Taking 91105 working face as the research object, the observation method of water flowing fracture<span style="font-family:Verdana;">d</span><span style="font-family:Verdana;"> zo...Taking 91105 working face as the research object, the observation method of water flowing fracture<span style="font-family:Verdana;">d</span><span style="font-family:Verdana;"> zone and the layout of mining holes were determined by analyzing the field geological structure</span><span style="font-family:Verdana;">. </span><span style="font-family:Verdana;">It was shown that the fractured zone height and the ratio given by the measured method were 52.33 and 12.46, respectively. By the numerical simulation method with the software of UDEC, the fractured zone height and the ratio were 42.5 and 10.12. By comparison of measured height data and UDEC numerical simulation, there were some differences between the measured height and the calculated results of UDEC numerical simulation method. The method of simulation can be used as the technical basis for the design of waterproof coal pillar in the future.</span>展开更多
The study of flow behaviour of water-sand mixtures in fractured rocks is of great necessity to understand the producing mechanism and prevention of water inrush and sand gushing accidents.A self-developed seepage test...The study of flow behaviour of water-sand mixtures in fractured rocks is of great necessity to understand the producing mechanism and prevention of water inrush and sand gushing accidents.A self-developed seepage test system is used in this paper to conduct laboratory experiments in order to study the influence of the particle size distribution,the void ratio,and the initial mass of Aeolian sand on the flow behavior.It is concluded that the water flow velocity is insensitive to the initial mass of the Aeolian sand but increases with the power exponent in the Talbot formula and the specimen height.The outflow of the Aeolian sand increases with the power exponent in the Talbot formula,the specimen height,and the initial mass of the Aeolian sand.Besides,the outflow of the Aeolian sand changes exponentially with the water flow velocity.Finally,it is found that the fractured specimen has a maximum sand filtration capacity beyond which the outflow of the Aeolian sand significantly increases with the initial mass of the Aeolian sand.展开更多
Factures caused by deformation and destruction of bedrocks over coal seams can easily lead to water flooding(inrush)in mines,a threat to safety production.Fractures with high hydraulic conductivity are good watercours...Factures caused by deformation and destruction of bedrocks over coal seams can easily lead to water flooding(inrush)in mines,a threat to safety production.Fractures with high hydraulic conductivity are good watercourses as well as passages for inrush in mines and tunnels.An accurate height prediction of water flowing fractured zones is a key issue in today's mine water prevention and control.The theory of leveraging BP artificial neural network in height prediction of water flowing fractured zones is analysed and applied in Qianjiaying Mine as an example in this paper.Per the comparison with traditional calculation results,the BP artificial neural network better reflects the geological conditions of the research mine areas and produces more objective,accurate and reasonable results,which can be applied to predict the height of water flowing fractured zones.展开更多
It is very important to determine the extent of the fractured zone through which water can flow before coal mining under the water bodies.This paper deals with methods to obtain information about overburden rock failu...It is very important to determine the extent of the fractured zone through which water can flow before coal mining under the water bodies.This paper deals with methods to obtain information about overburden rock failure and the development of the fractured zone while coal mining in Xin'an Coal Mine.The risk of water inrush in this mine is great because 40%of the mining area is under the Xiaolangdi reservoir.Numerical simulations combined with geophysical methods were used in this paper to obtain the development law of the fractured zone under different mining conditions.The comprehensive geophysical method described in this paper has been demonstrated to accurately predict the height of the water-flow fractured zone.Results from the new model, which created from the results of numerical simulations and field measurements,were successfully used for making decisions in the Xin'an Coal Mine when mining under the Xiaolangdi Reservoir.Industrial scale experiments at the number 11201,14141 and 14191 working faces were safely carried out.These achievements provide a successful background for the evaluation and application of coal mining under large reservoirs.展开更多
