers were put forward. They are reservoir ecological regulation, ecohydraulic engineering construction and comprehensive water pollution treatment.
基金sponsored by the National Science and Technology Support Program (2014BAL05B01)STS Project of the Chinese Academy of Science (KFJ-EW-STS-094)Scientific Project of Department of land and resources of Sichuan Province (KJ-2015-18)
文摘Siltation gradient and siltation length are important parameters for designing gravity check dams for debris flows,which directly affect the accuracy of estimates of interception capacity.At present,siltation gradient calculations are based primarily on empirical values,and range from 0.4 to 0.95 times the channel slope coefficient.The middle reaches of the Bailong River are one of the four areas in China that are most severely affected by debris flow hazards.Gravity dams are widely employed in this mountainous area.However,field studies of their capacity are lacking.In this paper,the operations of check dams were investigated.Based on field investigation results and theoretical analysis,calculations for siltation gradient,siltation length,and dam storage capacity are established.The impact of debris flow density,channel slope,and particle size weight percentages are discussed.The calculations show that the theoretical values for siltation gradient are consistent with measured values with 83.6% accuracy;and theoretical values of siltation length are consistent with measured values with 91.6% accuracy.The results of this research are an important reference for optimal height and spacing of dams,estimation of dam storage capacity,and disaster prevention.