期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Floodwater utilization of the Three Gorges Project
1
作者 董前进 《Journal of Chongqing University》 CAS 2009年第2期82-88,共7页
Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it... Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it’s imperative to strengthen flood management. In light of the hydrological characteristics of the Three Gorges Project (TGP) on the Yangtze River in P. R. China, we investigated the necessity and feasibility of TGP floodwater utilization, proprosed dynamic control of limited water level during flood season of the reservoir and basin-wide integrated floodwater management as strategies, and identified problems that might occur in practice. 展开更多
关键词 flood control flood managementi floodwater utilization limited water level in flood seasons Three Gorges Project .
下载PDF
Risk analysis of dynamic control of reservoir limited water level by considering flood forecast error 被引量:16
2
作者 ZHANG YanPing WANG GuoLi +1 位作者 PENG Yong ZHOU HuiCheng 《Science China(Technological Sciences)》 SCIE EI CAS 2011年第7期1888-1893,共6页
Flood control forecast operation mode is one of the main ways for determining the upper bound of dynamic control of flood limited water level during flood season. The floodwater utilization rate can be effectively inc... Flood control forecast operation mode is one of the main ways for determining the upper bound of dynamic control of flood limited water level during flood season. The floodwater utilization rate can be effectively increased by using flood forecast information and flood control forecast operation mode. In this paper, Dahuofang Reservoir is selected as a case study. At first, the distribution pattern and the bound of forecast error which is a key source of risk are analyzed. Then, based on the definition of flood risk, the risk of dynamic control of reservoir flood limited water level within different flood forecast error bounds is studied. The results show that, the dynamic control of reservoir flood limited water level with flood forecast information can increase the floodwater utilization rate without increasing flood control risk effectively and it is feasible in practice. 展开更多
关键词 flood forecast error flood control forecast operation mode dynamic control of flood limited water level risk analysis Dahuofang Reservoir
原文传递
The relationship between water level change and river channel geometry adjustment in the downstream of the Three Gorges Dam 被引量:12
3
作者 杨云平 张明进 +2 位作者 孙昭华 韩剑桥 王建军 《Journal of Geographical Sciences》 SCIE CSCD 2018年第12期1975-1993,共19页
In this study, data measured from 1955–2016 were analysed to study the relationship between the water level and river channel geometry adjustment in the downstream of the Three Gorges Dam(TGD) after the impoundment... In this study, data measured from 1955–2016 were analysed to study the relationship between the water level and river channel geometry adjustment in the downstream of the Three Gorges Dam(TGD) after the impoundment of the dam. The results highlight the following facts:(1) for the same flow, the low water level decreased, flood water level changed little, lowest water level increased, and highest water level decreased at the hydrological stations in the downstream of the dam;(2) the distribution of erosion and deposition along the river channel changed from "erosion at channels and deposition at bankfulls" to "erosion at both channels and bankfulls;" the ratio of low-water channel erosion to bankfull channel erosion was 95.5% from October 2002 to October 2015, with variations between different impoundment stages;(3) the low water level decrease slowed down during the channel erosion in the Upper Jingjiang reach and reaches upstream but sped up in the Lower Jingjiang reach and reaches downstream; measures should be taken to prevent the decrease in the channel water level;(4) erosion was the basis for channel dimension upscaling in the middle reaches of the Yangtze River; the low water level decrease was smaller than the thalweg decline; both channel water depth and width increased under the combined effects of channel and waterway regulations; and(5) the geometry of the channels above bankfulls did not significantly change; however, the comprehensive channel resistance increased under the combined effects of riverbed coarsening, beach vegetation, and human activities; as a result, the flood water level increased markedly and moderate flood to high water level phenomena occurred, which should be considered. The Three Gorges Reservoir effectively enhances the flood defense capacity of the middle and lower reaches of the Yangtze River; however, the superposition effect of tributary floods cannot be ruled out. 展开更多
关键词 low water level flood water level riverbed adjustment cause analysis Three Gorges Dam middle and lower reaches of the Yangtze River
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部