Xin’an coal mine, Henan Province, faces the risk of water inrush because 40% of the area of the coal mine is under the surface water of the Xiaolangdi reservoir. To forecast water disaster, an effective aquifuge and ...Xin’an coal mine, Henan Province, faces the risk of water inrush because 40% of the area of the coal mine is under the surface water of the Xiaolangdi reservoir. To forecast water disaster, an effective aquifuge and a limit of water infiltration were determined by rock-phase analysis and long term observations of surface water and groundwater. By field monitoring, as well as physical and numerical simulation experiments, we obtained data reflecting different heights of a water flow fractured zone (WFFZ) under different mining conditions, derived a formula to calculate this height and built a forecasting model with the aid of GIS. On the basis of these activities, the coal mine area was classified into three sub-areas with different potential of water inrush. In the end, our research results have been applied in and verified by industrial mining experiments at three working faces and we were able to present a successful example of coal mining under a large reservoir.展开更多
In the mining process of coal mine,waterproof coal pillars should be set between the weathered oxidation zone and the first mining face.In order to determine the reasonable upper limit of the first mining face of Hong...In the mining process of coal mine,waterproof coal pillars should be set between the weathered oxidation zone and the first mining face.In order to determine the reasonable upper limit of the first mining face of Hongyi Coal Mine,the waterproof coal pillar needs to be wide enough to resist the lateral hydrostatic pressure of the oxidation zone,and to ensure that the top plate aquifer does not run through the water guide crack zone,while also liberating as much stagnant coal as possible.In this paper,the first coal mine face’s waterproof coal pillar was calculated using conventional and optimized calculation methods,taking into account the dip angle of the coal seam,the height of the water-guide crack zone,and the rock shift influence zone,and finally the upper limit of the first face of Hongyi Coal Mine was determined.展开更多
文摘Taking 91105 working face as the research object, the observation method of water flowing fracture<span style="font-family:Verdana;">d</span><span style="font-family:Verdana;"> zone and the layout of mining holes were determined by analyzing the field geological structure</span><span style="font-family:Verdana;">. </span><span style="font-family:Verdana;">It was shown that the fractured zone height and the ratio given by the measured method were 52.33 and 12.46, respectively. By the numerical simulation method with the software of UDEC, the fractured zone height and the ratio were 42.5 and 10.12. By comparison of measured height data and UDEC numerical simulation, there were some differences between the measured height and the calculated results of UDEC numerical simulation method. The method of simulation can be used as the technical basis for the design of waterproof coal pillar in the future.</span>
基金financially supported by the National Natural Science Foundation of China(Nos.41807209,51778215,51708185,and 51974293)the Young Teacher Foundation of HPU(No.2019XQG-19)+3 种基金the Henan Provincial Youth Talent Promotion Program(No.2020HYTP003)the Jiangsu Province Science Foundation for Youths(No.BK20180658)the Doctor Foundation of Henan Polytechnic University(Nos.B2017-51 and B2017-53)China Postdoctoral Science Foundation(No.2018M632422)。
文摘The study of flow behaviour of water-sand mixtures in fractured rocks is of great necessity to understand the producing mechanism and prevention of water inrush and sand gushing accidents.A self-developed seepage test system is used in this paper to conduct laboratory experiments in order to study the influence of the particle size distribution,the void ratio,and the initial mass of Aeolian sand on the flow behavior.It is concluded that the water flow velocity is insensitive to the initial mass of the Aeolian sand but increases with the power exponent in the Talbot formula and the specimen height.The outflow of the Aeolian sand increases with the power exponent in the Talbot formula,the specimen height,and the initial mass of the Aeolian sand.Besides,the outflow of the Aeolian sand changes exponentially with the water flow velocity.Finally,it is found that the fractured specimen has a maximum sand filtration capacity beyond which the outflow of the Aeolian sand significantly increases with the initial mass of the Aeolian sand.
基金funded by Royalty and Price of the Mining Right of the Ministry of Finance and the Ministry of Land and Resources in 2012 ([2012]145)
文摘Factures caused by deformation and destruction of bedrocks over coal seams can easily lead to water flooding(inrush)in mines,a threat to safety production.Fractures with high hydraulic conductivity are good watercourses as well as passages for inrush in mines and tunnels.An accurate height prediction of water flowing fractured zones is a key issue in today's mine water prevention and control.The theory of leveraging BP artificial neural network in height prediction of water flowing fractured zones is analysed and applied in Qianjiaying Mine as an example in this paper.Per the comparison with traditional calculation results,the BP artificial neural network better reflects the geological conditions of the research mine areas and produces more objective,accurate and reasonable results,which can be applied to predict the height of water flowing fractured zones.
