期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
A novel process for comprehensive utilization of vanadium slag 被引量:3
1
作者 Li-ying Liu Tao Du +2 位作者 Wen-jun Tan Xin-pu Zhang Fan Yang 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 2016年第2期156-160,共5页
Traditional processes for treating vanadium slag generate a huge volume of solid residue and a large amount of harmful gas,which cause serious environmental problems.In this study,a new process for the comprehensive u... Traditional processes for treating vanadium slag generate a huge volume of solid residue and a large amount of harmful gas,which cause serious environmental problems.In this study,a new process for the comprehensive utilization of vanadium slag was proposed,wherein zeolite A and a V2O5/TiO2 system were synthesized.The structural properties of the as-synthesized zeolite A and the V2O5/TiO2system were characterized using various experimental techniques,including X-ray diffraction,X-ray fluorescence,scanning electron microscopy,and infrared spectroscopy.The results reveal that zeolite A and the V2O5/TiO2 system are successfully obtained with high purity.The results of gas adsorption measurements indicate that the prepared zeolite A exhibits high selectivity for CO2 over N2 and is a candidate material for CO2 capture from flue-gas streams. 展开更多
关键词 vanadium slag zeolite waste utilization structural properties
下载PDF
Site Selection of Waste Slag Yard and Design of Protective Measures in Water Supply Project of Drawing from the Songhua River in Central Cities of Jilin
2
作者 Hongchao LIU Jun LV 《Meteorological and Environmental Research》 CAS 2021年第4期49-51,共3页
Water supply project of drawing from the Songhua River in central cities of Jilin is taken as research object.On the basis of analyzing project characteristics and natural conditions of the project area,site selection... Water supply project of drawing from the Songhua River in central cities of Jilin is taken as research object.On the basis of analyzing project characteristics and natural conditions of the project area,site selection of waste slag yard of water diversion project and design of water and soil conservation measures are discussed.Rationality of site selection of waste slag yard and pertinence of prevention and control measures of water and soil loss in waste slag yard are analyzed,and comprehensive utilization of waste slag in large-scale production and construction projects is explored. 展开更多
关键词 waste slag yard Layout principle Prevention and control measures Comprehensive utilization of waste slag Water supply project of drawing from the Songhua River Jilin
下载PDF
Smelting chlorination method applied to removal of copper from copper slags 被引量:6
3
作者 李磊 王华 胡建杭 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第1期59-65,共7页
In order to reasonably utilize the iron resources of copper slags, the smelting chlorination process was used to remove copper from copper slags. Higher holding temperature and O2 flow rate are beneficial to increasin... In order to reasonably utilize the iron resources of copper slags, the smelting chlorination process was used to remove copper from copper slags. Higher holding temperature and O2 flow rate are beneficial to increasing copper removal rate. However,the Cu2O mode is formed by the reaction of surplus O2 and CuCl with O2 flow rate increasing over 0.4 L/min, causing CuCl volatilization rate and copper removal rate to decrease. The resulting copper removal rate of 84.34% is obtained under the optimum conditions of holding temperature of 1573 K, residence time of 10 min, Ca Cl2 addition amount of 0.1(mass ratio of CaCl2 and the copper slag) and oxygen flow rate of 0.4 L/min. The efficient removal of copper from copper slags through chlorination is feasible. 展开更多
关键词 copper slags smelting chlorination copper removal volatilization waste utilization
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部