The construction of new agricultural science requires the use of modern scientific and technological means to transform and enhance current agricultural related majors.The agricultural water conservancy engineering ma...The construction of new agricultural science requires the use of modern scientific and technological means to transform and enhance current agricultural related majors.The agricultural water conservancy engineering major,with its inherent disciplinary advantages,plays an indispensable and important role in the construction of new agricultural science.In recent years,the lack of professional cognitive education has gradually become a significant problem in the training of talents in agricultural water conservancy engineering.Therefore,this paper deeply analyzes the problems and reasons faced by professional cognitive education,and proposes specific educational strategies for several key aspects such as enrollment promotion,freshman enrollment education,construction of teacher team,combination of scientific research and teaching,and strengthening professional cognition through competition activities.It aims to provide reference for improving the quality of professional cognitive education and exploring effective ways.展开更多
The Shandong Water Conservancy Engineering Machinery General Factory is a specialized factory for the production of engineering machinery, approvcd by the Ministry of Water Resources. It was one of the first specializ...The Shandong Water Conservancy Engineering Machinery General Factory is a specialized factory for the production of engineering machinery, approvcd by the Ministry of Water Resources. It was one of the first specialized factories for the production of wheel loaders. Wheel loaders have been produced by the factory for about 20 years, and it has formed the Wild Ox brand 13 ton small and medium-sized loader series. These products sell well展开更多
There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protect...There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protection technology,formulating reasonable construction measures,and ensuring the smooth and efficient implementation of construction have been receiving increasing attention.展开更多
For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitorin...For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high展开更多
This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D ...This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D visualization based on GIS, then discusses the method of constructing 3D visual digital model, and then introduces the terrain digital technology, feature modeling technology. Finally, the technical route shows that this method has good practicability.展开更多
A comprehensive safety evaluation system taking the most influential factors into account has been developed to evaluate the reliability of hydraulic metal structures. Applying the techniques of AI and DB, the idea of...A comprehensive safety evaluation system taking the most influential factors into account has been developed to evaluate the reliability of hydraulic metal structures. Applying the techniques of AI and DB, the idea of a one-machine and three-base system is proposed. The framework of the three-base system has been designed and the structural framework constructed in turn. A practical example is given to illustrate the process of using this system and it can be used for comparison and analysis purposes. The key technology of the system is its ability to reorganize and improve the expert system's knowledge base by establishing the expert system. This system utilizes the computer technology inference process, making safety evaluation conclusions more reasonable and applicable to the actual situation. The system is not only advanced, but also feasible, reliable, artificially intelligent, and has the capacity to constantly grow.展开更多
61 specialists and scholars assembled at the Institute of Xinjiang ShiheziAgriculture from August 25 to 30,1988,for a seminar on cavitation and cavitationerosion occurred in water conservancy and hydroelectric enginee...61 specialists and scholars assembled at the Institute of Xinjiang ShiheziAgriculture from August 25 to 30,1988,for a seminar on cavitation and cavitationerosion occurred in water conservancy and hydroelectric engineering.The partici-pants came from 33 design and research institutes,universities,factories allover the country.The main subjects under discussion of the conference are:1.展开更多
基金Supported by Key Project of the"14 th Five-year"Plan for Education Science in Heilongjiang Province in 2022(GJB1422016).
文摘The construction of new agricultural science requires the use of modern scientific and technological means to transform and enhance current agricultural related majors.The agricultural water conservancy engineering major,with its inherent disciplinary advantages,plays an indispensable and important role in the construction of new agricultural science.In recent years,the lack of professional cognitive education has gradually become a significant problem in the training of talents in agricultural water conservancy engineering.Therefore,this paper deeply analyzes the problems and reasons faced by professional cognitive education,and proposes specific educational strategies for several key aspects such as enrollment promotion,freshman enrollment education,construction of teacher team,combination of scientific research and teaching,and strengthening professional cognition through competition activities.It aims to provide reference for improving the quality of professional cognitive education and exploring effective ways.
文摘The Shandong Water Conservancy Engineering Machinery General Factory is a specialized factory for the production of engineering machinery, approvcd by the Ministry of Water Resources. It was one of the first specialized factories for the production of wheel loaders. Wheel loaders have been produced by the factory for about 20 years, and it has formed the Wild Ox brand 13 ton small and medium-sized loader series. These products sell well
文摘There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protection technology,formulating reasonable construction measures,and ensuring the smooth and efficient implementation of construction have been receiving increasing attention.
基金supported by the National Natural Science Foundation of China(Grants No.51179108and50909066)the Key Research Foundation of Nanjing Hydraulic Research Institute(Grant No.Y711007)
文摘For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high
文摘This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D visualization based on GIS, then discusses the method of constructing 3D visual digital model, and then introduces the terrain digital technology, feature modeling technology. Finally, the technical route shows that this method has good practicability.
基金supported by the National Natural Science Foundation of China (Grant No. 50539010)
文摘A comprehensive safety evaluation system taking the most influential factors into account has been developed to evaluate the reliability of hydraulic metal structures. Applying the techniques of AI and DB, the idea of a one-machine and three-base system is proposed. The framework of the three-base system has been designed and the structural framework constructed in turn. A practical example is given to illustrate the process of using this system and it can be used for comparison and analysis purposes. The key technology of the system is its ability to reorganize and improve the expert system's knowledge base by establishing the expert system. This system utilizes the computer technology inference process, making safety evaluation conclusions more reasonable and applicable to the actual situation. The system is not only advanced, but also feasible, reliable, artificially intelligent, and has the capacity to constantly grow.
文摘61 specialists and scholars assembled at the Institute of Xinjiang ShiheziAgriculture from August 25 to 30,1988,for a seminar on cavitation and cavitationerosion occurred in water conservancy and hydroelectric engineering.The partici-pants came from 33 design and research institutes,universities,factories allover the country.The main subjects under discussion of the conference are:1.