基金the National Basic Research Program of China(No.2007CB209401) for its financial support
文摘It is very important to determine the extent of the fractured zone through which water can flow before coal mining under the water bodies.This paper deals with methods to obtain information about overburden rock failure and the development of the fractured zone while coal mining in Xin'an Coal Mine.The risk of water inrush in this mine is great because 40%of the mining area is under the Xiaolangdi reservoir.Numerical simulations combined with geophysical methods were used in this paper to obtain the development law of the fractured zone under different mining conditions.The comprehensive geophysical method described in this paper has been demonstrated to accurately predict the height of the water-flow fractured zone.Results from the new model, which created from the results of numerical simulations and field measurements,were successfully used for making decisions in the Xin'an Coal Mine when mining under the Xiaolangdi Reservoir.Industrial scale experiments at the number 11201,14141 and 14191 working faces were safely carried out.These achievements provide a successful background for the evaluation and application of coal mining under large reservoirs.
基金Project 2007CB209400 supported by the National Basic Research Program of China
文摘Xin’an coal mine, Henan Province, faces the risk of water inrush because 40% of the area of the coal mine is under the surface water of the Xiaolangdi reservoir. To forecast water disaster, an effective aquifuge and a limit of water infiltration were determined by rock-phase analysis and long term observations of surface water and groundwater. By field monitoring, as well as physical and numerical simulation experiments, we obtained data reflecting different heights of a water flow fractured zone (WFFZ) under different mining conditions, derived a formula to calculate this height and built a forecasting model with the aid of GIS. On the basis of these activities, the coal mine area was classified into three sub-areas with different potential of water inrush. In the end, our research results have been applied in and verified by industrial mining experiments at three working faces and we were able to present a successful example of coal mining under a large reservoir.
基金the Open Fund of State Key Laboratory of Water Resource Protection and Utilization in Coal Mining(Grant No.GJNY-18-73.15)the National Natural Science Foundation of China(NSFC)under grant No.41602254+2 种基金the National Natural Science Foundation of China(NSFC)under grant No.41807221the Science and Technology Innovation Project of Northwest A&F University,the Double-Class Discipline Group Dry Area Hydrology and Water Resources Regulation Research funding project(Z102022011)the Special Funding Project for Basic Scientific Research Business Fees of Central Universities(2452016179).
文摘In the mining process of coal mine,waterproof coal pillars should be set between the weathered oxidation zone and the first mining face.In order to determine the reasonable upper limit of the first mining face of Hongyi Coal Mine,the waterproof coal pillar needs to be wide enough to resist the lateral hydrostatic pressure of the oxidation zone,and to ensure that the top plate aquifer does not run through the water guide crack zone,while also liberating as much stagnant coal as possible.In this paper,the first coal mine face’s waterproof coal pillar was calculated using conventional and optimized calculation methods,taking into account the dip angle of the coal seam,the height of the water-guide crack zone,and the rock shift influence zone,and finally the upper limit of the first face of Hongyi Coal Mine was determined.
文摘分析了碎屑结构煤系地层岩体变形破坏的岩体力学特征及断裂带导水机理,认为岩体体积扩容是工作面顶板破坏内导水性增强、形成导水断裂带的根本原因.应用FLAC3D模拟分析了连续介质、大变形条件下急倾斜特厚煤层开采引起的覆岩体积应变分区特征,分为连续介质条件下的内部塑性破坏-压缩区、扩容区及外部弹性压缩区.依据垮落带形成过程中的体积变化特征,将连续介质条件下获得的内部塑性破坏-压缩区划为垮落带;扩容区划为断裂带;以分隔扩容区与外部弹性压缩区的体积应变0等值线最大高度确定防水煤柱高度.此方法应用于开滦赵各庄2137急倾斜特厚煤层开采工作面,确定上部防水煤柱高度为63.8 m.